This is a Quality Assurance Surveillance Plan (QASP) document for utility critical water testing services at the Asheville VA Medical Center. The QASP establishes performance standards and surveillance methodology to monitor contractor compliance with service requirements throughout contract execution. The document outlines specific quality metrics, inspection procedures, and acceptance criteria that the government will use to evaluate whether the contractor is meeting contractual obligations for water testing activities, including frequency of testing, accuracy of results, documentation standards, and timeliness of deliverables. Surveillance activities include monitoring test result submissions, verifying proper sampling procedures, reviewing laboratory certifications and qualifications, and conducting periodic audits of contractor performance records. The QASP defines performance thresholds that must be maintained to avoid corrective action notices or contract penalties, ensuring that utility water testing at the medical facility meets all applicable health, safety, and regulatory standards throughout the contract period.

View the file

Other files

File Type Posted
36C24626Q0660 0002.docx DOCX document
Amendment Attachment 2 PWS -Amended Critical Water Testing Contract June 2026.docx DOCX document
36C24626Q0660 0001.docx DOCX document
Amendment Attachment 1 - Vendor Questions and Answers.docx DOCX document
P07 Wage Determination Asheville 5.13.26.txt TXT text file
36C24626Q0660.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) Contract # 36C24626P0660

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The contractor shall be evaluated in accordance with the following QASP.

For: Asheville Veterans Affairs Medical Center (VAMC), Asheville, NC

Contract Number: 36C24626P0660

Contract Description: Utility Critical Water Testing

Contractor’s name: TBD

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

1. What shall be monitored.

1. How monitoring shall take place.

1. Who shall conduct the monitoring.

1. How monitoring efforts and results shall be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Harold L. McQuillia, Jr. / 757-315-3430 / harold.mcquillia@va.gov

b. Point of Contact (POC) - The POC is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The POC shall keep a quality assurance file. The POC is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned POC: TBD

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

Program Manager – TBD

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

ID
Performance Objective
Performance Standard
AQL
Method of Surveillance
Incentives / Disincentives

The Contractor shall adhere to all requirements in accordance with Performance Work Statement (PWS) Section B.3.

The Contractor shall successfully provide the required service throughout the period of performance

95%

CO/POC periodic surveillance

Incentives: Favorable contactor performance evaluation.

Disincentive: Unfavorable contractor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level

The Contractor shall adhere to Performance Work Statement (PWS) Service Requirement in B.3, 1a provide testing services per AAMI TIR34.1:2014/®2017.
The Contractor shall successfully provide the required conformance of requirement standards service throughout the period of performance.

95%

CO/POC observation and audit

Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level

3
The Contractor shall provide all Reporting Requirements in Paragraph B.3, 3. Adhere to Testing Schedule
The Contractor shall be in compliance with Reporting requirements throughout the period of performance
100%
CO/POC

Observation and audit Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first substantiated instance of failure to provide the acceptable level

5. INCENTIVES/DISINCENTIVES

The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If repetitive or consistent the government shall take further corrective action or begin termination procedures.

Incentives/disincentives shall be based on exceeding, meeting, or not meeting performance standards.

6. PROCEDURES/METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The POC shall use the surveillance methods listed below in the administration of this QASP.

a. Direct Observation. (Can be performed periodically or through 100% surveillance.)

b. Complaints. Any complaint data is reviewed by the CO/POC – any validated complaints against a contractor will be further investigated.

c. User Survey. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance.

Neutral outcome: No more than 3 incidents of not meeting the performance standard during the period of performance.

Negative outcome: More than 3 incidents of not meeting the performance standard during the period of performance.

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the POC shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the POC and the CO shall document the discussion and place it in their respective file.

When the COR determines formal written communication is required, the POC shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor has to present this corrective action plan to the CO and POC. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the POC will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The POC shall meet with the contractor monthly to assess performance and shall provide a written assessment.

Contractor Program Manager

Point of Contract (POC)