This is a Quality Assurance Surveillance Plan (QASP) for monitoring contractor performance on instructor services, curriculum development support, and programmatic support for the Collateral Damage Estimation Program at the Joint Targeting School (JTS). The QASP establishes systematic surveillance methods to verify that the contractor performs all services required by the Performance Work Statement in a timely, accurate, and complete manner.
The plan measures performance across five key elements: Contractor Quality Control Plan (subject to quarterly COR inspection with 100% compliance required), Contract Deliverables (100% inspection by COR with >95% of deliverables required to be submitted timely and without rework), Overall Contract Performance (annual COR assessment requiring all elements to be rated Satisfactory or higher), Invoicing (monthly review requiring 100% accuracy), and schedule and cost monitoring. Performance standards address schedule adherence against established due dates and milestones, deliverable quality and timeliness against specifications in the Quality Control Plan, monthly cost voucher review, and past performance evaluation per FAR 42.15. Surveillance methods include random or planned sampling, periodic inspection, validated customer complaints, student critiques evaluating instructor efficiency, and supervisor evaluations 90 days post-course completion assessing course content efficacy. The contractor faces disincentives for unsatisfactory performance, including potential contract termination, loss of future contracts, and non-exercise of available options. Contract Discrepancy Reports (CDRs) are issued for items not meeting acceptable levels, requiring written contractor response within 5 days. The contractor is incentivized to maintain quality through the requirement to replace or correct deficient work at no additional cost to the Government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N0018926QD1210002 SF 30.pdf | ||
| Solicitation Amendment N0018926QD1210001 SF 30.pdf | ||
| Solicitation - N0018926QD121.pdf | ||
| JTS PWS.pdf | ||
| DD 254.pdf | ||
| PAST PERFORMANCE INFORMATION FORM.docx | DOCX document | |
| CONTRACT ADMINISTRATION PLAN (CAP) FFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of instructor services, curriculum development support, and programmatic support for the Collateral Damage Estimation Program at the
Joint Targeting School (JTS) is the timely, accurate and thorough completion of all contract/task order requirements.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) and the Quality Control Plan (QCP) for the required content, quality, timeliness, and accuracy.
c. Cost - The COR will review monthly cost vouchers to monitor the contractor’s expenditures throughout the contract and/or task order performance period(s).
d. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints. Student critiques are considered to evaluate instructor efficiency and evaluations from the students’ supervisors (90 days post course completion) are considered to evaluate the efficacy of the course content.
4. Performance Measurement: Performance will be measured in accordance with the following table:
Performance
Element
Performance
Requirement
Surveillance Method Frequency Acceptable
Quality Level
Contractor Quality
Control Plan
QC activities, inspections, and corrective actions completed as required by the plan.
Inspection by the COR Quarterly for overall
QC activities;
100% Compliance with the contractor plan.
As Required for corrective actions.
(If required by the contract)
Contract
Deliverables
Contract deliverables furnished as prescribed in the PWS, attachments, CDRLs, Task Orders, etc., as applicable.
Inspection by the COR 100% inspection of all contract deliverables.
>95% of deliverables submitted timely and without rework required.
Overall Contract
Performance
Overall contract performance of sufficient quality to earn a
Satisfactory (or higher) rating in the COR’s annual report on Contractor
Performance
Assessment by the COR Annual All performance elements rated Satisfactory (or higher)
Invoicing Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice
Monthly 100% accuracy
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/task order may result in the non-exercise of available options
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional fee, to replace or correct work that fails to meet contract requirements. To maximize the profit earned on costs incurred, the contractor is incentivized to ensure that quality products are provided in a timely manner.