About this file
This document is a Questions & Answers document for the Cliftondale Demolition and Site Preparation Project issued by the City of South Fulton, Georgia. The project involves the demolition of an existing structure and site preparation, including the removal of interior trees and trees in front of the building, and the installation of a permanent chain-link fence. The existing parking lot and driveway are to remain. No construction plans or specifications are available, and existing building plans are not available. The septic tank is to be abandoned in place, and no aerial pictures of the existing structure are available. An environmental report containing information on mold and asbestos is attached.
The document does not provide any information on pricing terms, set-asides, incumbents, funding requirements and sources, or contract term and renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cliftondale Multi Purpose Facility Survey Rep.pdf | ||
| NOIA 23_81_pdf.docx | DOCX document | |
| Cliftondale Community Center ARC_6809_0001_CI.pdf | ||
| ITB 23_81 Addendum_2.pdf | ||
| Bid Tab ITB 23_81.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers - 1
Project 23-81 - Cliftondale Demolition and Site Preparation Project
Buying Organization City of South Fulton, GA
No Question/Answer Question Date
Q1 Question: Construction Documents
Please provide copy of Construction Plans and Specifications
Answer: There are no construction plans or specifications.
08/31/2023
Q2 Question: Engineering Site Plan
Will the city of Fulton provide Site Engineering Plans?
Answer: Please see the attached existing site plan.
08/31/2023
Q3 Question: Construction Fence
Please clarify if you require a Temporary Chainlink fence to be removed after the contract is completed or you would like to install a permanent chainlink fence to keep after the contract is completed
Answer: We would like to install a permanent chain link fence to keep after the contract is completed.
08/31/2023
Q4 Question: Existing Plans
Please provide, if available, existing building plans
Answer: Existing plans are not available.
08/31/2023
Q5 Question: Tree removal/Protection
Please provide direction on which Trees will be removed and which trees need to be protected
Answer: Interior trees and trees in front of the building are to be removed.
08/31/2023
Q6 Question: Septic Tank
Please confirm location and if the septic tank is part of the demolition scope of work or is it to be left in place
Answer: Septic tank to be abandoned in place.
08/31/2023
Q7 Question: Areal Pictures
Please provide areal pictures of existing structure, if available
Answer: There are not any available for sharing.
08/31/2023
Q8 Question: Parking Lot/Driveway
Please clarify if the existing parking lot and driveway are to be completely demolished along with the structure or is it to be left alone?
Answer: The existing parking lot and driveway are to remain.
08/31/2023
Q9 Question: Environmental Report
Can you please provide Mold/Asbestos Report.
Answer: Please see the attached report, 08/31/2023