This document contains questions and answers related to the Ridgway State Park Lift Station Replacement project, IFB1: 2024*0147, CPW PROJECT # C21RG1/C22RG1, located in Ouray County, Colorado. The project involves replacing the existing lift station and associated infrastructure. The bid opening is scheduled for March 20, 2024 at 1:30 p.m., and the tentative substantial completion date is May 31, 2025. An optional pre-bid meeting was held on March 6, 2024, and site visits can be arranged by contacting the project manager or park manager. The questions cover topics such as the bid due date, submittal requirements, and provisions for material cost increases between bid and notice to proceed.
Regarding pricing terms, the document indicates that there are no provisions for cost increases between award and notice to proceed, but the contract does allow for payment for materials on hand. The document also provides details on the remote communication and alarm system requirements, which are part of the lift station package and will be handled by the manufacturer's start-up services.
Text of this file
Jeff Davis, Director, Colorado Parks and Wildlife
Parks and Wildlife Commission: Dallas May, Chair Richard Reading, Vice-Chair Karen Bailey, Secretary Jessica Beaulieu
Marie Haskett Jack Murphy Gabriel Otero Duke Phillips, IV Gary T. Skiba James Jay Tutchton Eden Vardy
Capital Development Program 6060 Broadway Denver, CO 80216 P 303.291.7391 | F 303.291.7108
Questions and Answers
Ridgway SP – Lift Station Replacement
IFB1: 2024*0147
CPW PROJECT # C21RG1/C22RG1
Bid Opening: March 20, 2024 at 1:30 p.m.
Date: March 13, 2024
GENERAL INFORMATION:
These questions and answers have been provided to offer clarity to the bidding documents.
The project should be bid as the original drawings and specifications have been advertised.
This document is not considered an addendum and does not need to be acknowledged as such. However, these questions and answers shall be part of the final agreement.
An optional Pre-Bid Meeting was held at the Ridgway State Park Visitor Center on March 06, 2024. The Pre-Bid Meeting Agenda and Sign-In Sheet have been posted to the State VSS web site.
Anyone not in attendance may schedule a site visit by contacting the Project Manager or Park Manager in advance of visiting the site:
Project Manager: Patrick McKeever – 970-250-5600, patrick.mckeever@state.co.us Park Manager: John Freeborn – 970-626-5822 x17, john.freeborn@state.co.us mailto:patrick.mckeever@state.co.us mailto:john.freeborn@state.co.us
QUESTIONS:
The following are answers to questions asked about the project:
1. Ridgway Valley would like to verify the Substantial Completion date for Project C21RG1/C22RG1 IFB1: 2024*0147, Ridgway State Park Lift Station Replacement is 05/31/25, not 05/31/24.
The tentative Substantial Completion date for this project is 05/31/2025 not 05/31/2024.
2. There is one bid due date showing 3/20 on the solicitation and another showing 3/27 in the Appendix. Can you confirm the due date.
The correct Bid Opening Date is: Wednesday, March 20, 2024 at 1:30 pm.
3. Is there any way to change the submittal to email? We are essentially cutting off two days from the bid time to ensure that they get to Denver in time.
No, only sealed, hard copy bids will be accepted at CPW headquarters in Denver.
4. As there is quite a bit of time between award and NTP … will there be any provision for material cost increases between bid and notice to proceed?
There are no provisions for cost increases between Award and Notice to Proceed, however CPW does allow for payment for materials on hand as stated in the General Conditions:
“PAYMENT FOR MATERIAL ON HAND
(a) Partial payments may be made to the extent of the delivered cost of materials to be incorporated in the work as evidenced by certified invoices, when produced on the project, delivered on the project or stored in acceptable storage places in the State of Colorado in which case the Contractor must furnish evidence to the Project Manager that such materials are stored subject to or under the control of the Division. Payment for such materials will not relieve the Contractor of responsibility for loss or damage of the stored materials.”
5. Is there any additional information on the remote communication and alarm system? There is nothing called out on the drawings and at the pre bid there was talk about just roughing in the infrastructure and CPW would complete this portion. Please confirm.
The remote communication and alarm system is called out in the specifications SECTION
15150 - PACKAGED LIFT STATIONS, paragraph X. AUTOMATIC WIRELESS ALARM
MONITORING and is part of the lift station package and is the responsibility of the manufacturer’s start-up services as stated in paragraph 8., III., B. Manufacturer’s Start-up Services:
“Coordinate station start-up with manufacturer’s technical representative. The representative or factory service technician will inspect the completed installation. He will calibrate and adjust instrumentation, correct or supervise correction of defects or malfunctions, and instruct operating personnel in proper operation and maintenance procedures.”
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX.pdf | ||
| SBP-6.14 BidBond.docx | DOCX document | |
| Ridgway Lift Station Drawings.pdf | ||
| Questions_ | — | |
| Pre-Bid Attendance List_ Lift Station Replacement.pdf | ||
| Ridgway LS.pdf | ||
| ADDENDUM 1.pdf | ||
| Pre-Bid Meeting Agenda_Lift Station.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .