QandA-MF-Hallway-Design-Install.docx
DOCX document 148 KB Posted
- Solicitation number
- MMSD, 2025, Maintenance Facility Hallway Design and Installation
- Issued by
- Dane County, Madison City, Wisconsin
About this file
The document is a Questions and Answers (Q&A) file for a Request for Proposal (RFP) issued by the Madison Metropolitan Sewerage District for a Maintenance Facility Hallway Design and Installation project. The RFP seeks a qualified designer to transform a high-traffic facility hallway into an engaging, branded, and educational space, with proposals due by 12:00 p.m. CT on Tuesday, August 5, 2025. A mandatory site visit is scheduled for Tuesday, July 22, 2025, at 1:00 p.m., and the selected consultant will develop and implement the design from October 2025 through May 2026, with installation expected in early 2026. The project will be evaluated across four primary criteria: qualifications (40 points), approach (40 points), pricing (15 points), and schedule (5 points).
The project has a fixed budget of $24,999, which comprehensively covers all project-related expenses including design, travel, engineering, materials, fabrication, installation, and consultant compensation. The project will be executed at the Nine Springs Wastewater Treatment Plant campus, a platinum-level LEED facility, and the winning proposal must align with the organization's commitment to sustainability, accessibility, and public service. Proposals can be submitted either at the District Operations building located at 1610 Moorland Road, Madison, Wisconsin 53713, or via email to rfp@madsewer.org. The district reserves the right to reject any or all proposals and to waive any technical irregularities in the submission process. There are no explicit set-aside designations or restrictions for disadvantaged enterprises mentioned in the RFP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP - Maintenance Facility Hallway Design and Installation - 2025.pdf | ||
| Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal: Madison Metropolitan Sewerage District.
Maintenance Facility Hallway Design and Installation Advertised starting Tuesday, July 15, 2025 for a minimum of two consecutive weeks.
Questions and Answers.
| Question |
| District Response |
Can we get the drawings for the hallway to the left and right as you enter?
Attached are the drawings you requested for the Maintenance Facility Hallway Design RFP.
Attachment B – Maintenance Facility Front Hall Specs
What are the paint colors used on the walls and door frames?
· Interior drywall color is SW7022 Alpaca-Latex Eg-Shell
· Metal door and trim color is SW7076 Cyberspace
Do you have a brand standards document?
Attached is the District brand standards document.
District Brand Standards image1.png image2.png
File details come from the government source that posted it. Updated .