PWSD_RP to CCPS_Specifications_IFB_2025-07-09.pdf
PDF 35 MB Posted
- Solicitation number
- 2025 - 008
- Issued by
- Douglas County, Colorado
About this file
This is a comprehensive Project Manual and Invitation for Bid (IFB) document for the Parker Water and Sanitation District's Regional Pond to Cherry Creek Pump Station Parallel Pipeline Construction Project located in Parker, Colorado. The project involves constructing a new 24-inch raw water pipeline approximately 9,330 linear feet long, including various appurtenances such as valves, blowoffs, air release valves, vaults, fiber optic conduits, and handholes. A trenchless crossing is planned at Hess Road, with connections to existing pipelines near Bar CCC Pond and Regional Pond, and a flow meter installation at Cherry Creek Pump Station. The project also includes a separate potable waterline installation at the South Water Reclamation Facility. Bids are due on August 11, 2025, at 2:00 PM, with a mandatory pre-bid conference scheduled for July 17, 2025, at the Parker Water and Sanitation District's office.
The project has specific contractor qualifications, requiring bidders to have completed at least five projects with 5,000 linear feet of 24-inch or larger pipe installation within the past ten years, and tunnel contractors must have completed four tunnel projects using similar methods in the past two years. The contract is anticipated to be completed within 485 consecutive days after mobilization, with substantial completion targeted for November 1, 2026, and final completion by December 31, 2026. Liquidated damages are set at $1,000 per day for substantial completion delays and $500 per day for final completion delays. The project will be funded by Parker Water and Sanitation District, with bidding documents available through the Bidnet platform, and the estimated project will require comprehensive coordination with multiple stakeholders, including local jurisdictions and utility owners.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWSD_SWRF Second Potable Water Service Line Drawings.pdf | ||
| PWSD_RP to CCPS_Drawings_2025-06-18 Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parker Water and Sanitation District
Regional Pond to Cherry Creek PS Pipeline
Construction Documents
Project Manual
Issue for Bid
July 2025
HDR Project No. 10368289
10368289 Parker Water and Sanitation District
Regional Pond to Cherry Creek PS Pipeline - IFB
SEALS AND SIGNATURES
00 01 07 - 1
00 01 07
SEALS AND SIGNATURES
Owner Name: Parker Water & Sanitation District
Project Name: Regional Pond to Cherry Creek Pump Station
Engineer: HDR
Engineer’s seal and signature does not apply to the documents that comprise Division 00, Bidding and
Contracting Requirements.
It is a violation of applicable laws and regulations governing professional licensing and registration for any person, unless acting under the direction of the licensed and registered design professional(s) indicated above, to alter in any way the Specifications in this project manual.
Chad Roark, PE
License No. 34772
The seal and signature to the left applies to the
Project Specifications and sections of this project manual: Divisions, 01, 07, 09, 10, 26, 27, 32, 33 and 40; and Sections 31 00 00, 31 10 00, 31 23 00, 31 23 19, 31 23 33 and 31 21 19.
Nathan Soule, PE
License No. 43365
The seal and signature to the left applies to the
Project Specifications and sections of this project manual: 31 09 13, 31 71 00, 31 73 00, 31 74 23 and
31 75 00.
