This is a Questions and Answers document related to a seasonal housing and campsites contract opportunity for Yampa State Park in Colorado, administered by the Colorado Parks and Wildlife agency. The document addresses inquiries submitted by potential bidders regarding the scope of work, operational requirements, and project specifications for managing seasonal housing units and campsite facilities at the park. Key topics covered in the Q&A include clarifications on facility maintenance standards, occupancy regulations, utility management, seasonal operational periods, staffing requirements, and the scope of responsibilities for the selected contractor. The document provides detailed responses to bidder questions to ensure consistent understanding of project expectations and contract requirements prior to proposal submission.

The Q&A document serves as an addendum to the original bid package, offering authoritative guidance on contract interpretation and project implementation details. By addressing specific bidder inquiries, the document reduces ambiguity regarding operational procedures, facility standards, and performance expectations. The responses indicate the complexity of managing multiple seasonal housing units and campsites, including considerations for seasonal staffing, facility upkeep during varying occupancy periods, and coordination with park operations. This clarification process is essential for establishing accurate cost estimates and realistic project timelines, enabling bidders to submit competitive and compliant proposals based on a unified understanding of the contract requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Northwest Region Office 711 Independent Ave Grand Junction, CO 81505 cpw.state.co.us

Project Questions and Answers – 8/10/2026 Yampa River SP – Seasonal Housing and Campsites

IFB1 – 2027*004 Page 1 of 4 C25YA1

QUESTIONS AND ANSWERS ARE HEREBY INCORPORATED WITH THE BID DOCUMENTS

1. Question: Could you confirm whether an overseas manufacturer may be proposed as the named modular-unit supplier or an approved equal through a qualified Colorado prime contractor?

Answer: This project is not subject to Build America, Buy America, so a manufacturer will not be disqualified for being located outside of the United States.

2. Question: For the seasonal housing units, is the specification written around a named product, or may a bidder propose an alternate manufacturer as an approved equal? If an approved-equal path is available, could you confirm what documentation is required, and whether the alternate must be identified in the bid or may be submitted with shop drawings after award?

Answer: Manufactured residences that meet or exceed the design criteria will be considered in accordance with Section 01100.

3. Question: Section 13122.6 requires the housing unit to be certified to HUD requirements.

Would a factory-built modular unit certified under the Colorado Division of Housing Factory-Built Structures program, carrying a Division of Housing insignia and built to the adopted IBC/IRC, be considered an acceptable equivalent under Section 01100 - Alternate Products? Or is HUD certification a fixed requirement for this item regardless of an alternate product submittal?

Answer: Manufactured housing units are to be designed, manufactured, and certified under the Colorado Division of Housing (CDOH) Factory-Built Structures Program, constructed to the state-adopted IRC/IBC, and displaying an affixed CDOH Residential Insignia. See Addendum No. 1.

4. Question: Can the house be stick built?

Answer: Manufactured housing units are to be designed, manufactured, and certified under the Colorado Division of Housing (CDOH) Factory-Built Structures Program, constructed to the state-adopted IRC/IBC, and displaying an affixed CDOH Residential Insignia. See Addendum No. 1.

5. Question: What Permits are needed?

Answer: State Electrical and Plumbing.

IFB1 – 2027*004 Page 2 of 4 C25YA1

6. Question: What size is the water line we are tying into, the drawings show 3” and 2.5”?

Answer: The size of the existing water line is thought to be 2.5” however this should be field verified.

7. Question: Who is the manufacturer of the floorplan in the drawings?

Answer: Champion Homes.

8. Question: Can you clarify the onsite grading and imported materials scope and quantities?

The quantities in the bid schedule (in tons) do not seem to align with the tables shown on the grading plan Sheet 4 (in CY). Please clarify the conversion factors used and how the quantities accumulate to get the 1,120cy net fill.

Answer: The final proposed surface requires approximately 1,120 cubic yards of fill when comparing the final proposed surface to the existing surface. This final fill requirement includes all required Class 6, Pit Run #1, non-structural fill, etc.

that will be required to be imported. The total 1,120 cubic yards of fill includes the optional spur campground sites. See the “Gravel Surface Fill Quantities” and “Earthwork Cut/Fill Summary” table including the notes as shown on Sheet 4 for additional detail.

A conversion of 1.5 tons per cubic yard was used to convert from cubic yards to tonnage for the Class 6 and miscellaneous fill. A conversion of 1.6 tons per cubic yard was used to convert conversion from cubic yards to tonnage for Pit Run #1.

9. Question: The 465 tons of imported fill (bid item #4) matches the total of the pit run (bid item #5) and Class 6 (bid item #6) quantities - is that just coincidence or is there overlap or other reason for that?

Answer: It is a coincidence that the 465 tons of imported fill (bid item #4) matches the total of the pit run (bid item #5) and Class 6 (bid item #6) quantities.

10. Question: Can you confirm that the grading/fill materials related to the optional spur campsites are included in the optional bid schedule items (#20-22).

Answer: Yes, the grading/fill materials related to the optional spur campsites are included in the optional bid schedule items (#20-22).

IFB1 – 2027*004 Page 3 of 4 C25YA1

11. Question: Kindly clarify the appliances required for the modular. Page 7 of 19 “Measurements and Payment” Bid item 8 states the appliances are to be included. Plans page 6 of 13 “Note 2” states “2. APPLIANCES INCLUDING

REFRIGERATOR, RANGE/ COOKTOP, HOOD VENT AND MICROWAVE WILL BE

FURNISHED AND INSTALLED BY THE OWNER.”

Answer: Appliances will be furnished and installed by CPW, see Addendum No. 1.

12. Question: Are there any build elevation plans/photos of other similar buildings the department can provide to better understand the desired roof lines?

Answer: See the photos below taken 11/13/2023.

Looking East with Existing Vehicle Shed on the Left

IFB1 – 2027*004 Page 4 of 4 C25YA1

Existing Maintenance Building Southeast Corner