QASP - JWC Housekeeping.pdf
PDF 308 KB Posted
- Attached to
- S201--JWC Janitorial Contract
- Solicitation number
- 36C25026Q0293
About this file
Quality Assurance Surveillance Plan (QASP) - Housekeeping Services Contract
This is a Quality Assurance Surveillance Plan (QASP) document that establishes government oversight procedures for a housekeeping services contract. The plan defines performance standards, surveillance methods, acceptable quality levels (AQL), and remedial actions for contractor performance deficiencies. The Contracting Officer (CO) and Contracting Officer's Representative (COR) are responsible for administering the plan, with the COR serving as the primary point of contact for surveillance activities and complaint management. The contractor bears sole responsibility for quality control and management actions necessary to meet contractual standards.
The QASP establishes ten performance requirements with corresponding standards and AQL thresholds: All Floors (not to exceed 2 customer complaints per month, daily observations), Trash Removal (2 complaints per month, monthly COR inspection), Clean Interior & Exterior Doors/Glass/Mirrors (2 complaints per month, monthly inspection), Carpeting (2 complaints per month, daily observations), General Cleaning (2 complaints per month, monthly inspection), General Dusting (2 complaints per month, monthly inspection), Basic Restroom Cleaning (2 complaints per month, daily observations), Sweep and Mop Floors (2 complaints per month, daily observations), Stock Restroom Supplies (2 complaints per month, monthly inspection), and Reporting (submission of biweekly and monthly inspection reports within specified timeframes). The principal surveillance method is random sampling of areas described in the Performance Work Statement, supplemented by customer complaints, periodic checklist inspections, and 100% inspections where appropriate. When deficiencies exceed AQL thresholds, the COR issues a Contract Discrepancy Report (CDR) requiring the contractor's written explanation of corrective actions and prevention measures. Failure to meet performance standards results in unfavorable performance evaluations and potential cure notice or task order termination actions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026Q0293 0005.docx | DOCX document | |
| 36C25026Q0293 0004.docx | DOCX document | |
| 36C25026Q0293 0003.docx | DOCX document | |
| 36C25026Q0293 0002.docx | DOCX document | |
| 36C25026Q0293 0001.docx | DOCX document | |
| JWC VA Clinic Site-Floor Plan.pdf | ||
| 36C25026Q0293.docx | DOCX document | |
| VHA DIrective1850_D_2023-01-30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. INTRODUCTION - This QAE (Quality Assurance Evaluator) Plan has been developed to implement a housekeeping service contract. It is designed to aid the Government's QAE in providing effective and systematic surveillance of all aspects of housekeeping services. This plan provides for monitoring all contract requirements through a combination of methods.
a. Methods of Surveillance
i. Periodic Surveillance by the COR: The COR periodically observes the areas to verify that the contractor is meeting the goals of the contract; and when COR receives a complaint to necessitate surveillance.
ii. Customer complaint: The COR is the point of contact and will collect all customer complaints. The COR will review all complaints and contact the originator to determine the validity of any claims.
Customer complaints will become a permanent part of the COR surveillance records.
iii. 100% Inspections: Complete evaluation of the performance element.
b. Random Sampling:
i. The principal method of surveillance will be the random sampling of the areas described in the PWS to be cleaned. The PWS has a detailed Cleaning Frequency Chart with all areas and buildings to be cleaned, frequency and expectation. The PWS also includes: Requirement for Specific Tasks, Periodic Cleaning Services and Requirements for Specific Tasks.
ii. Tasks not surveyed by random sampling will be covered by daily observation in some cases or by use or periodic checklist inspections. Appropriate checklists are provided for recording observations in this type of surveillance.
iii. The Objective of this surveillance plan is to evaluate how the Contractor is performing in key areas. We are primarily interested in the final product or service being provided and not in the details of accomplishment.
2. PURPOSE - This quality assurance surveillance plan (QASP) is a government-developed and applied document used to make systematic quality assurance methods used in the administration of the performance-based service acquisition (PBSA) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents and that the government receives the quality of services called for in the contract.
a. Authority - Authority to issue this QASP is provided under Federal Acquisition Clause (FAR) 52.212-4(a) Inspection and Acceptance, which provided for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the contracting officer or a duly appointed representative.
b. Scope - The contractor, and not the government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract. The QASP is put in place to provide government surveillance oversight of the contractor’s quality control efforts to assure that they are timely, effective, and delivering the results specified in the contract. The QASP is not a part of the contract, nor is it intended to duplicate the contractor’s quality control plan.