END OF SEALS AND SIGNATURES
06/19/2025
TABLE OF CONTENTS
00 01 10 - 1
TABLE OF CONTENTS
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 - DIVISION DIVIDER
00 01 01 - PROJECT MANUAL COVER
00 01 07 - SEALS AND SIGNATURES
00 01 10 - TABLE OF CONTENTS
00 11 13 - ADVERTISEMENT FOR BIDS (EJCDC C-111-2018)
00 21 13 - INSTRUCTIONS TO BIDDERS (EJCDC C-200-2018)
00 41 43 - BID FORM
00 43 13 - BID BOND PENAL SUM FORM (EJCDC C-430-2018)
00 52 13 - AGREEMENT (EJCDC C-520-2018)
00 61 13.13 - PERFORMANCE BOND (EJCDC C-610-2018)
00 61 13.16 - PAYMENT BOND (EJCDC C-615-2018)
00 72 13 - GENERAL CONDITIONS (EJCDC C-700-2018)
00 73 01 - SUPPLEMENTARY CONDITIONS (EJCDC C-800-2018)
DIVISION 01 — GENERAL REQUIREMENTS
01 00 00 - DIVISION DIVIDER
01 11 00 - SUMMARY OF WORK
01 14 00 - CONSTRUCTION CONSTRAINTS
01 25 00 - SUBSTITUTION PROCEDURES
01 26 00 - CONTRACT MODIFICATION PROCEDURES
01 29 73 - SCHEDULE OF VALUES
01 29 76 - MEASUREMENT AND PAYMENT GENERAL
01 30 00 - SPECIAL CONDITIONS
01 31 13 - PROJECT COORDINATION
01 31 19 - PROJECT MEETINGS
01 31 26 - ELECTRONIC COMMUNICATION PROTOCOLS
01 32 16 - CONSTRUCTION PROGRESS SCHEDULE
01 33 00 - SUBMITTAL PROCEDURES
01 41 24 - PERMIT REQUIREMENTS
01 50 10 - PROTECTION OF EXISTING FACILITIES
01 57 05 - TEMPORARY CONTROLS
01 71 14 - MOBILIZATION AND DEMOBILIZATION
01 73 29 - CUTTING AND PATCHING
01 77 19 - CLOSEOUT REQUIREMENTS
01 78 23 - OPERATION AND MAINTENANCE DATA
01 78 36 - WARRANTIES
01 78 39 - PROJECT RECORD DOCUMENTS
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 00 00 - DIVISION DIVIDER
07 11 14 - BITUMINOUS DAMPPROOFING
DIVISION 09 — FINISHES
09 00 00 - DIVISION DIVIDER
09 96 00 - HIGH PERFORMANCE INDUSTRIAL COATINGS
DIVISION 10 — SPECIALTIES
10 00 00 - DIVISION DIVIDER
10 14 00 - IDENTIFICATION DEVICES
DIVISION 26 — ELECTRICAL
26 00 00 - DIVISION DIVIDER
26 05 00 - ELECTRICAL - BASIC REQUIREMENTS
26 05 19 - WIRE AND CABLE - 600 VOLT AND BELOW
TABLE OF CONTENTS
00 01 10 - 2
26 42 13 - CATHODIC PROTECTION SYSTEM - SACRIFICIAL ANODE
DIVISION 27 — COMMUNICATIONS
27 00 00 - DIVISION 27 DIVIDER
27 05 43 - COMMUNICATIONS - EXTERIOR UNDERGROUND
DIVISION 31 — EARTHWORK
31 00 00 - DIVISION DIVIDER
31 09 13 - GEOTECHNICAL INSTRUMENTATION AND MONITORING
31 10 00 - SITE CLEARING
31 23 00 - EARTHWORK
31 23 19 - DEWATERING
31 23 33 - TRENCHING, BACKFILLING, AND COMPACTING FOR UTILITIES
31 32 19 - GEOTEXTILES
31 71 00 - TUNNEL EXCAVATION AND INITIAL SUPPORT
31 73 00 - CONTACT GROUT
31 74 23 - CARRIER PIPE INSTALLATION AND BACKFILL
31 75 00 - CONSTRUCTION SHAFTS
DIVISION 32 — EXTERIOR IMPROVEMENTS
32 00 00 - DIVISION DIVIDER
32 91 13 - TOPSOILING AND FINISHED GRADING
32 92 00 - SEEDING, SODDING AND LANDSCAPING
DIVISION 33 — UTILITIES
33 00 00 - DIVISION DIVIDER
33 05 19 - DUCTILE-IRON UTILITY PIPE
33 05 23 - PIPELINE UNDERCROSSINGS
33 11 13 - WATER MAIN CONSTRUCTION
DIVISION 40 — PROCESS INTERCONNECTIONS
40 00 00 - DIVISION DIVIDER
40 05 51 - VALVES - BASIC REQUIREMENTS
40 71 00 - FLOW INSTRUMENTATION
APPENDIX
APPENDIX A – GEOTECHNCAL DATA REPORT
