PWS Window Glass Cleaning Service.docx

DOCX document 93 KB Posted

Attached to
S299--Window Cleaning Follow-On Requirement VISN 4 Wide VA Medical Center Contract
Solicitation number
36C24426Q0567
Issued by

About this file

This is a Performance Work Statement (PWS) for Window, Glass, and Surface Cleaning Services required by Veterans Integrated Service Network 4 (VISN 04), comprising nine VA Medical Centers across Pennsylvania and Delaware: Altoona, Butler, Coatesville, Erie, Lebanon, Philadelphia, Pittsburgh (two campuses), Wilkes-Barre, and Wilmington. The Government anticipates awarding a 5-year fixed-price, indefinite delivery/requirements contract with task orders issued contingent upon funding availability. The contractor must provide all personnel, equipment, supplies, materials, transportation, and supervision necessary to perform comprehensive window, glass, and surface cleaning operations at specified facilities, with capability to conduct simultaneous operations at any combination of four VAMCs and complete all cleaning cycles at individual facilities within four to eight weeks depending on location.

The PWS establishes specific performance requirements organized as distinct cleaning cycles per facility, with detailed window counts and cleaning scope for interior and exterior surfaces, frames, sills, screens, and specialized elements such as skylights, glass ceilings, atrium features, and high-rise building facades ranging from one to thirteen stories. The contractor must employ IWCA-certified personnel in commercial ground, rope descent systems, or suspended scaffolds; obtain facility-specific safety approvals; submit cleaning cycle schedules and post-cleaning reports; and provide condition reports identifying damaged windows or safety concerns. The Government will conduct surveillance through direct observation with 100 percent acceptable quality level standards for cleanliness, document submission timeliness, and safety compliance. Performance evaluation uses a three-tier rating system (Exceptional, Satisfactory, Unsatisfactory), with unsatisfactory performance triggering corrective action plans. The FCOR at each facility and VCOR at the VISN level will manage daily administration and performance monitoring, while the Contracting Officer retains final authority over contract determinations.

View the file

Other files

File Type Posted
36C24426Q0567.docx DOCX document
Site Visits POCs Window Washing.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

VISN 04 Window, Glass, and Surface Cleaning Service

SECTION 1 - ACRONYMS AND DEFINITIONS

1.1 Acronyms. Following are acronyms which may be used in place of full text throughout this Performance Work Statement

AQL
Acceptable Quality Level
CAP
Corrective Action Plan
CC
Cleaning Cycle
CCE
Cleaning Cycle Evaluation
CLIN
Contract Line Item Number
CO
Contracting Officer
CPARS
Contractor Performance Assessment Reporting System
CPR
Contract Performance Report
EMS
Environmental Management Services
FAR
Federal Acquisition Regulation
FCOR
Facility Contracting Officer Representative
GFM
Government Furnished Materials
GFP
Government Furnished Property
GFS
Government Furnished Services
IDIQ
Indefinite Delivery Indefinite Quantity
IWCA
International Window Cleaning Association (www.iwca.org)
OSHA
Occupational Safety and Health Administration
POC
Point of Contact
PRS
Performance Requirements Summary
PWS
Performance Work Statement
QASP
Quality Assurance Surveillance Plan
QCP
Quality Control Plan
SDS
Safety Data Sheet
TO
Task Order
VA
Department of Veterans Affairs
VAMC
Veterans Administration Medical Center
VCOR
VISN04 Contracting Officer Representative
VHA
Veterans Health Administration
VISN
Veterans Integrated Service Network

1.2 Definitions. Following are definitions for words or phrases used throughout this PWS.

1.2.1Calendar Days. Every consecutive day on the calendar, including holidays and weekends.
1.2.2Cleaning Cycle. The cleaning cycle is the unit of service to be acquired

by the Government. The CC is further defined in Section 5 and Section 6 of this PWS. The Government will acquire cleaning cycle(s) through issued TOs

1.2.3Contractor. A supplier or vendor having a contract to provide specific supplies or service to the Government. The term used in this PWS refers to the prime Contractor
1.2.4Contracting Officer. A person with authority to award, administer, and terminate contracts and make related determinations and findings on behalf of the Government. The only individual legally authorized to bind the Government.
1.2.5FCOR. An employee of the U. S. Government appointed by the CO to assist with contract administration at the facility level and to liaison between the Contractor, CO and VCOR. A CO issued delegation memo will further define the roles of the FCOR.

1.2.6 Quality Assurance. The Government procedures to verify provided. Contractor services are performed according to acceptable standards.

1.2.7Quality Control. All measures taken by the Contractor to assure the quality of services provided meets contract requirements.
1.2.8QASP. A written document specifying the methodology to be used to surveil Contractor performance.
1.2.9Task Order. An order for services placed against the Window, Glass, Surface Cleaning Service contract.
1.2.10VCOR. An employee of the U. S. Government appointed by the CO to assist with contract administration at the VISN level and to liaison between the Contractor, CO and FCOR. A CO issued delegation memo will further define the roles of the VCOR.

SECTION 2 – GENERAL INFORMATION

2.1 General. VISN04 requires window, glass, and surface cleaning services at the VISN04 VAMC’s as indicated in this PWS

2.2 Description of Services. Contractor must provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Window, Glass, and Surface Cleaning Service as defined in this Performance Work Statement. The Contractor must perform to the standards in this contract.

2.3 Background. The VISN04 is comprised of nine Veterans Administration Medical Centers. Past award was for a 5-Year Fixed Priced (per unit) Indefinite Delivery (ID): Requirements contract. Unilateral Task Order will be issued to authorize and fund performance contingent upon availability of funding. VISN04 intends to pursue the same type of contract to provide service to all nine sites in VISN04.

2.4 Objectives.

· Window, Glass, and Surface Cleaning Services

· Availability for use by the VISN04 Medical Centers

2.5 Records. The records of inspections and any other required documentation must be kept and made available to the FCOR, VCOR, and CO, when requested, throughout the term of the contract and for the period after contract completion until final settlement of any claims under the contract.

2.6 Quality Assurance. The Government will evaluate the Contractor’s performance under this contract in accordance with the attached QASP included as Attachment 1. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The FCOR will conduct performance surveillance and when defective performance is observed will make known the defective performance to the Contractor’s Facility Manager or acting alternate. Government surveillance of tasks other than those listed in the QASP, may occur during the performance period of the contract.

