This document is a Questions and Answers (Q&A) document for Project 24-2537, a Water Service Line Verifications project for the Eastside Water System, issued by Muskegon County in Michigan. The Q&A addresses four key operational questions from potential contractors regarding the project, which involves verifying underground water service line materials at 350 selected sites, including excavation, material documentation, and site restoration.

The Q&A clarifies critical project logistics, specifically that the contractor will be responsible for: offsite transportation and disposal of excavated materials, finding suitable locations for equipment staging and material stockpiling, and providing appropriate backflow prevention when accessing water hydrants. While the County will not charge water usage fees, they will assist the contractor by identifying water hydrant connection locations and providing a 2.5-inch NST connection adapter for water filling. These details provide important operational guidance for potential bidders on their responsibilities and the support they can expect from Muskegon County during the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 1

Project 24-2537 - Water Service Line Verifications - Eastside Water System

Buying Organization Muskegon County

No Question/Answer Question Date

Q1 Question: Excavated Materials

Will the City provide an area for disposal of the hydro-excavated material or will the Contractor be responsible for the offsite transportation and disposal?

Answer: The Contractor will be responsible for offsite transportation and disposal.

03/14/2024

Q2 Question: Equipment and Material Staging

Will County provide an area for the staging of equipment, stockpiling of backfill materials and related for the project operations?

Answer: The Contractor will be responsible finding a location suitable for the staging of equipment, stockpiling of backfill materials, and related project operations.

03/14/2024

Q3 Question: Water Usage

Will the contractor be responsible for water usage fees?

Answer: The County will not charge water usage fees.

03/14/2024

Q4 Question: Water Access

Will the Contractor be provided a water fill location?

Answer: Muskegon County will work with the Contractor to identify suitable locations to connect to water system hydrants. The County will provide an adapter from the hydrant to a 2.5-inch NST connection for filling. The Contractor must provide for appropriate backflow prevention in the form of a tested & approved backflow preventer or an air gap.