APPENDIX B – GEOTECHNICAL BASELINE REPORT
APPENDIX C – US ARMY CORPS OF ENGINEERS – NATIONWIDE PERMIT VERIFICATION
APPENDIX D – XCEL AGREEMENT FOR GAS LINE CROSSING SOUTH OF HESS ROAD
APPENDIX E – BRIGHTVIEW LANDSCAPING LICENSE AGREEMENT
APPENDIX F – ROTH PROPERTY TEMPORARY ACCESS AND CONSTRUCTION EASEMENT
AGREEMENT
APPENDIX
APPENDIX A – GEOTECHNCAL DATA REPORT
APPENDIX B – GEOTECHNICAL BASELINE REPORT
APPENDIX C – US ARMY CORPS OF ENGINEERS – NATIONWIDE PERMIT VERIFICATION
APPENDIX D – US FISH AND WILDLIFE – PREBLES JUMPING MOUSE ASSESSMENT
APPENDIX E – XCEL AGREEMENT FOR GAS LINE CROSSING SOUTH OF HESS ROAD
APPENDIX F – BRIGHTVIEW LANDSCAPING LICENSE AGREEMENT
APPENDIX G – ROTH PROPERTY TEMPORARY ACCESS AND CONSTRUCTION EASEMENT
AGREEMENT
D I V I S I O N 0 0
PROCUREMENT AND CONTRACTING
REQUIREMENTS
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 11 13 - Page 1 of 2
ADVERTISEMENT FOR BIDS
Parker Water and Sanitation District Parker, Colorado
Regional Pond to Cherry Creek Pump Station Parallel Pipeline
General Notice
Parker Water and Sanitation District (Owner) is requesting Bids for the construction of the following Project: Regional Pond to Cherry Creek Pump Station Parallel Pipeline
Bids shall be submitted to Bidnet by 2:00 PM on August 11th, and reviewed by the Owner (District).
Contractors shall be notified by email or phone as to the results of bidding.
The Project includes the following Work:
A new 24-inch raw water pipeline, valves, blowoffs, air release valves, vaults, fiber optic conduits and handholes, trenchless crossing at Hess Rd, connections to existing pipelines and all other appurtenances provided in the Contract Documents. Work also includes 16” connections to existing pipelines near Bar CCC Pond and at Regional Pond; connections and flow meter at Cherry Creek Pump Station; and a potable waterline at the South Water Reclamation Facility (separate drawing set).
Bids are requested for the following Contract: Regional Pond to Cherry Creek Pump Station Parallel Pipeline and the 8” SWRF Waterline
Contractor Minimum Qualifications
• Minimum of five (5) projects with 5,000 linear feet of 24-inch diameter or greater pipe installation within the past ten (10) years.
Tunneling Contractor Minimum Qualifications
• The Contractor directly engaged in tunnel excavation and support work will have completed at least four (4) tunnel projects during the past two (2) years using similar methods as allowed in this project.
Obtaining the Bidding Documents
Information and Bidding Documents for the Project can be obtained at the following designated website:
https://bidnet.com/
Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a Bidding Documents. The designated website will be updated periodically with Addenda, lists of registered Bidding Documents holders, reports on the Site, and other information relevant to submitting a Bid for the Project. All official notifications, Addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including Addenda, if any, obtained from sources other than the designated website.
https://bidnet.com/
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 11 13 - Page 2 of 2
Pre-bid Conference
A pre-bid conference for the Project will be held on Thursday, July 17, 2025 at 1pm, at Parker Water & Sanitation District’s Office located at 13939 Ancestry Drive, Parker CO 80134. Attendance at the pre-bid conference is mandatory.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
This Advertisement is issued by:
Owner: Parker Water & Sanitation District By: Stephanie Sansom and Drayton Sanderson Title: Project Manager and Deputy Project Manager Date: July 10, 2025
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page1 of 1
INSTRUCTIONS TO BIDDERS
FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— Contracts to Be Assigned
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 1 of 10
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use, nor does it grant or confer ownership or any property interest in the Bidding Documents and other documents distributed for the Project. Authorization to download documents, or other distribution, includes the right for Bidding Documents holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the Bidding Documents holder pays all costs associated with printing or reproduction. Paper or other types of printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a Bidding Documents holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered Bidding Documents holders will receive Addenda issued by Owner or Issuing Office.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to prospective Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in PDF (Portable Document Format) (.pdf). It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor any bidder’s or the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 2 of 10
2.04.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in paper versions of the documents, and for Bidder’s reliance upon such derived information.
C. After the Contract is awarded, the Owner will provide or direct the Engineer to provide for the use of the Contractor certain documents that were developed by Engineer as part of the Project design process, as Electronic Documents in native file formats as originally prepared by Engineer.
1. Electronic Documents that are available in native file format include:
a. Plans (CAD/PDF)
2. Release of such documents will be solely for the convenience of the Contractor and subject to additional requirements, if any, for such release as indicated in Specifications Section 01 31 26 – Electronic Communication Protocols. No such document is a Contract Document.
3. Unless the Contract Documents explicitly identify that such information will be available to the Successful Bidder (Contractor), nothing herein will create an obligation on the part of the Owner or Engineer to provide or create such information, and the Contractor is not entitled to rely on the availability of such information in the preparation of its Bid or pricing of the Work. In all cases, the Contractor shall take appropriate measures to verify that electronic/digital information provided in Electronic Documents is appropriate and adequate for Contractor’s specific purposes.
4. In no case will Contractor be entitled to additional compensation or time for completion due to any differences between the actual Contract Documents and any related document in native file format.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 No prequalification process is required for this project.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bids will not be accepted from Bidders who do not attend the conference. It is each Bidder’s responsibility to sign in at the pre-bid conference to verify its participation.
Bidders must sign in using the name of the organization that will be submitting a Bid. A list of Bidders that attended the pre-bid conference and are, on that basis alone, eligible to submit a Bid for this Project, will be issued in an Addendum.
4.02 Information presented at the pre-bid conference does not alter the Bidding Documents. Owner or Issuing Office will issue Addenda to make any changes to the Bidding Documents that result
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 3 of 10 from discussions at the pre-bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents, including in Specifications Section 01 11 00 – Summary of Work. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any prospective Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 4 of 10
5.03 Other Site-Related Documents
A. The Supplementary Conditions identify other documents relating to conditions at or adjacent to the Site known to the Owner.
B. Owner has not verified the contents of these other Site-related documents, and Bidder may not rely on the accuracy of any data or information in such documents. Bidder is responsible for any interpretation or conclusion Bidder draws from the other Site-related documents.
C. The other Site-related documents are not part of the Contract Documents.
D. Bidders are encouraged to review the other Site-related documents, but Bidders will not be held accountable for any data or information in such documents. The requirement to review and take responsibility for documentary Site information is limited to information in (1) the Contract Documents and (2) the Technical Data.
E. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. After the Prebid meeting the District will lead a site visit to provide access to the Cherry Creek Pump Station site and the South Water Reclamation Facility site, which are behind locked gates and not open to the public. During the visit the Bidder must not disturb any ongoing operations at the Site. Bidder should also visit other areas of the alignment and conduct a thorough visual examination of areas that are viewable from public right of way.
