Addendum 1.pdf

PDF 377 KB Posted

Attached to
Maintenance Facility Hallway Design and Installation
Solicitation number
MMSD, 2025, Maintenance Facility Hallway Design and Installation
Issued by
Dane County, Madison City, Wisconsin

About this file

This is Addendum No. 1 for the Maintenance Facility Hallway Design and Installation project issued by the Madison Metropolitan Sewerage District in Madison, Wisconsin. The addendum, dated July 15, 2025, modifies the original Request for Proposal (RFP) by adding Attachment A – Maintenance Facility Hallway Specs. Proposals are due by 12:00 p.m./Noon CT on Tuesday, August 5, 2025, and will be submitted to the District Operations building at 1610 Moorland Road or via email. The project involves designing and installing an interactive hallway that showcases the district's mission, vision, and values while recognizing employee achievements.

The project has a fixed budget of $24,999, which covers all expenses including design, engineering, materials, fabrication, and installation. Proposals will be evaluated across four criteria: qualifications (40 points), approach (40 points), pricing (15 points), and schedule (5 points). The selected consultant will develop and implement the design from October 2025 through May 2026, with installation expected in early 2026. The project will be executed at the Nine Springs Wastewater Treatment Plant campus, a platinum-level LEED facility, and the winning proposal must align with the organization's commitment to sustainability, accessibility, and public service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

Maintenance Facility Hallway Design and Installation

Madison Metropolitan Sewerage District

1610 Moorland Road

Madison, WI 53713

July 15, 2025

All Potential Proposers:

The attached addition to the above contract documents are hereby made as fully and completely as if the same were fully set forth therein.

All proposers shall acknowledge receipt and acceptance of the Addendum by signing in the space provided below and submitting the signed Addendum with the proposal. Proposals submitted without this Addendum may be considered nonresponsive.

MADISON METROPOLITAN SEWERAGE DISTRICT

Any questions may be directed to:

Amy Steger

Communication and Marketing Specialist rfp@madsewer.org

RECEIPT ACKNOWLEDGED AND CONDITIONS AGREED TO THIS DAY OF

, 2025

BY PROPOSER

ADDENDUM NO. 1

To the Proposal Documents

Maintenance Facility Hallway Design and Installation

For the

Madison Metropolitan Sewerage District

Date: July 15, 2025

Proposals Due: 12:00 p.m./Noon CT, Tuesday, August 5, 2025

TO: ALL PROPOSERS ON THE Maintenance Facility Hallway Design and Installation project:

This Addendum consists of two pages.

The following is an addition to the REQUEST FOR PROPOSAL:

Add: Attachment A – Maintenance Facility Hallway Specs

26’- 11 ½” +/-

10’- 2” +/-

0’-7 ½” +/-

Addendum.pdf
Attachment A - Maintenance Facility Hallway Specs

File details come from the government source that posted it. Updated .