Q&A-GC-3-2026 Baker Camp Trees Removal.pdf

PDF 290 KB Posted

Attached to
RFQ GC-3-2026 HAZARDOUS TREES REMOVAL AT HARRIMAN STATE PARK, BAKER CAMP
Solicitation number
2137012
Issued by
Rockland County, New York

About this file

This is an Addendum #1 to a Request for Quotation (RFQ) issued by the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) Palisades Region for hazardous tree removal at Harriman State Park's Baker Camp. The project involves the removal and disposal of 37 hazardous trees ranging from 5 to 30 inches in diameter, with some trees located in close proximity to buildings. Trees may be chipped and spread at an on-site location designated by park staff, while other materials must be disposed of off-site. The RFQ GC-3-2026 document includes a tree location plan, descriptions, and photographs for reference. Site visits prior to bidding are highly recommended. Work access is restricted to Monday through Friday with no holiday work permitted. Contractors may leave equipment on-site for consecutive workdays, though the park assumes no responsibility for equipment security.

Key operational details clarified in the addendum include that all wood chips must be trucked and dumped at a park-designated location, and all logs must be removed from the property. Power lines affecting work areas will be de-energized with coordination prior to work commencement. The park will provide contractors with information regarding septic tank and seepage pit locations and other underground utilities prior to work initiation. Debris already present on the property is excluded from this contract and addressed under a separate cleanup RFQ; however, contractors are responsible for debris resulting from tree felling activities. Only the 37 marked trees specified in the bid documents should be included in proposals; additional hazardous or dead trees not identified in the original documentation are excluded. Prior contracts for identical or substantially similar work were awarded to Cedar Pond Enterprises and Decker's Tree Service. Prevailing wage requirements apply and are referenced in the RFQ package documentation.

View the file

Other files

File Type Posted
RFQ GC-3-2026 Hazardous Tree Removal Baker Camp-U.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KATHY HOCHUL

Governor

KATHY MOSER

Commissioner

JOSHUA LAIRD

Executive Regional Director

PALISADES REGION | PO BOX 427, BEAR MOUNTAIN, N.Y. 10911 | PARKS.NY.GOV | (845) 786-2701

Harriman State Park Addendum #1 Baker Camp Trees Removal 7/23/2026 Project ID #: RFQ GC-3-2026

General Information:

IMPORTANT: This Addendum is part of the Contract Documents. The Vendor Certification submitted with the bid paperwork acknowledges and certifies receipt of all RFQ forms and related documents, including any addenda.

Below are the questions and responses received for the project:

Questions: Answers:

#1 Can some things be “Fly Chipped” into the woods if there is a clear space? NO

#2 Is there any place for leaving chips or wood in the park or on site? Or does everything have to be removed?

We have a location for woods chips. Logs need to be removed.

#3 There are a few branches in contact with power lines and wondering if needed would any lines be able to be turned off temporarily?

Yes, with coordination power can be turned off.

#4

In the BID for the prevailing wage, it says there is a wage determination, but none of the hyperlinks go to any page. Is it possible to send out the actual determination?

PRC # on the RFQ Package.

#5 Who is responsible for removing debris (fallen limbs, fallen trees, old stumps, etc.) within the work areas?

Debris already down is part of the other RFQ for site Cleanup. Anything related to the felling of trees for this contract is the contractor’s responsibility.

#6 Please clarify where the wood chips are to be spread.

Should they remain within the amp area, or are there designated locations elsewhere on the property?

Chips are to be trucked and dumped on site, we will show the contractor the location.

#7 Can you identify the locations of all septic tanks and seepage pits on the property? Are there any underground systems we should be aware of?

We can provide this info to the contractor prior to beginning.

#8 Are there any other underground tanks or utilities that are not visible and need to be marked prior to the start of the work?

Same as #3.

KATHY HOCHUL

Governor

KATHY MOSER

Commissioner

JOSHUA LAIRD

Executive Regional Director

PALISADES REGION | PO BOX 427, BEAR MOUNTAIN, N.Y. 10911 | PARKS.NY.GOV | (845) 786-2701

#9 Are the primary power lines currently energized? If so, will they be disconnected before work begins? Yes & Yes.

#10

There are several dead and/or hazardous trees on the property that are not included in the 37 marked trees identified in the bid documents. Should these trees be included in our proposal?

No

#11 Please confirm that no new power lines will be installed prior to the start of our work, as additional lines will affect our access to working areas.

Correct

#12 Are there any restrictions as to what days we can access the job site? Monday to Friday no Holidays.

#13 Can we leave our equipment on-site to work for consecutive days? Yes, but we are not responsible for it.

Marjorie Gerbier Program Aide/ Purchasing