This is an Amendment Attachment containing a Performance Work Schedule for a critical water testing contract at the Asheville Veterans Affairs Medical Center (VAMC). The scope of work requires the successful contractor to provide comprehensive testing and reporting services for utility and critical water systems in compliance with ANSI/AAMI ST108:2023 standards, including all necessary labor and materials to execute the testing program.
The contract specifies water quality parameters that must be tested and reported against defined standards outlined in Table 1. Testing requirements include utility water for flushing, washing, and rinsing applications, as well as critical water for final rinse and steam applications. The performance standards establish specific limits for pH levels (6.5-9.5 for utility water, 5.0-7.5 for critical water), conductivity (less than 500 µS/cm for utility water, less than 10 µS/cm for critical water), and total alkalinity (less than 400 mg CaCO₃/L). The contractor must demonstrate the critical water system's compliance with these established water quality standards through systematic testing and detailed reporting documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626Q0660 0002.docx | DOCX document | |
| 36C24626Q0660 0001.docx | DOCX document | |
| Amendment Attachment 1 - Vendor Questions and Answers.docx | DOCX document | |
| P07 Wage Determination Asheville 5.13.26.txt | TXT text file | |
| 36C24626Q0660.docx | DOCX document | |
| QASP.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B.3 PERFORMANCE WORK SCHEDULE
1. Scope of Work
a. The scope of this work is all labor and materials to provide testing and reporting services per ANSI/AAMI ST108: 2023 for utility and critical water systems. The goal is for the successful bidder to test the critical water system to prove compliance with Table 1:
Type of Water
| Utility Water(1) |
| Critical Water |
| Water Use |
| Units |
| Flushing/Washing/Rinsing |
| Final Rinse(2)/ Steam |
| pH(4) |
| pH |
| 6.5 – 9.5 |
| 5.0 – 7.5 |
| Conductivity (mg/L = ppm) |
| µS/cm |
| < 500 |
| < 10 |
| Total Alkalinity |
| mg CaCO3 |
/L
| < 400 |
| <8 |
| Total Hardness |
| mg CaCO3 |
/L
| < 150(3) |
| < 1 |
| Bacteria |
| CFU/mL |
| < 500 |
| < 10 |
| < 10 |
| Endotoxin |
| EU/mL |
| N/A |
| < 10 |
| < 10 |
| Total Organic Carbon (TOC) |
| mg/L |
| N/A |
| N/A |
| < 1.0 |
| Color and Turbidity |
| Visual |
| Colorless, clear, without sediment |
| Colorless, clear, without sediment |
| Colorless, clear, without sediment |
NOTE 1: This is the quality of water that might come from the tap but might need some form of treatment to achieve these specifications.
NOTE 2: If this is the final rinse prior to sterilization of a critical device.
NOTE 3: If hardness is greater than 150 mg/L, a water softener is recommended unless used for washing and the cleaning chemistry is capable of handling higher levels of hardness.
NOTE 4: For boiler-treated steam, most boilers are treated to maintain a pH of 7.5 or 9.2. Any treatment of water that goes into boilers should be in accordance with the sterilizer and boiler manufacturers’ written IFU.
Table 1: Categories and recommended levels of water quality for medical device reprocessing.
2. Location of Work
a. Testing services shall occur at the Sterile Processing Service department, located in the basement of Building 47 at 1100 Tunnel Road, Asheville, NC, 28803.
3. Testing
a. Testing shall be provided within the Table 2 schedule below:
| Characteristic |
| Type of testing |
| Sample site |
| Samples taken and analyzed by |
| Suggested frequency of testing |
| CGVAMC Responsible Service |
| Bacteria |
| Heterotrophic plate count (1) |
| Reprocessing area at each of the 11 point-of-use sites (3 - critical sinks, 1 - utility sink, 1 - RO storage tank, 4 - medivator sterilizers, 2 – washers). Immediately downstream of water treatment process. |
| Contractor |
| Weekly |
| FMS (contract) |
| Endotoxins |
| LAL test |
| Reprocessing area at each of the 11 point-of-use sites (3 - critical sinks, 1 - utility sink, 1 - RO storage tank, 4 - medivator sterilizers, 2 – washers). Immediately downstream of water treatment process. |
| Contractor |
| Monthly |
| FMS (contract) |
| pH |
| pH meter |
| Reprocessing area at each of the 11 point-of-use sites (3 - critical sinks, 1 - utility sink, 1 - RO storage tank, 4 - medivator sterilizers, 2 – washers). Immediately downstream of water treatment process. |
| Contractor |
Monthly
FMS (contract)
| Total hardness |
| Determination of ppm CaCO3 |
by handheld meter, titration kit, or colorimetric dipsticks.
| Reprocessing area at each of the 11 point-of-use sites (3 - critical sinks, 1 - utility sink, 1 - RO storage tank, 4 - medivator sterilizers, 2 – washers). Immediately downstream of water treatment process. |
| Contractor |
Monthly
FMS (contract)
| Conductivity |
| Conductivity Meter |
| Reprocessing area at each of the 11 point-of-use sites (3 - critical sinks, 1 - utility sink, 1 - RO storage tank, 4 - medivator sterilizers, 2 – washers). Immediately downstream of water treatment process. |
| Contractor |
| Monthly |
| FMS (contract) |
| Total Alkalinity |
| Alkalinity test kit |
| Reprocessing area at each of the 11 point-of-use sites (3 - critical sinks, 1 - utility sink, 1 - RO storage tank, 4 - medivator sterilizers, 2 – washers). Immediately downstream of water treatment process. |
| Contractor |
| Monthly |
| FMS (contract) |
| Ionic contaminants |
| Specific tests for aluminum, chloride, copper, iron, manganese, Nitrate, Phosphate, Sulfate, Silicate, Zinc. |
| The main water feedline into the facility |
| Contractor |
| Annually |
| FMS (contract) |
NOTE 1: The specifications presented in this table should be tested to the parameters specified in Table 1 and in accordance to ANSI/AAMI ST108: 2023 where applicable.
NOTE 2: The recommendations for frequency of testing in this table are the recommended minimum frequency. If problems or issues arise with the water quality, it might be necessary to increase the frequency until they are resolved.
Table 2: Overview of water quality monitoring, edited to include Responsible Party.
b. The successful bidder shall provide testing services for critical water (reverse osmosis) for bacteria (weekly), endotoxin (monthly), pH (meter) (monthly), total hardness (monthly), conductivity (monthly), total alkalinity (monthly), and ionic contaminants (annually) per Table 2 above.
c. Tests shall occur at the required locations per Table 2. The ‘main water feedline into the facility’ shall be tested at the domestic water supply inlet to the critical water system.
d. Water sampling shall be performed in accordance with ANSI/AAMI ST108:2023 Annex H.
4. Testing Days
a. Testing shall occur during normal business hours (8AM – 4:30PM).
b. Testing shall occur between the 10th and 15th day of the month.
c. The successful bidder shall notify the Contracting Officer’s Representative (COR) prior to travelling to the site to ensure that testing can be completed on the requested date. The COR may request to move the testing date due to mission requirements and this shall result in no additional cost to the government to reschedule.
5. Reporting
a. Reporting shall be per typical company reporting documentation. Additionally, documentation shall be reported per Attachment A (excel sheet).
b. Reports shall be provided through email to the COR before the last business day in the testing month.
c. Reports shall provide recommendations for remediation of deficient testing parameters.
d. Chain of custody documentation shall be provided for samples shipped to testing labs outside of the company.
6. Emergency Testing
a. The successful bidder shall also provide twelve (12) additional tests for bacteria and twelve (12) additional tests for endotoxins in Table 2 parameters to be used as emergencies occur.
b. The successful bidder shall test within five (5) business days of the official request via email.
c. Additional tests may be requested through a contract modification at the testing rate provided for the original seven (7) tests.
7. Option Years
a. This service shall be provided for up to 5 years; 1 initial year plus 4 options years. Service not meeting the required performance/quality herein shall result in a negative response in the Contractor Performance and Reporting System (CPARS) and possible non-renewal of the next option year.
8. Miscellaneous
a. The C&A requirements do not apply.
b. Parking shall be provided in any open employee parking spots.
c. The successful bidder must log into the logbook and apply a Contractor sticker badge upon entering the facility.
· NOTE: Work is being completed in a hospital environment. The Contractor must take all precautions to ensure all tools and materials are under continuous observation and accountability. At no time will tools be left unattended or unsecured.
This is a federal facility as well as a medical center. As such, there is NO tobacco or vapor usage allowed inside any federal building or on grounds. Failure to follow these regulations can result in removal of the worker or Contractor from the facility and/or a US Magistrate’s ticket and fine.