Lauber 1-6 Environmental Services Project
Solicitation number
RFP 761 190000001914 3
Issued by
Oceana County, Michigan

About this file

This is a Questions and Answers document for Request for Proposal #190000001914 issued by Lauber BDW Site in coordination with the Michigan Department of Environment, Great Lakes, and Energy (EGLE). The project involves brownfield remediation services including excavation, groundwater sampling, soil analysis, and residential well sampling. Work is to commence upon contractor receipt of a purchase order, with completion required by June 30, 2019. The contractor is responsible for sampling monitor wells using low flow technique, with EGLE OSC personnel handling sample transportation to the laboratory. Excavation will continue until all contamination is removed, conditions become unsafe, or the EGLE OSC determines cessation. The contractor should assume collection of eight vertical profile groundwater samples total from two 75-foot borings. Disposal of excavated materials is permitted at seven specified landfills: Ottawa County Farms Landfill, Autumn Hills Recycling & Disposal Facility, Osceola County Waste Systems Inc., Central Sanitary Landfill, Woodland Meadows Recycling & Disposal Facility Inc., Pitsch Sanitary Landfill, South Kent County Landfill, and Muskegon County Solid Waste Facility.

Prevailing wages are not required as the project is not funded with federal dollars. Soil auger cuttings will be drummed only if the EGLE OSC deems necessary based on PID readings. Residential wells are to be sampled at the tap without connection to water softeners. The contractor will not be responsible for sampling the five existing monitoring wells. Groundwater is expected to flow in a southeastern direction, and the contractor will not pursue groundwater contamination plumes beyond the initial site boundaries. Excavation may extend into surrounding dirt two tracks only as determined by the EGLE OSC.

View the file

Other files

File Type Posted
Q and A Document 5-9-2019.docx DOCX document
Q and A Document 5-6-2019.docx DOCX document
Appendix B Lauber Maps.pdf PDF
RFP 190000001914 Lauber BDW Site.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lauber BDW Site

Request for Proposal # 190000001914

Questions & Answers

Question 1: What landfills can be used for disposal?

Answer: Ottawa County Farms Landfill, Autumn Hills Recycling & Disposal Facility, Osceola County Waste Systems, Inc., Central Sanitary Landfill, Woodland Meadows Recycling & Disposal Facility, Inc., Pitsch Sanitary Landfill, South Kent County Landfill, and Muskegon County Solid Waste Facility

Question 2: What is the project start/end date?

Answer: Start date can be when the awarded Contractor has received a purchase order. Work completion date is June 30, 2019.

Question 3: What direction does groundwater flow?

Answer: Groundwater is most likely flowing to the southeast.

Question 4: Who will be sampling monitor wells and how should that be done?

Answer: The Contractor will sample the monitor wells using the low flow technique. The EGLE OSC will transport the samples to the lab.

Question 5: If groundwater contamination is encountered, will we “chase the plume”?

Answer: No.

Question 6: How deep with the excavation extend?

Answer: The excavation will extend down until all contamination has been removed or until it is not safe to dig anymore, or until the EGLE OSC determines to stop.

Question 7: Will excavation extend into the dirt two track around the site?

Answer: If need be, as determined by the EGEL OSC.

Question 8: Will prevailing wages be paid by the Contractor?

Answer: No. Prevailing wages would only be paid if this project was being funded in whole, or in part, with federal funds.

Question 9: Will soil auger cuttings be drummed by the Contractor?

Answer: Only if the EGLE OSC deems necessary, based on PID readings.

Question 10: How will residential wells be sampled?

Answer: At the tap (not hooked up to a water softener).

Question 11: Will the 5 monitoring wells be sampled? Assuming the answer is yes, should both the vertical profile samples (from the two 75-foot borings) and the monitoring wells be low flowed?

Answer: Sampling of the 5 monitoring wells will not be the responsibility of the Contractor.

Question 12: Can we assume a number of vertical profile groundwater samples for the two 75-foot borings, like 4 each for a total of 8?

Answer: Yes, a total of 8.