QASP Audiology updated.docx

DOCX document 59 KB Posted

Attached to
Audiologist Service for the Northern Cheyenne Service Unit, Lame Deer, Montana
Solicitation number
75H70925Q00004
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for an Audiologist Services contract with the Indian Health Service (IHS) at the Northern Cheyenne Service Unit in Lame Deer, Montana. The solicitation (No. 75H70925Q00004) is a 100% small business set-aside for commercial audiologist services, with a NAICS code of 621340 and a small business size standard of $12.5 million. The QASP outlines comprehensive performance standards and surveillance methods for evaluating contractor performance, including measures for staff competency, compliance, quality of care, patient outcomes, professionalism, and documentation.

The QASP details six key performance measures with 100% compliance requirements, including staff competencies, adherence to IHS policies, quality patient care, patient safety, cultural awareness, and documentation standards. Evaluation methods include direct observation, periodic inspection, validated customer complaints, and random sampling. Performance will be rated using a five-tier system from Exceptional to Unsatisfactory, with potential consequences ranging from unfavorable performance evaluations to suspension or termination of contract privileges. The Contracting Officer's Representative (COR) is Torrey Darkenwald from the Northern Cheyenne Service Unit, and the contract will be administered by the Billings Area Office of the Indian Health Service.

View the file

Other files

File Type Posted
Amendment 0003 Questions and Answers for 75H70925Q00004.pdf PDF
Amendment 0002 75H70925Q00004.pdf PDF
Amendment 0001 75H70925Q00004.pdf PDF
75H70925Q00004.pdf PDF
PWS Audiology updated.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan The contractor will be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: TBD Organization or Agency: Billings Area Office Indian Health Service

b. Contracting Officer’s Representative (COR)/Technical Point of Contact (TPOC) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Torrey Darkenwald Clinical Services administrator Organization or Agency: Northern Cheyenne Service Unit

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract: Primary Program Manager: TBD Alternate Program Manager: TBD

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QUALITY ASSURANCE SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. 100% surveillance

b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed.

c. VALIDATED USER/CUSTOMER COMPLAINTS.

d. RANDOM SAMPLING.

e. Verification of documentation provided by Contractor.

6. QASP PERFORMANCE REPORT DATE: January 8, 2024

Measure

PWS

Reference

Performance Requirement

Standard Acceptable Quality Level

Surveillance Method

Incentive

Competency

11.4

Contractor shall provide copies of Staff’s Annual Competencies, performance evaluations, License, and BLS cards

Perform 100% required tasks (refer to Section 7.0) at 100% of the required competencies

100%

Periodic Inspection. COR will review Contractor file submitted by Contractor.

Suspension or termination of all privileges and removal from work on the contract until competency information is provided to the BAO.

Compliance

3.0, 7.0, 17.0

Contracted staff shall comply with IHS and Service Unit policies, procedures and protocols and Standards of Care

100% compliance with IHS Service Units and/or Health Centers published Policies; Procedures; Standards of Care; and Protocols.

Periodic Inspection.

Suspension or termination of all physical and/or electronic access privileges and removal from work on the contract, until training is completed.

Quality

7.0

Contracted staff shall perform duties and responsibilities described in the PWS with quality care taking into consideration the physical, spiritual and social- cultural needs of the patient.

Perform 100% of required tasks during scheduled tour of duty

Direct Observation. Periodic Inspection.

Unsatisfactory service may result in unfavorable contractor performance evaluation, which could result in not exercising option period.

Patient Outcomes

7.0

Contracted staff shall perform duties and management of patient needs without adverse affects.

No reports of breached patient safety, infection control, and other procedures that might adversely affect patient outcome.

Validated customer complaints. COR will investigate all reported complaints.

Unsatisfactory service may result in unfavorable contractor performance evaluation, which could result in not exercising option period.

Professionalism

7.0, 8.0, 20.0 Exercise knowledge of, and techniques in order to plan and provide quality services which meets the physical, spiritual, and social-cultural needs of the Native American/Alaskan Native patient. Be respectful of the local Native culture.

Performance characterized by continual cultural awareness and focus on customer service at 100% adherence to the Federal Code of Conduct.

Direct Observation. Periodic Inspection

Noncompliance may result in unfavorable contractor performance evaluation, which could result in not exercising option period.

Documentation

7.2

Documents provided are accurate and meets the needs established for requiring care to the community.

Documentation meets established IHS Facility, Joint Commission, and Centers for Medicare and Medicaid Services (CMS) standards to include, but are not limited to, timeliness, legibility, accuracy, content, date, time, signature and designated profession.

Periodic Inspection. COR will review Contract Provider file submitted by Contractor.

Suspension or termination of all privileges and removal from work on the contract, until competency information is provided to the BAO.

7. CPAR RATINGS ASSIGNED TO QASP ITEMS:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual: https://www.cpars.gov/documents/CPARS- Guidance.pdf.

EXCEPTIONAL:
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

VERY GOOD:

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY:

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.

MARGINAL:

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of thecontractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTORY:

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to the CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample on following page.

8. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

, Contracting Officer DATE

Torrey Darkenwald -S Digitally signed by Torrey Darkenwald -S Date: 2024.01.08 13:34:04 -07'00'

Torrey Darkenwald, Contracting Officer’s Representative DATE

CONTRACTOR NAME/TITLE DATE

CONTRACT REPORT

1. CONTRACT NUMBER
2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer)
4. FROM: (Name of COR)

5. DATES

a. CR PREPARED
b. RETURNED BY CONTRACTOR:
c. ACTION COMPLETE

6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR
Date:
8. SIGNATURE OF CONTRACTING OFFICER
Date:
9a. TO (Contracting Officer)
9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE

Date:

12. GOVERNMENT EVALUATION.

13. GOVERNMENT ACTIONS

14. CLOSE OUT

NAME
TITLE
SIGNATURE
DATE

CONTRACTOR NOTIFIED

COR

CONTRACTING OFFICER

END OF QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

File details come from the government source that posted it. Updated .