Q_A Document 1 23_81.pdf

PDF 3 KB Posted

Attached to
23-81 Cliftondale Demolition and Site Preparation Project
Solicitation number
PE-66020-NONST-2023-000000001
Issued by
Fulton County, Georgia

About this file

This document is a Questions & Answers document for the Cliftondale Demolition and Site Preparation Project issued by the City of South Fulton, Georgia. The project involves the demolition of an existing structure and site preparation, including the removal of interior trees and trees in front of the building, and the installation of a permanent chain-link fence. The existing parking lot and driveway are to remain. No construction plans or specifications are available, and existing building plans are not available. The septic tank is to be abandoned in place, and no aerial pictures of the existing structure are available. An environmental report containing information on mold and asbestos is attached.

The document does not provide any information on pricing terms, set-asides, incumbents, funding requirements and sources, or contract term and renewal options.

View the file

Other files

File Type Posted
Cliftondale Multi Purpose Facility Survey Rep.pdf PDF
NOIA 23_81_pdf.docx DOCX document
Cliftondale Community Center ARC_6809_0001_CI.pdf PDF
ITB 23_81 Addendum_2.pdf PDF
Bid Tab ITB 23_81.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 1

Project 23-81 - Cliftondale Demolition and Site Preparation Project

Buying Organization City of South Fulton, GA

No Question/Answer Question Date

Q1 Question: Construction Documents

Please provide copy of Construction Plans and Specifications

Answer: There are no construction plans or specifications.

08/31/2023

Q2 Question: Engineering Site Plan

Will the city of Fulton provide Site Engineering Plans?

Answer: Please see the attached existing site plan.

08/31/2023

Q3 Question: Construction Fence

Please clarify if you require a Temporary Chainlink fence to be removed after the contract is completed or you would like to install a permanent chainlink fence to keep after the contract is completed

Answer: We would like to install a permanent chain link fence to keep after the contract is completed.

08/31/2023

Q4 Question: Existing Plans

Please provide, if available, existing building plans

Answer: Existing plans are not available.

08/31/2023

Q5 Question: Tree removal/Protection

Please provide direction on which Trees will be removed and which trees need to be protected

Answer: Interior trees and trees in front of the building are to be removed.

08/31/2023

Q6 Question: Septic Tank

Please confirm location and if the septic tank is part of the demolition scope of work or is it to be left in place

Answer: Septic tank to be abandoned in place.

08/31/2023

Q7 Question: Areal Pictures

Please provide areal pictures of existing structure, if available

Answer: There are not any available for sharing.

08/31/2023

Q8 Question: Parking Lot/Driveway

Please clarify if the existing parking lot and driveway are to be completely demolished along with the structure or is it to be left alone?

Answer: The existing parking lot and driveway are to remain.

08/31/2023

Q9 Question: Environmental Report

Can you please provide Mold/Asbestos Report.

Answer: Please see the attached report, 08/31/2023

Questions & Answers - 1

File details come from the government source that posted it. Updated .