3. GOVERNMENT ROLES AND RESPONSIBILITIES
a. Roles
i. Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the government.
ii. Contracting Officer’s Representative (COR) - An individual designated in writing by the contracting officer to act as his or her authorized representative to assist in administering a contract. The source and authority for a COR is from the contracting officer. COR limitations are contained in the written letter of designation.
b. Responsibilities
i. Contracting Officer - The contracting officer ensures performance of all necessary actions for effective contracting and ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the contracting officer who assures that the contractor receives impartial, fair, and equitable treatment under the contract. The contracting officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
ii. COR - The COR is responsible for technical administration of the contract and assures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the contracting officer for action.
4. PROCEDURES - This surveillance plan has been organized to facilitate use by the QAE. It is the QAE's responsibility to develop a daily, weekly, monthly and/or semi-annual schedule for activities based on the surveillance plan's requirements. The daily, weekly, monthly and/or semi-annual schedule will be completed as stated and a copy will be submitted to a CO or other management official for information and review by an assigned workday of the week / month.
a. To build the inspection schedule, the QAE will select areas and times for the random sampling using the procedures shown in the surveillance plan. Periodic checklist items to be surveyed during the daily, weekly, monthly and/or semi-annual will be programmed into the schedule to facilitate their accomplishment. This monthly schedule should show what the QAE is monitoring each day.
Changes will be posted weekly and copies sent to appropriate officials. The reasons for changes will be fully documented and explained. Actual surveillance activity must be comparable to the schedule. The responsible management official must be able to observe a QAE's performance by using the schedules, as updated. One should be able to conduct a complete audit trail from the schedules by observing the QAE perform sampling or other checklist surveillance, and completion of tally and other checklists. An auditor should be able track from the above items to the management's actions (performance rating deductions or other actions as necessary if contract service is being performed), described on a Contractor Deficiency Report (CDR).
b. Weekly / Monthly tally checklists will be prepared for each sampling guide and will be used to record information on observations and defects. Each observation in the sampling will be recorded on the tally checklists. These documents will then become a formal record for later reference. The tally of observations and defects at the end of each month will be compared to the acceptable number of defects appearing in the relevant sampling guide. Any errors detected during the course of the surveillance, even if not of sufficient degree to render the service unsatisfactory in terms of the AQL parameters, will require corrective action by the Contractor. Errors detected by the QAE in the course of surveillance will be communicated to the Contractor. Notification of errors will take place within 1 working day. Specifics concerning any errors should be recorded on the tally checklist. The Contractor should be asked to initial this record.
c. If the sampling guide indicates that the number of defects is too high, the current month's service will be considered unsatisfactory. If performance in any area is judged unsatisfactory, based on random sampling or other criteria as set forth in the Performance Work Statement, a Contractor will be given a CDR by the COR. When completed and signed, the CDR, along with the tally checklist becomes the documentation supporting an unfavorable performance evaluation for Contractor provided services.
d. There are some requirements in a contract which are more conveniently monitored on an individual periodic basis. For example, a Contractor is required to provide continuing training. When these items are checked (quarterly and monthly, for example), the deficiencies will be recorded on the appropriate checklist. When these items are discovered to be unsatisfactory, actions as described above will be taken. For the number of allowable defects, see the Performance Objective in the
PWS.
5. Performance Standards - Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Performance Requirements Summary Chart
Performance Requirement
Performance Standard AQL – Maximum Allowable Degree of Deviation
Method of Surveillance
Incentive & Disincentive
1. All Floors
Clean, free of dust, lint and stains; no floor build-up or accumulation of soil in corners and along edges;
free of heel and scuff marks; free of discolored floor finish; high luster.
Grout shall be free of soil and mildew.
Clean and clear; no floor finish build-up; no mop marks; no accumulation of soil in corners; intact around room (firmly affixed to wall with no sign of being loose at juncture with floor)
Not to exceed 2 customer complaints per month
Daily observations
Incentive:
Favorable contractor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
a. Any additional expense caused by contractor delay is borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to meet the delivery requirement.
2. Trash Removal
Clean inside and out;
liner in place; shall not be dented or cracked.
Collect waste and recyclable materials in the facility and transport to designated locations.
Clean inside and out;
liner in place; shall not be dented or cracked.
Pick up lab waste and sharps daily and move to Hazardous Waste location in the Warehouse.
Not to exceed 2 customer complaints per month
COR monthly inspection
Incentive:
Favorable contractor performance evaluation.
borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to meet the delivery requirement.
3. Clean Interior & Exterior Doors Glass/ Mirrors
Clean, free of marks;
finish intact; kick plate clean, top is free of dust and lint; edges are clean;
handle or knob is clear and clean; hinge facing and door frame are clean and free of dust;
door vent is clean and free of dust and lint;
window frame is clean and free of dust and lint (inside and outside).
Clean, free of spots and streaks; frame top and edges free of dust and lint; shelf clean, free of spots and streaks.
Interior glass clear and clean; window frames clean; glazing intact and clean; paint in good condition; screens clean.
Not to exceed 2 customer complaints per month
COR monthly inspection
Incentive:
Favorable contractor performance evaluation.
borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to meet the delivery requirement.
4. Carpeting No stains; dust free along edges and under furniture.
Clean and clear; no floor finish build-up; no mop marks; no accumulation of soil in corners; intact around room (firmly affixed to wall with no sign of being loose at juncture with floor).
Not to exceed 2 customer complaints per month
Daily observations
Incentive:
Favorable contractor performance evaluation.
borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to
5. General Cleaning
Perform cleaning on a continual basis.
Cleaning includes but is not limited to removing or cleaning smudges, fingerprints, marks, streaks, spills, etc., from all walls, partitions, vents, grillwork, doors, door guards, door handles push bars, kick plates, light switches, upholstered furniture, pictures, picture frames, temperature controls and fixtures.
After cleaning, the surfaces shall have a clean, uniform appearance, free of streaks, spots, and other evidence of soil.
Not to exceed 2 customer complaints per month
COR monthly inspection
Incentive:
Favorable contractor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
a. Any additional expense caused by contractor delay is borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to meet the delivery requirement.
6. General Dusting
All horizontal surfaces shall be dusted or cleaned to eliminated dust collection
Not to exceed 2 customer complaints per month
COR monthly Inspection
Incentive:
Favorable contractor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
a. Any additional expense caused by contractor delay is borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to
7. Basic Restroom Cleaning
Contractor shall accomplish all cleaning tasks to meet the requirements of this Performance Work Statement.
Not to exceed 2 customer complaints per month
Daily observations
Incentive:
Favorable contractor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
a. Any additional expense caused by contractor delay is borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to meet the delivery requirement.
8. Sweep and Mop Floors
After sweeping and mopping the entire floor surface, including grout, shall be free from litter, dirt, dust and debris.
Grout on wall and floor tiles shall be free of dirt, scum, mildew, residue, etc.
Floors shall have a uniform appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water.
Moveable items shall be tilted or moved to sweep and damp mop underneath.
Floors shall be stripped, scrubbed, waxed, etc. as necessary to maintain sanitary conditions and a clean uniform appearance.
Not to exceed 2 customer complaints per month
Daily observations
Incentive:
Favorable contractor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
a. Any additional expense caused by contractor delay is borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to
9. Stock Restroom Supplies
Contractor shall ensure all restrooms are stocked at all times, sufficiently so that supplies including liquid soap for dispensers and toilet and hand tissue do not run out.
Supplies shall be stored in designated areas.
No overstocking shall be allowed.
Contractor shall be responsible for providing all required restroom supplies (for all restrooms), i.e. hand soap, tissues (toilet, hand), paper towels.
Supplies shall be of the quality appropriate to a fine hotel.
Not to exceed 2 customer complaints per month
COR monthly inspection
Incentive:
Favorable contractor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
a. Any additional expense caused by contractor delay is borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to
10. Reporting Contractor shall ensure completion of biweekly inspection reports by the onsite supervisor and monthly site visits and QA inspection reports by the contract manager
Reports shall be received by COR no later than 2 weeks after the last date covered by the report (i.e. if a biweekly report covers January 1st through January 14th, the report shall be received no later than January 28th).
COR monthly inspection
Incentive:
Favorable contractor performance evaluation.
Disincentive: Unfavorable contractor performance evaluation.
a. Any additional expense caused by contractor delay is borne by the contractor.
b. Delays not approved by the CO/COR may cause Cure Notice action and or termination of the task order.
c. Contract Discrepancy Report (CDR) may be issued on the first instance of failure to
6. PERFORMANCE REQUIREMENTS SUMMARY METHOD OF APPLICATION
a. The Contractor is required to perform all the work specified in the PWS. If the contractor fails to perform a specific element of the work, performance rating for the task in question shall be subject to reductions as specified. The purpose of this section is to:
i. List the contract requirements considered most critical to acceptable contract performance.
ii. Show, where applicable, the maximum allowable degree of deviation from perfect performance for each requirement that shall be allowed by the Government before contract performance is considered unsatisfactory. This is known as the AQL and represents the level of service and quality required.
iii. Explain the quality assurance methods the Government will use to evaluate the Contractor's performance in meeting the contract requirements.
iv. Define the procedure the Government shall use in reducing the Contractor's performance rating if the Contractor does not render satisfactory performance.
b. The criteria for acceptable and unacceptable performance are as follows:
i. When the number of deficiencies in the Contractor's performance discovered by the Facility COR exceeds the unacceptable criteria level, the COR with involvement and concurrence of the Contracting Officer (CO) shall be required to complete a CDR (Contract Discrepancy Report). The CDR will require the Contractor to explain in writing to the CO why performance was unacceptable, how performance shall be returned to acceptable levels, and how recurrence of the problem shall be prevented in the future.
c. Other Requirements: The criteria for other requirements are the level of performance deemed acceptable to the Government. When the number of defects discovered by the Facility COR exceeds the number shown in the AQL column, a CDR, as described above will be issued.
d. The Performance Rating of the Contractor shall be reduced for unsatisfactory performance. During each month, Contractor performance will be compared to contract standards and acceptable quality levels using the Quality Assurance Plan. If performance in any required service is unsatisfactory for the period of surveillance (monthly, quarterly, etc.) and the poor performance is clearly the fault of the Contractor, a non-favorable rating shall be given for the service as stated in the fifth column of the Performance Requirements Summary.
7. CUSTOMER COMPLAINT SERVEILLANCE
a. The checklist contains those contract requirements that can best be monitored by the individual or activity receiving the service. At the start of the contract, the QAE shall instruct customers on the requirements of the contract and on the proper method to complete the customer complaint form. A written copy of the specific contract requirement will be provided to each customer. Customers shall be required to submit the customer complaint record form within 1 working day of the discovery of the discrepancy.
b. Once each quarter, the QAE will contact each customer to assure that there is an understanding of the contract requirements. The QAE will document the annual visits.
c. When a complaint is received, the QAE will verify the complaint. If the complaint is valid, the QAE will notify the Contractor of VA management whoever is applicable of the defect in writing. The QAE will retain the complaint form in the files. At the end of each month, all validated complaints will be tabulated to determine satisfactory or unsatisfactory performance, in each are, based on the criteria in the AQL column in the "Performance Requirements Summary."
Attachment 1: Customer Complaint Record
Attachment 2: Contract Discrepancy Report
Attachment 1 - Customer Complaint Record
Customer Complaint Record Date
Time
Source of Complaint Name Patient Employee
Office: if employee
Phone
Nature of Complaint Detailed Description
(to include names of anyone associated with complaint)
Complaint Filers Signature
Complaint Review Date
Time
Name of Reviewer
Detailed Review
(to include names, dates, times, facts, etc.)
Complaint Valid Yes No
Contractor Notification of Valid Complaint Date
Time
Method
Contractor POC Notified
Title
Contractor Response
Follow up /Contracting Notification
Any Follow up Information
Contracting Notified
Yes No Date Notified
Complaint Reviewers Signature
Attachment 2 – Contract Discrepancy Report
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. Report Number for this Discrepancy
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED
b. Returned by Contractor: c. Action Complete
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
Contractor notified
COR
Contracting Officer
File details come from the government source that posted it. Updated .