2.7 Holidays. Contractor may perform services on any of the below Federal holidays if preapproved by the applicable FCOR:

New Year’s DayMartin Luther King Day
President’s DayMemorial Day

Juneteenth

Independence DayLabor Day
Columbus DayVeteran’s Day
ThanksgivingChristmas

2.8 Hours of Operation. Generally, cleaning services will occur between 0700 – 1700 Monday through Friday, excluding Federal Holidays; however, the Contractor may be required to provide services after hours (1700 – 0700) and on the weekends and must have the capability to do so. Issued TOs will identify when cleaning services are required after hours and on the weekends. The Contractor may request to perform services after hours or on weekends, such requests must be presented to the FCOR and written approval must be obtained from the FCOR prior to service performance.

2.9 Place of Performance. The Contractor must have the capability to perform cleaning services at any of the following facilities. Issued TOs will define locations.

Facility
Official Name
Address
County
Altoona
James E VanZandt

VAMC

2907 Pleasant Valley Road, Altoona, PA 16602 Blair

Butler
Butler VAMC
353 North Duffy Road,

Butler, PA 16001 Butler

Coatesville
Coatesville VAMC
1400 Blackhorse Hill Road,

Coatesville, PA 19320 Chester

Erie
Erie VAMC
135 East 38th Street,

Erie, PA 16504 Erie

Lebanon
Lebanon VAMC
1700 South Lincoln Avenue,

Lebanon, PA 17042 Lebanon

Philadelphia
Corporal Michael J

Crescenz VAMC 3900 Woodland Avenue, Philadelphia, PA 19104 Philadelphia

Pittsburgh
Pittsburgh VAMC

University Drive Campus University Drive Pittsburgh, PA 15240 Allegheny

Pittsburgh
Pittsburgh VAMC H. J. Heinz Campus
1010 Delafield Road

Pittsburgh, PA 15215 Allegheny

Wilkes Barre
Wilkes Barre VAMC
1111 East End Boulevard

Wilkes Barre, PA 18711 Luzerne

Wilmington
Wilmington VAMC
1601 Kirkwood Highway

Wilmington, DE 19805 New Castle

2.10 Insurance. The Government requires insurance as specified in incorporated Clauses.

2.11 Physical Security. The Contractor is responsible for safeguarding all Government equipment, information and property and is liable for any Contractor caused damage.

2.12 Access Control. The Contractor must adhere to the following:

2.12.1 Each facility will determine accessibility to restricted areas. Access to restricted areas must be coordinated with the FCOR and may require Government provided escort.

2.12.2 The Contractor must establish and implement methods of ensuring all keys, access badges, access passes, and lock combinations issued to the Contractor are not lost or misplaced and are not used by unauthorized persons. The Contractor will not duplicate any keys, access badges, or access passes issued by the Government.

2.12.3 The Contractor must immediately notify the FCOR or CO any occurrences of lost or duplicated keys, access badges, and/or access passes. Additional parties may require notification (e.g. facility police, safety office, etcetera) as identified by the FCOR.

2.12.4 The Contractor must prohibit the use of issued keys, access badges, access passes, and lock combinations by any person(s) other than the Contractor’s employees. Opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in contract performance is prohibited.

2.12.5 Accessed restricted areas must be secured and locked at work conclusion.

2.13 Post Award Conference/Periodic Progress Meetings. The Contractor agrees to attend any post award conference requested by the VCOR, FCOR, or Contracting Officer in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting officer, VCOR, FCOR or other Government personnel, as appropriate, may meet periodically with the Contractor to review the contractor's performance. At these meetings the Government will apprise the contractor of how the government views the contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action must be taken to resolve outstanding issues. These meetings will be at no additional cost to the Government

2.14 Identification of Contractor Employees. All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public they are Government officials. The Contractor must also ensure all documents or reports produced by Contractors are suitably marked as Contractor products or that contractor participation is appropriately disclosed.

2.14.1 Contractor employees must be clean and present a neat appearance. Hair must be neatly trimmed and combed. Contractor employees must wear Contractor provided uniforms or comply with Contractor’s dress code which must include pants, shirts or blouses, and protective clothing when applicable. The dress code must be the same color or color combinations for all Contractor employees and distinguishable from VAMC staff and facility population. All apparel, whether uniform or dress code requirements, will be worn as designed by the manufacturer. Open toe shoes or sandals are not permitted. All personnel will display a Contractor provided identification badge while on campus. The badge must include: 1) Name of employee, 2) Contractor name, and 3) Employee photograph and must be visible and attached to employee clothing at chest level.

2.14.2 Facility access requirements vary amongst the VISN04 facilities. To ensure compliance, the Contractor must obtain the facility requirements from the FCOR prior to work commencement.

2.15 Phase In/Phase Out Period. To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor must have personnel on board, during the TBD phase in/ phase out periods. During the phase in period, the Contractor must become familiar with performance requirements in order to commence full performance of services on the contract start date.

SECTION 3 – CONTRACTOR PERSONNEL

3.1 Project Manager and Facility Managers. The Contractor must provide a Project Manager and Facility Managers who are responsible for the performance of the work.

The Contractor must also provide alternates for the Project Manager and Facility Managers during absences. The names and contact information of these individuals must be designated in writing to the CO prior to contract award and subsequent changes must be presented to the CO and applicable FCOR within one business day of the change. Each participating VISN04 VAMC requires an assigned Facility Manager and alternate(s).

3.1.1The Project Manager and Facility Managers or alternate(s) must have full authority to act for the Contractor on all contract matters.
3.1.2The Facility Manager or alternate must be on-site, at the applicable facility, and reachable via cell phone during times Contractor employees are performing contract work and must be available to meet with the FCOR, when

requested, within 30 minutes. A cell phone contact number must be provided to the FCOR prior to contract work commencement.

3.1.3 The Project Manager and Facility Managers or alternate(s) must be able to read, write, speak, and understand English.

3.2 Contractor Employees. The Contractor must not employ persons for work on this contract if such employee is considered by the CO or FCOR to be a potential threat to the facility’s operational mission or the health, safety, security, general well-being of the VISN04 VAMC’s employees and facility population.

3.2.1The Contractor must comply with the applicable facility’s Infection Control Policy, Tuberculosis Surveillance Policy, and Infectious Disease Policy. Guidance and policy requirements will be provided by the FCOR and the facility’s Infection Prevention and Control Office. Costs incurred to establish and maintain Contractor compliance will be borne by the Contractor.
3.2.2The Contractor employees also employed by the U. S. Government must be identified. A list of such individuals must be presented to the FCOR prior to work commencement. The list must include: 1) name of employee, 2) address of employee, 3) contact telephone number of the employee, 4) position the employee holds with the Contractor, and 5) agency and position the employee holds with the U. S. Government. The FCOR and the CO will determine if the employee(s) is granted approval to perform work under the contract.

3.3 Safety. The Contractor must perform all work in a safe manner, ensuring the protection of facility buildings and equipment from damage and Contractor employees and facility population from injury.

3.3.1The Contractor must comply with all applicable VA, VHA, VISN04 VAMC, Federal, State, and Local Municipality directives, standards, ordinances, laws, and regulations to include but not limited to OSHA, IWCA, and IWCA Alliance directives, standards, laws, regulations, and guides.
3.3.2The Contractor must coordinate with the FCOR a site visit at each VISN04 VAMC prior to work commencement. The visit will familiarize Contractor with the facility and offer opportunity for the FCOR to provide the facility’s guidelines and policies. It will also afford opportunity to identify and mitigate any site-unique hazards or obstacles.
3.3.3The Contractor must adhere to site-specific requirements (e.g., check-in checkout procedures, site parking restrictions, etcetera) provided by the FCOR.
3.3.4Prior to work commencement, the Contractor must verify, with the FCOR, the cleaning solutions, compounds, and/or chemicals the Contractor intends to use are permitted. The Contractor must provide the FCOR any requested SDS.
3.3.5Contractor employees performing the services must be IWCA certified in any multiple of the following IWCA certifications: 1) Certified Commercial Ground, 2) Certified Rope Descent Systems, and 3) Certified Suspended

Scaffolds. Equivalent certifications bestowed by organizations other than IWCA may be substituted with CO and FCOR approval. An employee’s certification must be congruent with work performed. Contractor must provide proof of employee certification within three business days when requested by the FCOR.

3.3.6The FCOR reserves the right to stop work if unsafe practices are observed. The Contractor must make corrections prior to work resumption at no cost to the Government.
3.3.7At no time may a contractor employee use VAMC furniture, windowsills, or equipment as substitute stools or ladders.
3.3.8Any window or door open during the cleaning process must be closed and locked (if applicable) at completion.

SECTION 4 – GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICE

4.1Government Furnished Property. The Government will not provide GFP
4.2Government Furnished Materials. The Government will not provide GFM
4.3Government Furnished Services. The Government will permit us of limited utility services, i.e., electric and water. Water will be available for the filling and re-filling of buckets, spray bottles and other containers needed during the cleaning process. The Government will permit use of 120volt AC electricity for Contractor owned equipment operation. The Contractor must ensure all Contractor employees use methods to conserve utilities.
4.3.1Lights must be turned off when no longer required in work areas.
4.3.2Contractor employees must not adjust controls for heating, ventilation, air conditioning, or any other environmental systems.
4.3.3Water faucets or valves must be turned fully closed when no longer in use.

SECTION 5 – CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

5.1 The Contractor must provide all property, equipment, apparatus, materials, supplies, safety equipment, and services required to ensure all terms and conditions are met.

5.2 The Government reserves the right to have removed from the work site any Contractor equipment or apparatus not meeting standards expressed in Section 3.3 of this PWS.

SECTION 6 – TASKS AND CAPABILITY

6.1 The Contractor must be capable of meeting and accomplishing all elements of this PWS.

6.2 The Contractor must provide all labor, material, equipment, apparatus, maintenance, repair, supplies, transportation, management, expertise and supervision necessary to perform the requirements of this service contract. In executing the requirements of this PWS, the Contractor must satisfy the performance requirements included in this PWS and the requirements set forth in the attached QASP.

6.3 Contractor Capability.

6.3.1Contractor must be capable of conducting simultaneous, contract compliant, cleaning operations at any combination of four VISN04 VAMCs.
6.3.2Excluding Pittsburgh’s campuses, the Contractor must be capable of completing all of the Cleaning Cycles (refer to Section 6.7 of this PWS) at any one facility within four weeks of work commencement. Cleaning at Pittsburgh’s campuses must be accomplished within eight weeks of work commencement. Completion time deviation requests must be presented to the FCOR, VCOR and CO. The CO will make final determination.
6.3.3Contractor must be capable of starting work, as specified in issued TOs, within

eight weeks of the TO’s award date. Extension requests to this time constraint must be presented to the FCOR, VCOR and CO. The CO will make final determination.

6.4 Window, Glass, and Panel surfaces.

6.4.1 The quantity and location of window, glass, and panel surfaces are estimated in Section 6.7 of this PWS. The FCOR will provide clarification during pre-award site-visit.

6.4.2 Window, glass, and surfaces include but are not limited to:

· Windows

· Glass indoors

· Glass ventilators and /or transoms

· Blanks

· Fiberglass panels

6.4.3 All surfaces must be cleaned and free of streaks, smears, soap residue, dirt, paint specs, or other foreign debris. Following the cleaning, the cleaning solutions, compounds and chemicals used in the cleaning process must be wiped and absorbed; the window, frame, sills, screens, tracks and floor in the work area must be made dry.

6.4.4 Any items, furniture, equipment, etcetera, moved to allow for cleaning purposes must be returned to the original location and be wiped dry of any cleaning solutions, compounds and chemicals.

6.4.5 When working in building interiors, opportunity must be given to VAMC staff to clear work areas prior to cleaning. The Contractor will coordinate with the FCOR methods of notification.

6.5 Window Frames, Sills, Screens, and Window/Screen tracks.

6.5.1 The quantity and location of the window frames, sills, screens, and window/screen tracks are estimated in Section 6.7 of this PWS. The FCOR will provide clarification during pre-award site-visit.

6.5.2 All frames, sills, screens, tracks, etcetera must be cleaned and free of streaks, stains, soap residue, dirt, paint specs, dust, or other foreign debris. Following the cleaning, the cleaning solutions, compounds and chemicals used in the cleaning process must be wiped and absorbed; the window, frame, sills, screens, tracks and floor in the work area must be made dry.

6.5.3 Any screens or components removed for cleaning purposes must be reinstalled after completion. Any items, furniture, equipment, etcetera, moved to allow for cleaning purposes must be returned to the original location and be wiped dry of any cleaning solutions, compounds and chemicals.

6.5.4 When working in building interiors, opportunity must be given to VAMC staff to clear work areas prior to cleaning. The Contractor will coordinate with the FCOR methods of notification.

6.6 Additional Services.

6.6.1 Condition Report. During the cleaning process, the Contractor must evaluate the condition of the windows, panels, glass, frames, sills, screens, etcetera. The following or similar conditions must be reported to the FCOR:

· Screen tears or holes

· Cracked or broken windows, panes, panels

· Damaged or torn window seals

· Inoperable windows

· Any other conditions considered poor or in need of repair

The report must be in Word or PDF format and, at a minimum, must include the reportable condition, the location (building – room number), the date discovered and the name of the Contractor employee making the observation. The report is due at the conclusion of a CC unless the Contractor determines the condition presents a safety concern; it must then be reported immediately to the FCOR.

6.6.2 Cleaning Cycle Schedule. Prior to the start of a CC the Contractor must present to the FCOR a Cleaning Cycle Schedule. The schedule must identify locations (e.g., rooms, floors, wings, etcetera) and the anticipated date cleaning will occur in those locations. As schedule deviations occur, they must be reported to the FCOR. The FCOR will define the report format.

6.6.3 Post Cleaning Report. During a CC, Post Cleaning Reports must be presented to the FCOR. The Post Cleaning Reports will identify locations recently cleaned. The FCOR will determine the frequency the reports are required (daily, weekly, etcetera) and will define the report format.

6.7 VISN04 VAMC Requirements. Facility requirements follow Section 6.7 of this PWS. The requirements identified in each table must be worked as an independent project, be completed in entirety, and hereinafter will be referred to as a Cleaning Cycle. The window counts in Sections 6.7 PWS, are estimates and the window sizes vary. The pre-award site visits are crucial and will provide Contractor opportunity to evaluate and appraise the site requirements.

6.7.1 James E. Van Zandt Veterans Affairs Medical Center (Altoona VAMC). At this time Altoona VAMC will not be participating; However, within the life of the contract Altoona VAMC may elect to participate. Contractor must ensure they have resources and capability to include Altoona in the future. Altoona VAMC will provide CC tables. Fair and reasonable pricing will be negotiated with the CO, VCOR and FCOR.

6.7.2 Butler VAMC:

6.7.2.1

CC 1A

Location/ Building Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

2 – 1st floor
Yes
Yes
159
Varies
2 Story
No
2 – 2nd floor
Yes
Yes
157
Varies
2 Story
No
20
Yes
Yes
868
Varies
1 Story
Yes
21
Yes
Yes
129
Varies
1 Story
No
22
Yes
Yes
78
Varies
2 Story
Yes
23
Yes
Yes
106
Varies
2 Story
Yes
24
Yes
Yes
106
Varies
2 Story
Yes
25
Yes
Yes
62
Varies
1 Story
Yes

CC 1B

Location/ Building Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

2 – Entrance

Yes
Yes
Varies
2 Story
No

20 – Entrance

Yes
Yes
Varies
1 Story
Yes

CC 1C

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

2 – 20 Tunnel

Yes
Yes
10
Varies
1 Story
No
6.7.2.2Suspended scaffolds and rope descents from the roof top are not permitted at the Butler campus.
6.7.2.3FCOR will provide special safety requirements and lift equipment/apparatus constraints.
6.7.2.4The exterior windows of assigned buildings must be cleaned regardless of interior accessibility.
6.7.2.5Building 20 skylights can only be accessed from the rooftop.

6.7.3 Coatesville VAMC:

6.7.3.1
CC 2A

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

3
No
Yes
100
Varies
3 Story
Yes
3 MRI
No
Yes
Varies
3 Story
Yes
69
No
Yes
75
Varies
1 Story
Yes
69 – Pool area
No
Yes
60
Medium
3 Story
Yes
138 – E
No
Yes
100
Varies
2 Story
Yes
138
No
Yes
200
Varies
2 Story
Yes

138 – Atrium

No
Yes
Varies
1 Story
Yes
39
No
Yes
200
Varies
3 Story
Yes
57
No
Yes
200
Varies
3 Story
Yes
59
No
Yes
200
Varies
3 Story
Yes
38
No
Yes
200
Varies
3 Story
No
1
No
Yes
200
Varies
3 Story
Yes
2
No
Yes
200
Varies
3 Story
Yes
4
No
Yes
200
Varies
3 Story
Yes
6
No
Yes
200
Varies
3 Story
Yes
7
No
Yes
200
Varies
3 Story
Yes
8
No
Yes
200
Varies
3 Story
Yes
9
No
Yes
200
Varies
3 Story
Yes
72
No
Yes
200
Varies
1 Story
Yes
70
No
Yes
200
Varies
1 Story
No
58
No
Yes
200
Varies
3 Story
Yes
139
No
Yes
60
Varies
1 Story
Yes

CC 2B

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

3 –Urgent Care Entrance

Yes
Yes
25
Varies
3 Story
Yes

Building 138Hospice Entrance

Yes
Yes
10
Varies
2 Story
Yes

CC 2C

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

3
Yes
No
100
Varies
3 Story
Yes
3 MRI
Yes
No
Varies
3 Story
Yes
69
Yes
No
75
Varies
1 Story
Yes
69 – Pool area
No
No
60
Medium
3 Story
Yes
138 – E
Yes
No
100
Varies
2 Story
Yes
138
Yes
No
200
Varies
2 Story
Yes

138 – Atrium

Yes
No
Varies
1 Story
Yes
39
Yes
No
200
Varies
3 Story
Yes
57
Yes
No
200
Varies
3 Story
Yes
59
Yes
No
200
Varies
3 Story
Yes
38
Yes
No
200
Varies
3 Story
No
1
Yes
No
200
Varies
3 Story
Yes
2
Yes
No
200
Varies
3 Story
Yes
4
Yes
No
200
Varies
3 Story
Yes
6
Yes
No
200
Varies
3 Story
Yes
7
Yes
No
200
Varies
3 Story
Yes
8
Yes
No
200
Varies
3 Story
Yes
9
Yes
No
200
Varies
3 Story
Yes
72
Yes
No
100
Varies
1 Story
Yes
70
Yes
No
100
Varies
1 Story
No
58
Yes
No
200
Varies
3 Story
Yes
139
Yes
No
60
Varies
1 Story
Yes
6.7.3.2Suspended scaffolds and rope descents from the roof top are not permitted at the Coatesville campus.
6.7.3.3Outside windows are to be accessed and cleaned from the outside. The inside panes must be accessed and cleaned from the inside. The FCOR will provide any exceptions. Windows may not be removed for cleaning unless specific approval has been received from the FCOR.
6.7.3.4The exterior windows of assigned buildings must be cleaned regardless of interior accessibility.
6.7.3.5Outside window cleaning to be accomplished on all floors of assigned buildings except for the following: windows above the second floor on the front side of Building One do not require outside cleaning.

6.7.4 Erie VAMC:

6.7.4.1
CC 3A

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

1
Yes
Yes
1228
Varies
7 Story
Yes
6
Yes
Yes
20
Varies
1 Story
No
8
Yes
Yes
188
Varies
2 Story
Yes
CLC
Yes
Yes
60
Varies
1 Story
Yes
Parking Garage
Yes
Yes
20
Varies
2 Story
No

New Boiler Plt

Yes
Yes
3
Varies
2 Story
No

CC 3B

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

1 – Entrances

Yes
Yes
20
Varies
7 Story
Yes

8 – Entrance

Yes
Yes
10
Varies
2 Story
Yes

CLC –

Entrance

Yes
Yes
8
Varies
1 Story
Yes

Park Garage - Ent

Yes
Yes
18
Varies
2 Story
No
6.7.4.2Suspended scaffolds and rope descents from the roof top are permitted at the Erie Campus. The facility’s Engineering and Safety Office must be consulted prior to use.
6.7.4.3The locations identified in the CC 3A table require outside cleaning from the ground through the 7th floor regardless of interior accessibility.

6.7.5 Lebanon VAMC:

6.7.5.1
CC 4A

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

1 – Ground- 1st Fl

Yes
Yes
122
Varies
7 Story
Yes
1 – Ground Lab
Yes
Yes
75
Varies
1 Story
No

18 – Basement- 1st Fl

Yes
Yes
72
Varies
6 Story
Yes

19 – 1st Fl- 2nd Fl

Yes
Yes
108
Varies
3 Story
No

22 – 1st Fl -2nd Fl

Yes
Yes
92
Varies
3 Story
No

99 – 1st Floor

Yes
Yes
92
Varies
1 Story
No

2 – 1st Fl- 2nd Fl

Yes
Yes
48
Large
3 Story
No

23 – 1st Floor

Yes
Yes
66
Varies
3 Story
No

24 – 1st Floor

Yes
Yes
16
Varies
1 Story
No

106 – 1st Floor

Yes
Yes
8
Varies
1 Story
No

4-1st Fl and 2nd Fl

Yes
Yes
60
Varies
2 Story
No

5-1st Fl and 2nd Fl

Yes
Yes
40
Varies
2 Story
No
17 – Canteen
Yes
Yes
100
Varies
1 Story
Yes

17 – 1st Fl- 2nd Fl

Yes
Yes
336
Varies
5 Story
Yes
17 South – 1st Fl
Yes
Yes
60
Varies
1 Story
Yes

101 – 1st Floor

Yes
Yes
14
Varies
1 Story
Yes

102 – 1st Floor

Yes
Yes
8
Varies
1 Story
Yes

100 – 1st Floor

Yes
Yes
40
Varies
2 Story
Yes

104-1st Floor

Yes
Yes
116
Varies
1 Story
Yes

144 – 1st Floor

Yes
Yes
10
Varies
1 Story
Yes
34- 1st Fl to 2nd Fl
Yes
Yes
144
Varies
2 Story
Yes
35- 1st Fl to 2nd Fl
Yes
Yes
164
Varies
2 Story
Yes
36- 1st Fl to 2nd Fl
Yes
Yes
112
Varies
2 Story
Yes
37 – 1st Fl-2nd Fl
Yes
Yes
150
Varies
2 Story
Yes

CC 4B

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

1 – 2nd - 5th Fl

Yes
No
490
Varies
7 Story
Yes

18 – 2nd Fl-5th Fl

Yes
No
432
Varies
6 Story
No
19 – 3rd Fl
Yes
No
108
Varies
3 Story
No
22 – 3rd Fl
Youes
No
46
Varies
3 Story
No
2 – 3rd Fl
Yes
No
48
Large
3 Story
No

17 – 3rd Fl

- 5th Fl

Yes
No
504
Varies
5 Story
Yes

CC 4C

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

17-18 Tunnel

Yes
Yes
63
Medium
1 Story
No
19 Tunnel
Yes
Yes
48
Medium
1 Story
No
22 Tunnel
Yes
Yes
12
Medium
1 Story
No
24 Tunnel
Yes
Yes
10
Medium
1 Story
No

Tunnel

Yes
Yes
20
Medium
1 Story
No
6.7.5.2Suspended scaffolds and rope descents from the roof top are not permitted at the Lebanon campus.
6.7.5.3The FCOR will provide special safety requirements and lift equipment/apparatus constraints.

6.7.6 Corporal Michael J Crescenz Veterans Affairs Medical Center (Philadelphia VAMC):

6.7.6.1
CC 5A

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

1
Yes
Yes
1513
Varies
9 Story
Yes
2
Yes
Yes
1073
Varies
8 Story
Yes
21
Yes
Yes
67
Varies
8 Story
Yes
3
Yes
Yes
35
Varies
2 Story
Yes
CLC
Yes
Yes
923
Varies
2 Story
Yes
CLC Atrium 1st Floor
Yes
Yes
11
10 Feet
2 Story
Yes
CLC Atrium 2nd Floor
Yes
Yes
11
19 Feet
2 Story
Yes
CLC Atrium
Yes
Yes
4
20 Feet
2 Story
Yes
Employee Garage
Yes
Yes
506
Varies
4 Story
No
Engineering
Yes
Yes
52
Varies
1 Story
No

CC 5B

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

1 – Entrance

Yes
Yes
1513
Varies
9 Story
Yes

2 – Entrance

Yes
Yes
1073
Varies
8 Story
Yes

21 – Entrance

Yes
Yes
67
Varies
8 Story
Yes

3 – Entrance

Yes
Yes
35
Varies
2 Story
Yes

CLC –

Entrance

Yes
Yes
923
Varies
2 Story
Yes

Employee Garage – Entrance

Yes
Yes
506
Varies
4 Story
No
Engineering – Entrance
Yes
Yes
52
Varies
1 Story
No

6.7.6.2 The facility’s outside windows cannot be accessed from the interior.

6.7.6.3 Exterior window cleaning can only be accomplished on weekends.

The FCOR will identify the outside panes to be cleaned during a CC and will coordinate scheduling with the Contractor’s Facility Manger and the facility’s EMS Manager.

6.7.6.4 Suspended scaffolds and rope descents from the roof top are permitted. The facility’s Engineering and Safety Office must be consulted prior to use.

6.7.7 Pittsburgh VAMC:

6.7.7.1 University Drive Campus:

6.7.7.2
CC 6A

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

1
Yes
Yes
5351
Varies
13 Story
Yes

1 – Lincoln Wall

Yes
N/A
1
Large
3 Story
Yes
29
Yes
Yes
1356
Varies
6 Story
Yes
30
Yes
Yes
447
Varies
4 Story
No
Parking Garage
Yes
Yes
386
Varies
8 Story
Yes
33
Yes
Yes
71
Varies
3 Story
No

Police Booth

Yes
Yes
4
120 SqFt
1 Story
No

1 – Kalwall Surfaces

Elevator Tower Walls, East, West, Floors 1 - 5

5 Story
Yes

Room 2N174, Connecting Corridor

1 Story
Yes

Stairwells 2,3,6,7

13 Story
Yes

11th Floor Breezeways, East & West

1 Story
Yes

Smoking shelter

Yes
Yes
40x16x10
1 Story
No
6.7.7.3Building 29 lobby, Lincoln Wall requires cleaning. It is constructed of honed limestone. There is a staircase at the bottom of the wall. The wall is approximately 30 feet wide and 43 feet tall at the bottom of the staircase and 31 feet tall at the top of the staircase. The Terrazzo flooring around the wall must be protected during cleaning. The FCOR will provide special safety requirements and lift equipment/apparatus constraints.
6.7.7.4Building 29 lobby includes an arched glass ceiling of approximately 258 panes with a total area of approximately 4,620 square feet. The maximum interior height is 43feet. The Terrazzo floor must be protected during cleaning. The FCOR will provide special safety requirements and lift equipment/apparatus constraints.
6.7.7.5Building 29 (Chapel) stained glass window, squeegee cleaning may not be effective.
6.7.7.6Outside windows are to be accessed and cleaned from the outside. The inside panes must be accessed and cleaned from the inside. The FCOR will provide any exceptions. Windows may not be removed for cleaning unless specific approval has been received from the FCOR.

6.7.7.7 Heinz Campus:

6.7.7.8
CC 6B

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

49
Yes
Yes
108
Varies
1 Story
No
32
Yes
Yes
310
Varies
3 Story
No
50
Yes
Yes
974
Varies
2 Story
Yes
51
Yes
Yes
580
Varies
4 Story
Yes
69
Yes
Yes
301
Varies
3 Story
Yes

Vestibules

Yes
Yes
18
Varies
3 Story
Yes
70
Yes
Yes
350
Varies
3 Story
No
Villas
Yes
Yes
414
Varies
3 Story
Yes
71
Yes
Yes
635
Varies
3 Story
Yes

71 – Lt Fixture

Yes
N/A
1
Medium

Yes

52
Yes
Yes
52
Varies
3 Story
Yes
53
Yes
Yes
24
Varies
3 Story
Yes
Canopy to Shelter
Yes
Yes
4
Varies
1 Story
Yes

Smoking Shelter 1

No
Yes

40x16x10

No

Smoking Shelter 2

No
Yes

25x16x10

No

50
No
Yes
251
Small
51
No
Yes
257
Small
Police Booth
Yes
Yes
3
80SqFt
1 Story
No

CC 6C

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

50 – 51 Tunnel

Yes
Yes
88
Varies
2 Story
Yes

50 – 51 Tunnel

No
Yes
102
Small
2 Story
Yes

51 – 71 Tunnel

Yes
Yes
123
Varies
2 Story
Yes
6.7.7.9Building 69 vestibule glass ceilings located at two entrances must be cleaned from the top-side and from the bottom-side. Each entrance has nine panes with a 120 square foot area. Top of glass must be accessed from floor of lobby area
6.7.7.10Building 71 lobby lighting fixture must be cleaned. The following heights and dimensions are approximate. The four-sided fixture is a unique design (20ft x 5ft x 5ft) constructed with metal and glass hanging from a 45foot high ceiling. Top of fixture is 40feet high. Bottom of fixture is 20feet high. Two metal plates are positioned between the fixture and the ceiling which require cleaning. The total fixture surface area is 350 square feet. The FCOR will provide special safety requirements and lift equipment/apparatus constraints.
6.7.7.11Building 71 glass partition around the second-floor stairwell requires cleaning on both sides.
6.7.7.12Suspended scaffolds and rope descents from the roof top are not permitted at the Heinz Campus
6.7.7.13Outside windows are to be accessed and cleaned from the outside. The inside panes must be accessed and cleaned from the inside. The FCOR will provide any exceptions. Windows may not be removed for cleaning unless specific approval has been received from the FCOR.

6.7.8 Wilkes-Barre VAMC:

6.7.8.1
CC 7A

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

8
Yes
Yes
34
Medium
1 Story
No
42
Yes
Yes
19
Medium
1 Story
No
35
Yes
Yes
21
Medium
1 Story
No
7
Yes
Yes
54
Medium
1 Story
No
5
Yes
Yes
49
Medium
2 Story
No
3
Yes
Yes
50
Medium
2 Story
No
2
Yes
Yes
40
Medium
2 Story
No
1
Yes
Yes
1910
Varies
11 Story
Yes

6.7.8.2 Any suspension equipment must be in compliance with Section 3.3 and Section 5 of the PWS. Exterior panes will only be cleaned if accessible from the inside when performing services outlined in CLIN 0017.

6.7.8.3 Many of the facilities outside windows can be accessed and cleaned from the inside. The Contractor must clean the outside when accessible as outlined in section 6.7.8.2. The FCOR will identify windows not to be opened in order to access the outside. Such windows will not require outside cleaning during the CC for CLIN 0017.

6.7.9 Wilmington VAMC:

6.7.9.1
CC 8A

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

1
Yes
Yes
1046
Medium
10 Story
Yes
10
Yes
Yes
20
Medium
1 Story
No
9
Yes
Yes
100
Medium
4 Story
Yes
5
Yes
Yes
35
Medium
1 Story
No
6
Yes
Yes
30
Medium
2 Story
No
7
Yes
Yes
15
Large
2 Story
No
13
Yes
Yes
50
Small
1 Story
No
15
Yes
Yes
20
Small
2 Story
No
17
Yes
Yes
100
Small
1 Story
No

CC 8B

Location/

Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient Area

1 – ground and 1st floor
Yes
Yes
56 plus 9 glass entrances
Medium
10 Story
Yes
10 – ground and 1st floor
Yes
Yes
32 plus 1 glass entrance
Medium
1 Story
No
9 – ground and 2nd, 3rd, and 4th floor
Yes
Yes
100
Medium
4 Story
Yes
5 – ground and 1st floor
Yes
Yes
21 plus 5 glass doors and 1 glass entrance
Medium
1 Story
No
6 – ground and 1st floor
Yes
Yes
11 plus 2 glass doors
Medium
2 Story
No
17 – ground and 1st floor
Yes
Yes
34 plus 5 glass entrances
Small
1 Story
No
15 – ground and 1st floor
Yes
Yes
10
Small
2 Story
No
13 – ground floor
Yes
Yes
44 plus 4 glass entrances
Small
1 Story
No
6.7.9.2There are some rooftop anchors permitting limited suspended scaffolds and rope descent systems for exterior window cleaning. The FCOR will identify anchor locations and the facility’s Engineering Office must be consulted prior to use.
6.7.9.3Exterior windows not accessible from the ground, by lifts, by scaffolding, or suspended systems do not require cleaning; the FCOR will identify such windows.

SECTION 7 – ATTACHMENT/TECHNICAL EXHIBIT LISTING

7.1Attachment 1 – Quality Assurance Surveillance Plan
7.2Attachment 2 – Cleaning Cycle Evaluation
7.3Attachment 3 – Contractor Performance Report
7.4Attachment 4 – Corrective Action Plan

Attachment 1- Quality Assurance Surveillance Plan

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The Contractor will be evaluated in accordance with the following QASP

1.

2.

3.

4.

5.

6.

7.

1 Purpose.

This QASP provides a method to evaluate performance. This QASP explains the following:

· What will be monitored

· How monitoring will take place

· Who will conduct the monitoring

· How monitoring efforts and results will be documented

This QASP does not detail how the Contractor accomplishes the work. Rather, the QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

The Government may review and revise this QASP; revisions will be coordinated with the Contractor. Updates will ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions will be provided to the Contractor and Government officials implementing surveillance activities.

2 Government Roles and Responsibilities.

The following personnel will oversee and coordinate surveillance activities:

Name
Role
Email
Telephone
Rayburg, Pamela
CO
pamela.rayburg@va.gov
412-275-7450
Parker, Anne
VCOR
anne.parker@va.gov
717-272-6621 x3526
Pfeffercorn, Keith
FCOR – Butler
keith.pfeffercorn@va.gov
724-282-5602
Edmondson, Betty
FCOR – Coatesville
betty.edmondson@va.gov
610-384-7711 x3404
Sanfratello, Matthew
FCOR - Erie
matthew.sanfratello@va.gov
814-860-2196
Pedrick, Shannon
FCOR – Lebanon
shannon.pedrick@va.gov
717-272-6621 x6191
Thornabar, Cheryle
FCOR - Philadelphia
cheryle.thornabar@va.gov
215-823-4696
Albertson, Peter
FCOR – Pittsburgh
peter.albertson@va.gov
412-360-3691
Erwine, Matthew
FCOR – Wilkes-Barre
matthew.erwine@va.gov
570-824-3521 x27328
Haar, Robert
FCOR - Wilmington
robert.haar@va.gov
302-994-2511 x34033

Roles:

· Contracting Officer (CO) – The CO will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and will safeguard the interests of the Government in the contractual relationship. The CO will also assure the Contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

· VISN04 Contracting Officer Representative (VCOR) – The VCOR has authority to provide direction to the Contractor if within scope of the contract, does not constitute a change to the contract, and has no funding implications. The VCOR liaisons between the CO, the Facility Contracting Officer Representative (FCOR), and the Contractor. The VCOR does not have authority to change the terms and conditions of the contract.

· Facility COR (FCOR) – The FCOR is responsible for technical administration of the contract and will assure proper Government surveillance of the Contractor’s performance. The FCOR will keep a quality assurance file for the applicable facility and at contract conclusion or when requested by the CO or VCOR, will provide contract performance documentation to the CO or VCOR. The FCOR will meet with the Contractor’s Facility Manager regularly during a CC. The FCOR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The Contractor must refer any changes they deem may affect contract price, terms, or conditions to the CO for action.

3 Contractor Representatives. The Contractor must provide contact information for the Project Manager and all Facility Managers and alternates to the CO and applicable FCOR as presented in Section 2 of this QASP.

4 Performance Standards. Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets or does not meet these standards contained within the Performance Work Statement. The Government will use the standards to determine Contractor performance and will compare Contractor performance to the AQL.

5 Incentives. The Government will report performance through the Contractor Performance Assessment Reporting System (CPARS). The report will be based on the Contractor meeting or not meeting performance standards.

6 Surveillance Methods. Various methods exist to monitor performance. The FCOR will use the surveillance methods listed below in the administration of this QASP. Regardless of the surveillance method, the FCOR will contact the Contractor’s Facility Manager or alternate when unacceptable performance is observed and provide the Facility Manager the observation specifics for immediate remediation.

Task
Standard
PWS Reference
Acceptable Quality Level (AQL)
Method of Surveillance
Remedy
Incentive
Clean Window, Glass, and Surfaces
All surfaces must be clean and free of streaks, smears, soap residue, dirt, paint specs, or other foreign debris.
Section 6
100%
Direct Observation
Contractor must remedy within the Cleaning Cycle
Document performance in CPARS
Clean Window Frames, Sills, Screens, and Window/Screen tracks
Frames, sills, screens, and tracks must be clean and free of dirt, insects, other foreign debris, and cleaning solutions used during the cleaning process.
Section 6
100%
Direct Observation
Contractor must remedy within the Cleaning Cycle
Document performance in CPARS
Submission of required documents
Required documents must be received timely
Sections: 2.5; 3.1; 3.2; 3.3; 6.6
100%
Receipt of documents
Contractor must remedy within the Cleaning Cycle
Document performance in CPARS
Services performed safely
Services are performed safely and meet safety requirements
Section 3.3
100%
Direct Observation
Contractor must remedy immediately
Document performance in CPARS

7 Ratings. A rating system will be used to determine if Contractor performance exceeds, meets, or does not meet requirements and AQL.

Rating Structure

Exceptional
Performance significantly exceeds contract requirements to the Government’s benefit.
Satisfactory
Performance meets contractual requirements
Unsatisfactory
Performance does not meet contractual requirements

7.1 Satisfactory and Exceptional Performance. The FCOR will record satisfactory and exceptional performance following the conclusion of a Cleaning Cycle (CC) by completing the attached Cleaning Cycle Evaluation (CCE) form.

7.2 Unsatisfactory Performance. When unsatisfactory performance occurs the FCOR will inform the Contractor’s Facility Manager.

7.2.1 In situations when the remedy can be easily accomplished (e.g., re-cleaning, returning equipment to original location, etc.) informing the Contractor through written notification is not required; verbal notification of the unsatisfactory performance is acceptable. The FCOR will log issued verbal notifications and the remedy results.

7.2.2 The FCOR determines when written notification is required; if required, the FCOR will complete the attached Contract Performance Report (CPR) and provide it to the Contractor’s Facility Manager or alternate.

· The Facility Manager must acknowledge receipt of the CPR in writing by signing a copy of the CPR.

· Issued CPRs will be included in the FCOR file; a copy must be forwarded to the VCOR and CO.

· The CPR will specify if the Contractor is required to prepare a written Corrective Action Plan (CAP) to include the remedy and strategies to preclude reoccurrence. The CAP is attached. The FCOR will determine CAP submission dates.

· When applicable, the FCOR will review the Contractor’s CAP to determine acceptability. An unacceptable CAP will be returned to the Contractor to allow for modification and resubmission. Copies of acceptable CAPs must be forwarded to the VCOR and CO.

· CPRs requiring work stoppage resulting from unsafe conditions require a written CAP; the CAP remedy must be approved by the FCOR prior to work recommencement.

7.3 The CO will assure the Contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performanc

7.1 7.2 7.3 7.4 7.5 7.6 7.7 8 Documentation.

8.1 The Government will document both positive and negative performance. All reports may become a part of supporting documentation for any contractual action and the annual past performance reporting within CPARS

8.2 Cleaning Cycle Evaluation (CCE). At the conclusion of a CC, the FCOR will complete the CCE form and submit it to the VCOR. This form must be completed within five days of CC conclusion.

8.3 Contract Performance Report (CPR). Unsatisfactory performance notification may be verbal or written depending on severity. The FCOR determines the method of notification. Written notification will be accomplished by completing the CPR. The CPR must be presented to the Contractor’s Facility Manager or alternate and to the VCOR and CO.

8.4 Corrective Action Plan (CAP). The FCOR may determine a CAP is required to resolve unsatisfactory performance. The Contractor must complete and return the CAP within time constraints the FCOR determines. CPRs requiring work stoppage resulting from unsafe conditions require a written CAP; the CAP remedy must be approved by the FCOR prior to work recommencement.

9 Measurement Frequency.

9.1 Surveillance Frequency. The surveillance frequency is defined in the contract or otherwise in this document. The CO, VCOR, or FCOR will periodically analyze whether the surveillance frequency is meeting Government’s needs and will adjust when required.

9.2 Performance Reporting Frequency. The FCOR will communicate regularly with the Contractor during contract performance. The FCOR will provide Contractor performance to the VCOR and CO at the conclusion of each Cleaning Cycle.

10 QASP Acknowledgement.

Signed:

Contractor Name/Title Date

Signed:

Butler FCOR/Title Date Signed:

Coatesville FCOR/Title Date

Signed:

Erie FCOR/Title Date

Signed:

Lebanon FCOR/Title Date

Signed:

Philadelphia FCOR/Title Date

Signed:

Pittsburgh FCOR/Title Date

Signed:

Wilkes Barre FCOR/Title Date

Signed:

Wilmington FCOR/Title Date

Attachment 2 – Cleaning Cycle Evaluation

CLEANING CYCLE EVALUATION

Response

Facility

Task Order Award Date & Number

Cleaning Cycle Start Date

Cleaning Cycle End Date

Did Cleaning Cycle start and end within contract constraints? If not, include a narrative.

Were any verbal performance notifications issued? If yes, summarize and attach supporting documentation. Refer to Section 7.2.1 of the QASP.

Were any Contract Performance Reports (CPR) issued? If yes, summarize and attach supporting documentation.

Were any Corrective Action Plans (CAP) required? If yes, summarize and attach supporting documentation.

Overall rating: Exceptional, Satisfactory, Unsatisfactory. If rated Exceptional or Unsatisfactory include a justification narrative and any applicable documentation

Attachment 3 – Contractor Performance Report

Contract Performance Report

Response

Name and contact information of FCOR

Facility

Task Order Award Date & Number

Create a unique identifier for this CPR

Location of observed unsatisfactory performance

Date of Observance

Describe unsatisfactory performance

Will a CAP be required?

Does an unsafe condition exist?

If yes, explain in detail

Does the unsafe condition require work stoppage?

Date CAP must be submitted to FCOR

Was Contractor’s remedy acceptable? To be answered following remedy completion. If no, explain in detail.

Response

CPR unique identifier

Date CPR received

Cate CAP submission required

Provide detailed plans to correct unsatisfactory performance and strategies to preclude reoccurrence

Attachment 4 – Corrective Action Plan

Corrective Action Plan

File details come from the government source that posted it. Updated .