B. Bidders visiting the Site are required to: (1) arrange their own transportation to the Site; and
(2) each Bidder visiting the Site is responsible for providing and using its own personal protective equipment appropriate for the Site and conditions, and in accordance with posted requirements, if any. Comply with Paragraph 5.05 of these Instructions to Bidders.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be indicated in the Supplementary Conditions. Where the Bidding Documents indicate an Owner’s safety program, visitors to the Site during the bidding phase and at other times shall comply with Owner’s safety programs.
5.06 Other Work at the Site
A. Reference is made to Specifications Section 01 11 00 – Summary of Work, for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other potentially confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will complete and submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 5 of 10
Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Successful Bidder (as Contractor) will make similar express representations and certifications when it signs the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing via email only. Contact information and submittal procedures for such questions are as follows:
Chad Roark (Chad.Roark@hdrinc.com) with copy to Stephanie Sansom (ssansom@pwsd.org)
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all Bidding Documents holders via BidNet. Questions received less than seven days prior to the date for opening of Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Bidding Documents.
7.05 Addenda that engineer judges to have a material or significant effect on Bidders’ preparation of pricing and other requirement element of the Bid will be transmitted via Addendum for Bidders’ receipt not less than three days prior to the scheduled date for receipt of the Bids. Clarifications or modifications that Engineer deems will not have a material or substantial effect on the preparation of Bids may be transmitted for Bidders’ receipt later, for receipt prior to the deadline for receipt of Bids.
ARTICLE 8—BID SECURITY
8.01 Required Form and Amount of Bid Security
A. A Bid must be accompanied by bid security made payable to Owner in an amount of 5% percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions.
B. Such bid bond will be issued in the form included in the Bidding Documents.
8.02 Bid Security of Successful Bidder
A. The Bid security of the apparent Successful Bidder will be retained until Owner awards the Contract to such Bidder, and such Bidder has signed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Successful Bidder’s bid security will be released.
B. If the Successful Bidder fails to sign and deliver the Contract and furnish the required Contract security within the number of days, indicated in Paragraph 20.01 of these
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 6 of 10
Instructions to Bidders, after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the bid security of that Bidder will be forfeited.
C. Upon Successful Bidder’s default:
1. When the bid security is a penal sum bid bond, the entire penal sum amount of the bid bond will be forfeit and due Owner.
2. When the bid security is a damages form of bid bond, to the extent of Owner’s damages will be forfeit and due Owner.
3. If a type of bid security other than a bid bond is allowed and is furnished, the amount that will be forfeit and due Owner will be the same as for the form of bid bond included in the Bidding Documents. Owner will so notify the defaulting Bidder in writing of the annulment and the amount of the forfeiture, with documentation of the amount forfeited.
D. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 Bid Security of Bidders other than the Successful Bidder
A. The bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon bid security furnished by such Bidders will be released.
B. Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the bid opening.
C. Release of Bid Security: Owner may release any Bidder’s bid security by returning such bid security to the associated Bidder. When bid security is in the form of a bid bond, Owner may dispose of or destroy the bid bond and so advice the associated Bidder in writing that the bid bond has been released.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any), are to be achieved are set forth in the Agreement.
9.02 Provisions for liquidated and special damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials, equipment, and procedures specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items or procedures. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment or procedure, application for such
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 7 of 10 acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, and will perform the Work in accordance with procedures indicated in the Bidding Documents, as supplemented by Addenda, if any. Assumptions regarding the possibility of post-bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so in the Specifications or elsewhere in the Bidding Documents. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should not submit a Bid.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed and the Bid Form signed. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 A Bid by a corporation must be signed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.03 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.04 A Bid by a limited liability company must be signed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.05 A Bid by an individual must show the Bidder’s name and official address.
12.06 A Bid by a joint venture must be signed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.07 All names must be printed in ink below the signatures.
12.08 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.09 Postal and e-mail addresses and telephone number for communications regarding the Bid must be indicated on the Bid Form.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 8 of 10
12.10 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.11 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Lump Sum
A. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.
ARTICLE 14—SUBMITTAL OF BID
14.01 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, and the name and address of Bidder, and must be accompanied by the Bid security and other required documents. All bids must be submitted through BidNet.
