Addendum 1.pdf
PDF 377 KB Posted
- Solicitation number
- MMSD, 2025, Maintenance Facility Hallway Design and Installation
- Issued by
- Dane County, Madison City, Wisconsin
About this file
This is Addendum No. 1 for the Maintenance Facility Hallway Design and Installation project issued by the Madison Metropolitan Sewerage District in Madison, Wisconsin. The addendum, dated July 15, 2025, modifies the original Request for Proposal (RFP) by adding Attachment A – Maintenance Facility Hallway Specs. Proposals are due by 12:00 p.m./Noon CT on Tuesday, August 5, 2025, and will be submitted to the District Operations building at 1610 Moorland Road or via email. The project involves designing and installing an interactive hallway that showcases the district's mission, vision, and values while recognizing employee achievements.
The project has a fixed budget of $24,999, which covers all expenses including design, engineering, materials, fabrication, and installation. Proposals will be evaluated across four criteria: qualifications (40 points), approach (40 points), pricing (15 points), and schedule (5 points). The selected consultant will develop and implement the design from October 2025 through May 2026, with installation expected in early 2026. The project will be executed at the Nine Springs Wastewater Treatment Plant campus, a platinum-level LEED facility, and the winning proposal must align with the organization's commitment to sustainability, accessibility, and public service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP - Maintenance Facility Hallway Design and Installation - 2025.pdf | ||
| QandA-MF-Hallway-Design-Install.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
Maintenance Facility Hallway Design and Installation
Madison Metropolitan Sewerage District
1610 Moorland Road
Madison, WI 53713
July 15, 2025
All Potential Proposers:
The attached addition to the above contract documents are hereby made as fully and completely as if the same were fully set forth therein.
All proposers shall acknowledge receipt and acceptance of the Addendum by signing in the space provided below and submitting the signed Addendum with the proposal. Proposals submitted without this Addendum may be considered nonresponsive.
MADISON METROPOLITAN SEWERAGE DISTRICT
Any questions may be directed to:
Amy Steger
Communication and Marketing Specialist rfp@madsewer.org
RECEIPT ACKNOWLEDGED AND CONDITIONS AGREED TO THIS DAY OF
, 2025
BY PROPOSER
ADDENDUM NO. 1
To the Proposal Documents
Maintenance Facility Hallway Design and Installation
For the
Madison Metropolitan Sewerage District
Date: July 15, 2025
Proposals Due: 12:00 p.m./Noon CT, Tuesday, August 5, 2025
TO: ALL PROPOSERS ON THE Maintenance Facility Hallway Design and Installation project:
This Addendum consists of two pages.
The following is an addition to the REQUEST FOR PROPOSAL:
Add: Attachment A – Maintenance Facility Hallway Specs
26’- 11 ½” +/-
10’- 2” +/-
0’-7 ½” +/-
| Addendum.pdf |
| Attachment A - Maintenance Facility Hallway Specs |
File details come from the government source that posted it. Updated .