PWS Wastewater Filtration.pdf
PDF 121 KB Posted
- Attached to
- Wastewater Filtration System
- Solicitation number
- FA452826QCS03
About this file
This is a Performance Work Statement for the purchase, installation, and training of a wastewater filtration system at Minot Air Force Base, North Dakota.
The Contractor must procure and install one complete new EXTRAN Nondestructive Testing (NDT) Wastewater Filtration System in Building 857, Room 163. The system installation must include a feed pump, bag filter, tank, process pump, membrane module, and polishing unit, with all components being new. The Contractor is responsible for performing a physical inspection to verify correct equipment placement and identify defects, conducting an operational test using test chemicals to demonstrate full operational capability, and coordinating with the Government Project Manager at least 48 hours in advance to ensure Government representation during testing. The Contractor must also train approximately ten NDT personnel on system use, inspection, and routine maintenance. Site cleanup is required, including removal of all surplus materials and debris and disposal of trash and waste off-base in compliance with federal, state, and local environmental regulations.
Key deliverables include a project schedule prior to on-site work commencement, an installed and operational system no later than 90 days after contract award, and a one-year warranty on workmanship and manufacture registered in the Government's name upon project acceptance. The period of performance is 90 calendar days from the contract award date, with all work conducted between 7:30 a.m. and 4:30 p.m. Central Time, Monday through Friday, excluding federal holidays. The Contractor must comply with all federal, state, local, and base security, safety, and environmental regulations, submit Safety Data Sheets for hazardous materials to the Base Environmental Management Office, and report any accidents or damage to Government property to the Base Safety Office. All on-site personnel must comply with base security procedures and provide required personal information for base access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DAF Clauses.pdf | ||
| D and F Brand Name - Wastewater Filtration.pdf | ||
| Provisions and Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Purchase, Installation, and Training for a Wastewater
Filtration System Minot Air Force Base, North Dakota
Table of Contents
1.0 General Requirement
2.0 Contractor Tasks
2.1 System Installation
2.2 System Testing
2.3 Training
2.4 Site Cleanup and Disposal
3.0 Deliverables
4.0 Government Responsibilities
5.0 Performance Details
6.0 Security and Safety
Performance Work Statement | Minot AFB
1.0 General Requirement
The Contractor must provide the water filtration system, all materials, labor, and management necessary to install one new EXTRAN Nondestructive Testing (NDT) Wastewater Filtration System. The
Contractor must also train Government personnel on the system’s operation and maintenance. All work will be performed at Building 857, Room 163, Minot Air Force Base, ND.
2.0 Contractor Tasks
2.1 System Installation
2.1.1 The Contractor must purchase and install one complete and new EXTRAN NDT Wastewater
Filtration System on the North wall of Building 857, Room 163.
2.1.2 The system installation must include a feed pump, bag filter, tank, process pump, membrane module, and a polishing unit. All components and materials must be new.
2.2 System Testing
2.2.1 The Contractor must perform a physical inspection of the installed system to verify correct equipment placement and identify any defects.
2.2.2 The Contractor must conduct an operational test by running test chemicals through the system to demonstrate it is fully operational.
2.2.3 The Contractor must coordinate with the Government Project Manager at least 48 hours in advance to ensure a Government representative is present to observe the operational test.
2.3 Training
2.3.1 The Contractor must train (approximately ten) Nondestructive Testing (NDT) personnel on the use, inspection, and routine maintenance of the installed filtration system.
2.4 Site Cleanup and Disposal
2.4.1 The Contractor must keep the worksite clean and organized.
2.4.2 At the end of the project, the Contractor must remove all surplus materials and debris from the worksite.
2.4.3 The Contractor must dispose of all trash and waste off-base, in accordance with all federal, state, and local environmental regulations.
Performance Work Statement | Minot AFB
3.0 Deliverables
Deliverable Due Date
Project Schedule Prior to start of on-site work
Installed and Operational System No later than 90 days after contract award
One-Year Warranty Workship & Manufacture Upon project acceptance
3.1 The Contractor must register the warranty in the Government’s name.
4.0 Government Responsibilities
4.1 The Government will provide the Contractor with access to the work site.
4.2 The Government will identify a Government Point of Contact to communicate with the Contractor at the time of award.
4.3 The Government will have a representative present to observe the operational test.
5.0 Performance Details
5.1 Period of Performance: The Contractor must complete all work within 90 calendar days from the date of contract award.
5.2 Place of Performance: Building 857, Room 163, Minot Air Force Base, ND.
5.3 Hours of Work: The Contractor must perform all work between 7:30 am and 4:30 pm (Central Time), Monday through Friday, excluding federal holidays.
6.0 Security and Safety
6.1 The Contractor and all personnel must comply with all federal, state, local, and base security, safety, and environmental laws and regulations.
6.2 The Contractor must comply with established security procedures for entering the installation requiring personal information for all on-site personnel to gain base access. Required information will be coordinated with the Government POC.
6.3 The Contractor must submit Safety Data Sheets (SDS) for any hazardous materials to the Base
Environmental Management Office before using them.
6.4 The Contractor must report any accidents or damage to Government property to the Base Safety
Office.
File details come from the government source that posted it. Updated .