14.02 Bids received after the date and time prescribed for the opening of Bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened. Owner accepts no responsibility for delays in returning Bids submitted or delivered to the incorrect location.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly signed in the same manner that a Bid must be signed and delivered to the place where Bids are to be submitted, prior to the date and time established in the Bidding Documents for the receipt of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 of this Article and submit a new Bid prior to the date and time for established in the Bidding Documents the receipt of Bids.
15.03 If, within 24 hours after Bids are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 9 of 10 material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the bid security will be returned.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened and reviewed by the Owner’s team. Contractors will be notified by email or phone as to the results of bidding and the Owner’s selection.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. Owner may reject the Bid of any Bidder that fails to demonstrate appropriate qualifications, experience, and resources for the Work, in accordance with Article 3 of these Instructions to Bidders.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 Basis for Award of Contract
A. Owner reserves the right to award the Contract to the Bidder determined by Owner to be in Owner’s best interest, regardless of whether such Bid is the lowest-priced Bid received.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or elsewhere in the Bidding Documents, or prior to the Notice of Award.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications, experience, and resources of the Bidder and may consider the qualifications, experience, and resources of
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 21 13 - Page 10 of 10
Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner, with or without Engineer’s assistance, may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Paragraph 2.01 and Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, set forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the signed Agreement to Owner (or Owner’s representative), it must be accompanied by required bonds and insurance documentation.
19.02 Article 8 (“Bid Security”) of these Instructions to Bidders addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unsigned counterparts of the Agreement, along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and required bonds and insurance documentation (as required by the Contract Documents) to Owner. Within 10 days thereafter, Owner will deliver one fully signed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Owner is exempt from Colorado state sales and use taxes on materials and equipment to be incorporated in the Work. (Exemption No. 09802099). Said taxes must not be included in the Bid.
Refer to Paragraph SC-7.10 of the Supplementary Conditions for additional information.
ARTICLE 22—CONTRACTS TO BE ASSIGNED – NOT USED
BID FORM
00 41 43 - 1
SECTION 00 41 43
BID FORM
BID ITEMS:
Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
BID SCHEDULE 1:
Item No.
Description Quantity Unit Cost/Unit Total
1.00 Water Main Installation - Open Cut
1.10 24-in DIP Install Including Fittings 9330 LF
1.20 16-in &18-in DIP Install Including Fittings
215 LF
1.30 Bar CCC Connections 1 LS -
1.40 Connection to Existing 16" AWT at Regional Pond
1 LS -
1.50 Connection to Existing 16" Pipeline from RPPS
1 LS -
1.60 Steel Pipe Connections at CCPS 1 LS -
1.70 Connections to Existing 36" Pipeline at CCPS
1 LS -
1.80 Fiber Optic Conduit 9330 LF
1.90 Fiber Optic Conduit Pull Boxes 21 EA
2.00 Valves and Structures
2.10 Air Valve Assemblies and Manhole 7 EA
2.20 Block and Bleed Manhole 1 EA
2.30 Flow Meter and Manhole 1 EA
2.40 24" BFV Assemblies and Manhole 3 EA
2.50 16" BFV Assemblies 8 EA
2.60 36" BFV Assemblies and Manhole 1 EA
2.70 Blowoff Assemblies and Manhole 4 EA
3.00 Waterline - Misc Items
3.10 Flowable fill 180 LF
3.20 Trench Plugs 11 EA
3.30 Crushed Rock for Trench Stabilization
970 LF
3.40 Construction Staking 1 LS -
3.50 Clearing and Grubbing 1 LS -
3.60 Erosion and Sediment Control 1 LS -
3.70 Dewatering 1 LS -
4.00 Surface Restoration
BID FORM
00 41 43 - 2
Item No.
Description Quantity Unit Cost/Unit Total
4.10 Restoration, Seeding, Sodding, Gates and Fencing
9900 LF
4.20 Concrete Sidewalk/Trail Replacement
6900 SF
4.30 Gravel Access Road Restoration 1300 LF
4.40 Tree Replacement Allowance 1 LS $ 28,470 $ 28,470
5.00 Trenchless Crossings
5.10 Hess Road Trenchless Crossing 1 LS -
6.00 General
6.10 Mobilization/Demobilization/ Bonds/Schedule/Permits & Insurance
1 LS -
6.20 Construction Documentation 1 LS -
7.00 South Water Reclamation Facility
– Vol III SWRF Second Potable Water Service Line
7.10 Work Associated w/ Potable Water Service Line Installation
1 LS -
Total Amount for Base Bid for All Bid Items
Total Amount for Base Bid for All Bid Items (in words)
*The total amount bid above reflects Bidder’s understanding and acceptance that the Work for this project shall be completed within the time stipulated in the Agreement (00 52 13). Liquidated Damages for failing to complete the Work for this project by the referenced Substantial and Final Completion will be enforced.
NOTE: It is the intent of the Owner to award the bid to the lowest responsive bidder who submits the lowest dollar bid. Math error discrepancies found in bid proposal offers shall be resolved based on the correct sum as determined by the City pursuant to Article 18.3 of the Instruction to Bidders.
BID FORM
00 41 43 - 3
BID SUBMITTAL
This Bid submitted by:
A Corporation/Company
Corporation Name: ____________________________________________
State of Incorporation: ________________
Type: _____________________
By:
Signature
Title: ____________________________________________ (Corporate Seal)
Attest: ________________________________________________________
END OF SECTION
EJCDC® C-430, Bid Bond (Penal Sum Form).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 43 13 - Page 1 of 2
BID BOND (PENAL SUM FORM)
Bidder Surety
Name: Name:
Address (principal place of business): Address (principal place of business):
Owner Bid
Name: Parker Water & Sanitation District Project (name and location):
Address (principal place of business): Regional Pond to Cherry Creek Pump Station Parallel Pipeline
13939 Ancestry Drive Parker, CO 80134
Bid Due Date:
Bond
Penal Sum:
Date of Bond:
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
Bidder Surety
(Full formal name of Bidder) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as joint venturers, if necessary.
EJCDC® C-430, Bid Bond (Penal Sum Form).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 43 13 - Page 2 of 2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond will be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder occurs upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation will be null and void if:
3.1. Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2. All Bids are rejected by Owner, or
3.3. Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions does not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action will be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety, and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond will be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder must be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Postal Service registered or certified mail, return receipt requested, postage pre-paid, and will be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond will be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute governs and the remainder of this Bond that is not in conflict therewith continues in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 13 - Page 1 of 7
AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
This Agreement is by and between Parker Water and Sanitation District (“Owner”) and [name of contracting entity] (“Contractor”).
Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions.
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
A new 24-inch raw water pipeline, valves, blowoffs, air release valves, vaults, fiber optic conduits and handholds, trenchless crossing, connections to existing pipelines and all other appurtenances provided in the Contract Documents. Work also includes 16” connections to existing pipelines near Bar CCC Pond and at Regional Pond; connections and flow meter at Cherry Creek Pump Station; and a potable waterline at the South Water Reclamation Facility (separate drawing set).
ARTICLE 2—THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Regional Pond to Cherry Creek Pump Station Parallel Pipeline
ARTICLE 3—ENGINEER
3.01 The Owner has retained HDR Engineering, Inc. (“Engineer”) to act as Owner’s representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract.
3.02 The part of the Project that pertains to the Work has been designed by HDR Engineering, Inc.
ARTICLE 4—CONTRACT TIMES
4.01 Time is of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Times:
A. The Work will be substantially complete on or before November 1, 2026, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before December 31, 2026, except revegetation which must occur outside the winter months.
The Work must be completed within 485 consecutive days after mobilization to the site and be completed prior to December 31, 2026.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 13 - Page 2 of 7
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial…