This is a Performance Work Statement (PWS) for repair and maintenance of overhead doors at the 126th Air Refueling Wing, Scott Air Force Base, Illinois, dated February 5, 2026, under contract number VDYD262004.

The contractor must repair and maintain 46 overhead doors across multiple buildings (5002, 5004, 5006, 5010, 5016, 5020, 5022, 5024, 5029, 5038, 5046, and 5048) to extend their service life. Work includes addressing identified defects such as inoperable safety stops and wiring, damaged or poorly conditioned paint, broken lift springs and chains, damaged seals, dented panels, malfunctioning controls, and other component failures. The contractor is responsible for verifying all measurements and conditions during a single official site visit. The period of performance is to be proposed by the contractor and negotiated with the government following issuance of the Notice to Proceed (NTP), with work scheduled to commence within ten calendar days of NTP. A kick-off meeting must occur within one week of NTP, followed by bi-weekly coordination meetings with the 126th Contracting Squadron. All work shall be performed during standard 8-hour days, Monday through Friday, 7:30 AM to 4:30 PM local time, excluding federal holidays and 126ARW scheduled down days. The contractor must comply with all applicable UFC, NFPA, NEC, and Air Force Corporate Facilities Standards; provide material submittals on AF Form 3000; maintain detailed construction schedules with two-week look-ahead planning; and deliver comprehensive as-built documentation, removed and installed equipment inventories in Microsoft Excel format per ASTM-E1557-09 Uniformat II Level 4 standards, and hazardous material disposal records.

View the file

Other files

File Type Posted
Site Visit Sign-In_Redacted.pdf PDF
PWS - REPAIR Overhead Doors - REVISED 4-23-26.pdf PDF
Site Visit MFR.pdf PDF
Site Visit Sign-In.pdf PDF
Solicitation - W50S7S26QA001.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

REPAIR Overhead Doors

VDYD262004

SCOTT AIR FORCE BASE, ILLINOIS

5 February 2026

1. REQUIREMENT:

a. BACKGROUND: The 126ARW has 46 overhead doors that require routine maintenance and minor repairs to restore their functionality.

b. OBJECTIVES: This objective of this project is to perform maintenance and repairs of the overhead doors identified in this PWS to extend the service life of each door.

c. PROJECT LOCATION: All work will be at the 126th Air Refueling Wing, Scott AFB, Illinois.

2. PROJECT ADMINISTRATION:

a. SITE VISIT: Contractor is responsible for verifying all measurements and conditions pre-bid. The Government intends to only hold one official site visit. Requests for additional site access must go through the 126th Contracting Squadron (126 CONS) point of contact (POC) listed in the Request for Proposal (RFP) letter. Any additional site access will be made available to all Contractors solicited for this project.

b. MEETINGS

i. Kick-Off Meeting/Project Schedule – Kick-off meeting to occur within one week of NTP. Overall project schedule with milestone markers and 2-week look-ahead to be completed at kick-off meeting.

ii. Contractor shall coordinate with the 126th Contracting Squadron (126 CONS) on bi-weekly meetings once the construction phase begins. This meeting shall include the review of an updated 2-week look ahead schedule. Contractor shall provide meeting minutes within 24 hours of each meeting and allow the Government up to 24 hours to accept or request changes to the minutes.

3. PROJECT SCOPE:

a. Each CLIN explains the defects that the 126ARW has identified with overhead doors.

The contractor will address the known issues identified in the following CLINS. To the max extent possible contractors should identify defects not noted below by an RFI prior to bid submission.

b. BASE BID (CLIN 001): All Buildings (Section C-N)

c. Building 5002

i. Door 1, Room 139:

(1) The safety stop for the door is inoperable. The wire has detached from the safety sensor preventing the door from opening if a person or object is in the door’s path as it closes. Remove the existing safety stop and associated wiring and replace with a compatible option. (Material submittal will be required for all safety stops)

(2) Figure 1: Example of Broken Safety Wiring

(3) The. The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

(a) Scott AFB Installation Facility Standards (IFS) requires the exterior doors to be painted in Dark Bronze/Brown Finish.

(b) NOTE: Some doors at the 126 ARW do not match the IFS. The expectation is to match the existing door color. Ex. White paneled doors will NOT be painted dark bronze/brown.

(c) Figure 2: Scott AFB IFS Example Overhead Door Color

ii. Door 2, Room 138:

(1) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

(i) Figure 3: Example of Worn/Faded/Chipped Paint

(2) The protective coating for safety wire is corroded. Remove the existing safety stop and associated wiring and replace with a compatible option.

a.

Figure 4: Example of Corroded/Damaged Safety Wiring

d. Building 5004

i. Door 1, Room 201

(1) The safety switch wire needs to be replaced. It currently drags when opening.

Remove the existing safety stop and associated wiring and replace with a compatible option.

ii. Door 2, Room 201

(1) The bottom seal is damaged. Remove the damaged seal and replace it with a similar option.

(2) There is damage on the inside panel of the door. Repair the damaged area to restore a uniform appearance.

iii. Door 3, Room 201

(1) There is damage to the side seals and bottom seal of the door. Remove the damaged seals and replace them with a similar option.

iv. Door 4, Room 201

(1) The safety switch wire is in poor condition. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The bottom seal of the door is cracked. Remove the damaged seal and replace it with a similar option.

v. Door 5, Room 200

(1) The lift chain has excess slack. Repair or replace the chain to remove the excess slack and restore the original functionality of the door.

vi. Door 6, Room 200

(1) The exterior panel of the door is dented. Repair the dent. Repaint if required.

e. Building 5006

i. Door 1, Room 112

(1) The bottom panel is damaged. Repair the damage and repaint if required.

ii. Door 2, Room 112

(1) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

iii. Door 3, Room 112

(1) The safety stop is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

iv. Door 4, Room 112

(1) The lift spring is broken. Remove the broken lift spring and replace it with a compatible option.

v. Door 5, Room 114

(1) The exterior panel of the door is dented. Repair the damage and repaint if required.

vi. Door 6, Room 113

(1) The safety stop is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

vii. Door 7, Room 115

(1) The safety stop is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The emergency stop does not work. Repair or replace the controller to restore the functionality of the emergency stop.

viii. Door 8, Room 115

(1) The safety stop is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) Door has been reported to close randomly. Repair or replace the controller to restore the functionality of the emergency stop.

(3) The door seals are damaged. Remove the damaged seal and replace it with a similar option.

f. Building 5010, Room 112

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The bottom seal is cracked and needs to be replaced. Remove the damaged seal and replace it with a similar option.

(3) The seal around the window is cracked and needs to be replaced. Remove the damaged seal and replace it with a similar option.

g. Building 5016

i. Door 1, Room 132

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

ii. Door 2, Room 133

(1) The safety stop is inoperable, and the wiring is in poor condition. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

(3) Remove and replace the bent lower metal strip. Repaint as necessary to ensure a smooth and even finish.

iii. Door 3, Room 133

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

iv. Door 4, Room 133

(1) The controls are malfunctioning. The stop button must be pressed when closing the door otherwise the door will reopen. Repair or replace the controller to restore the functionality of the close button.

i.

Figure 5: Example of Overhead Door Controls

(2) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(3) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

v. Door 5, Room 134

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The door has scratched paint. Sand the door to restore a smooth finish, prime, and paint to match the existing paint color.

h. Building 5020

i. Door 1, Room 13

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

ii. Door 2, Room 13

(1) The safety stop for the door is inoperable, and the safety switch wires need to be replaced. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) Fix dented panel on the top left for the interior of the door. Repaint as required.

iii. Door 3, Room 6

(1) The safety stop for the door is inoperable, and the safety switch wires need to be replaced. Remove the existing safety stop and associated wiring and replace with a compatible option.

iv. Door 4, Room 6

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) Fix dented panel on the interior of the door. Repaint as required.

v. Door 5, Room 6

(1) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

vi. Door 6, Room 7

(1) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

vii. Door 7, Room 7

(1) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

(2) The safety stop for the door is inoperable, and the safety switch wires need to be replaced. Remove the existing safety stop and associated wiring and replace with a compatible option.

i. Building 5022

i. Door 1, Room 25

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

ii. Door 2, Room 26

(1) The safety stop for the door is inoperable. Remove the existing safety stop and

iii. Door 3, Room 47 associated wiring and replace with a compatible option.

iv. Door 4, Room 50

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

v. Door 5, Room 69

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

vi. Door 6, Room 84

(1) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

j. Building 5024

i. Door 1, Room 105

(1) The down button does not automatically close the door but must be held to close the door. Repair or replace the controller to allow a single button press to close the door.

(2) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(3) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

ii. Door 2, Room 119

(1) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(2) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

iii. Door 3, Room 110

(1) The brush sweep is bent on the outside of the door. Repair or replace the bent sweep to restore functionality. Repaint as required for an even finish.

iv. Door 4 (Accordion style), Room 105/Hangar Door

(1) The gearbox of the left motor on the right door is defective. Remove the damaged gearbox and replace with a compatible option to restore door functionality.

k. Building 5029

i. Door 1, Room 114

(1) The down button does not automatically close the door but must be held to close the door. Repair or replace the controller to restore the functionality of the close button.

(2) The safety stop for the door is inoperable. Remove the existing safety stop and associated wiring and replace with a compatible option.

(3) The bottom door seal is currently missing. A new seal needs to be installed to prevent water intrusion.

ii. Door 2, Room 101

(1) The down button does not automatically close the door but must be held to close the door. Repair or replace the controller to restore the functionality of the close button.

(2) The door is rubbing on the left side when opening. It appears that the bottom of the door has dislodged and is causing the noise while opening.

iii. Door 3, Room 29

(1) The overhead door is currently inoperable. The door has power and is currently indicating an interlock problem. The limit switches and safety eyes were tested locally and are believed to be functioning properly. Locate the malfunctioning interlock (suspected in the drum of the rollup door) and repair or replace to restore the functionality of the door.

l. Building 5038

i. Door 1, Room 101

(1) The door seal is missing. A new seal needs to be installed to prevent water intrusion.

(2) The paint is in poor condition. Sand the door to restore a smooth finish, clean the door, paint with a corrosion inhibiting primer, and paint at least two coats of base paint ensuring full and even coverage to match the existing paint color.

m. Building 5046

i. Door 1, Room 901 (West Side)

(1) The safety stop for the door is inoperable, and the wiring is in poor condition.

Remove the existing safety stop and associated wiring and replace with a compatible option.

ii. Door 2, Room 901 (East Side)

(1) The wheel mount is broken. Repair or replace the broken wheel mount to restore the original functionality.

n. Building 5046 Which is 5048????

i. Door 1, Room 110 (East Side)

(2) The wheel is out of the track. Restore the track to the original condition and address underlying conditions that caused the wheel to leave the track.

ii. Door 2, Room 110 (East Side)

(1) The safety stop for the door is inoperable, and the safety switch is not mounted properly and currently is hanging down. Remove the existing safety stop and associated wiring and replace with a compatible option.

iii. Door 3, Room 110 (West Side)

(1) The interior panel of the door is damaged. Repair the damage and repaint as necessary for a uniform finish.

iv. Door 4, Room 110 (West Side)

(1) The interior panel of the door is damaged. Repair the damage and repaint as necessary for a uniform finish.

4. DELIVERABLES: Contractor shall provide all material submittals to the contracting office for review using the Air Force Form 3000 (AF3000).

5. SCHEDULE:

a. Performance period: The period of performance (PoP) for this project shall be proposed by the contractor and negotiated with the government from the date that Notice to Proceed (NTP) is issued. All work must be scheduled to be complete within this timeframe. Any modifications or extensions must be requested through the 126th Civil Engineer Squadron (126 CES) and the Contracting Officer for review and discussion. Contractor must provide construction milestones to 126 CES and the Contracting Officer.

b. Prior to beginning construction, Contractor shall provide to the CO and 126 CES construction milestones in sufficient detail to accurately identify all phases/disciplines of work to be performed.

c. Contractor shall provide general construction schedule, showing, at a minimum, the critical path items.

d. Contractor will be required to provide 2-week look ahead at each meeting described above.

e. Construction may be authorized by the Contracting Officer upon acceptance and approval of the schedule and equipment/material submittal approvals.

6. SPECIFICATIONS:

a. All work performed shall comply with all applicable UFC, NFPA, NEC and other local and federal regulations and code. This includes but is not limited to:

i. Unified Facilities Criteria (UFC) 1-200-01 General Building Requirements

ii. UFC 3-250-01 Pavement Design for Roads and Parking Areas

iii. Air Force Corporate Facilities Standards

iv. UFC 3-120-01 Design Sign Standards

v. Scott Air force Base Architectural Compatibility Guidelines

7. GENERAL CONDITIONS:

a. An alternate method can be proposed for any of the above tasks and will be reviewed.

Any alternate methods or deviations from the requested work shall be called out or highlighted in the Contractor’s proposal in a manner that is clearly identifiable. Any approved alternate methods will result in a SOW modification prior to the commencement of work. The Government will assume any additional design or construction costs associated with the approved alternatives but will not assume any costs associated with the Contractor processing this required modification.

b. A phased approach is to be used in the construction of these projects to minimize disruptions.

c. Contractor must ensure that all accesses to the building be left clear of construction materials when not on the worksite. Ensure material/tools/equipment do not hamper operations during operating hours.

d. Contractor shall supply any dumpsters required to properly dispose of any construction materials.

e. Contractor shall coordinate with CE for enter/exit points to access job site, for this facility. Contractor to coordinate with CE for location of dumpster.

f. Contractor shall site verify all dimensions and/or existing site conditions prior to the commencement of work. Commencement of work shall begin within ten (10) calendar days upon the receipt of the NTP issued by the Contracting Officer.

g. Contractor shall be completed within the agreed upon PoP as stated within the contract issued by the Contracting Officer.

h. Contractor shall be required to apply for and submit to the Contracting Officer an AF Form 103, Work Clearance Request, for all work to be accomplished under this delivery order five (5) days prior to the commencement of work. The AF Form 103 can be obtained from and approved by 126CES.

i. Contractor shall brief all Sub-Contractors on all safety and fire prevention regulations, emphasizing the requirement to obtain a daily AF Form 592, Welding, Cutting, and Brazing Permit, when welding, cutting, or brazing operations are to occur under this delivery order. The AF Form 592 can be obtained from and approved by 126CES.

j. Contractor shall complete and submit the appropriate DD Form 1354, Transfer and Acceptance of DoD Real Property to the 126CES for records. The DD Form 1354 can be obtained from 126 CES.

k. Contractor shall provide an inventory, utilizing Microsoft Excel, of all removed systems to ASTM-E1557-09 Uniformat II, Level 4 system detail. Detail data includes

Facility Number, ID Number (if available); Equipment Type; Equipment Make;

Serial Number; Model; Capacity; Manufacturer; and Location. Contractor shall provide the government two copies of CD/DVD media with an electronic copy of the removed systems inventory as part of the final close out document package.

l. Contractor shall provide an inventory, utilizing Microsoft Excel, of newly installed systems to ASTM-E1557-09 Uniformat II, Level 4 system detail. Since section detail data can be recorded for equipment and non-equipment section types, some of the data elements may not apply to component-sections. The Contractor must provide section detail data for those data elements that do apply (see Attachment 4).

i. Section detail data includes Facility Number; Level 2 Group Element (System) Description; Level 3 Individual Element (Component) Description; Level 4 Sub-Element (Section) Description; Sub-Element Description; Equipment Type; Equipment Make; Serial Number; Model; Capacity; Manufacturer;

Warranty Company; Warranty Expiration Date; Location; Date Manufactured; Control Type/Make and Year Installed.

ii. Contractor shall provide the government two copies of CD/DVD media with an electronic copy of the installed systems inventory as part of the final close out document package.

m. Contractor shall provide an electronic draft copy of the installed systems inventory for review and issuance of the applicable inventory ID Number and bar-code labels at least 30 days prior to O&M handover walk-through (conducted prior to contract close out).

n. Contractor shall, during construction, keep an accurate electronic record of as-built conditions, all variations from the contract drawings (that have been approved by the contracting officer or COR in writing in advance of any such variations - including those made because of the selection of optional materials), shall be clearly indicated.

These variations shall be shown in the same general detail utilized in the initial contract drawings. The as-built drawings shall be maintained in a current condition during construction. The as-built drawings shall be furnished to the Contracting Officer and 126 CES not later than ten workdays after the final inspection date. As part of the as-built drawings a separate set of plans shall be marked-up showing areas found/known to contain asbestos.

o. Contractor shall install bar-code labels on all newly installed systems, as required.

Bar-code labels must match applicable component-sections standardized on the Base.

p. All documents related to the disposal of hazardous material must be supplied to 375 CONS and 126 CES. The Contractor must obtain the proper documents from 126 CES to ensure all materials leaving Scott Air Force Base can be tracked and accounted for, in accordance with all governing laws.

q. Under the 1992 Clean Air Act, all products used in executing this project must not be related to the Class I Ozone Depleting Chemicals (ODCs) identified in Air Force Policy. The following products are considered Class I ODCs: CFC-11, CFC-12, CFC- 113, CFC-114, CFC-115, Halon 1211, Halon 1301, Halon 2402, CFC-13, CFC-111, CFC-112, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, CFC-217, Carbon tetrachloride, and Methyl Chloroform.

r. Respondents are encouraged to prioritize the utilization of utility company energy savings incentives as a key funding mechanism for the implementation of proposed projects. These incentives should be thoroughly explored and integrated into the proposed plan to maximize cost-effectiveness and ensure alignment with energy savings measures. Demonstrating a proactive approach to leveraging these incentives will be viewed favorably during the evaluation process.

s. The awardee of this solicitation will need to determine if any components of this project are eligible for the local utility companies' energy efficiency rebate/incentive program. The awardee will be responsible for preparing and submitting the application to the utilities program. New Construction/Custom applications require a preapproval from the local utility's energy efficiency program prior to placing an order for material with a vendor. The awardee is responsible for the general rules and requirements of the local utility's EE application.

8. FIELD CONDITIONS:

The Contractor shall be responsible for all field measurements to accomplish work.

Quantity and sizes of materials shall be determined from site visits and drawings. The Contractor shall carefully examine the entire site and building and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents.

9. ACCOMPLISHMENT OF WORK:

The work areas of the existing building will be in occupied and unoccupied areas. The Contractor must ensure that all access to the existing building always remains clear for occupants and emergency access during the construction period. All temporary closures, barriers, and protective procedures shall be coordinated with the Contracting Officer. All work shall be accomplished during the standard 8-hour day, 5-day week, Monday through Friday, between the hours of 7:30 A.M. and 4:30 P.M. local time, excluding Federal Legal holidays and nonwork days resulting from holidays occurring on weekends.

However, power outages shall be accomplished on weekends or 126ARW down days (calendar provided). The 126ARW has a compressed schedule and does have roughly two down days per month, typically on Fridays. Please reference the 126ARW calendar to coordinate the construction schedule to not work on scheduled down days unless required.

10. WORK CONDITIONS:

The Contractor shall coordinate work with the Contracting Officer, in conjunction with the User and 126 CES. The Contractor shall notify the Contracting Officer or the 126 CES inspection representative the day before he/she moves onto the work site to commence work.

The Contractor shall again provide notification the day he moves back to the work site after an interruption of work of two or more days in duration. The Contractor shall also provide an original work schedule and updates if required. This schedule shall describe major work items and projected completion dates.

11. PROTECTION OF BUILDING PROPERTY:

The Contractor shall protect from damage all building property located in or adjacent to the building and shall repair, replace, or otherwise be held liable for all such damage. Building properties include but are not limited to, furniture, vehicles, or items of supplies. Exercise control measures of all dust and toxic fumes associated with construction operations, to prevent hazards or illness to base and Contractor personnel.

12. CLEANUP:

The Contractor shall cleanup each work site at the end of each workday to the satisfaction of the Contracting Officer. Upon completion of the work, all construction equipment and debris shall be removed from the site and the area shall be left in a neat and completely acceptable condition as required by the General Provisions. Contractor must always recycle materials, such as, but not limited to cardboard and paper. The Contractor will use whatever means necessary to store all recyclable materials and is responsible for turning in recyclable materials to the Base Recycling Center.

13. PATCHING AND REPAIRING:

After the work has been completed, holes, cuts, and damages made in the finished surfaces of the work site and adjacent areas shall be properly repaired and restored to match the existing finishes. Any abrasion or disfigurement of the finish work or any portion of the building where any such abrasion or disfigurement is caused by the activities of the Contractor shall be repaired and neatly refinished to match the adjacent work to the satisfaction of the Contracting Officer. Contractor shall maintain integrity of all fire walls/barriers.

14. PRODUCTS:

All products shall conform to their respective manufacturing and performance publications.

All materials and equipment used in the work area shall be the products of manufacturers regularly engaged in the manufacture of construction products.

15. SUBMITTALS:

The Contractor shall submit for approval all items as required by other parts of these specifications. The Contracting Officer may request submittals in addition to those required by the other parts of this Statement of Work when deemed necessary to adequately describe the work. Submittals shall be made to the Contracting Officer in five (5) copies using AF Form 3000, Material Approval Submittal. In general, submittals shall be provided a minimum of thirty (30) calendar days in advance of scheduled installation to allow satisfactory time for Government review. Additionally, unless stated otherwise submissions on test results and other submissions of a similar nature shall be made within fourteen (14) calendar days after the work or test is performed. Each submittal shall be complete and in sufficient detail for ready determination of compliance with contract requirements.

Submittals shall include such items as Contractor’s or manufacturer’s shop drawings, descriptive literature, catalog cuts, samples, certifications, installation procedures and recommendations, templates, and other descriptive literature as may be required by the Contracting Officer. Catalog cuts and other descriptive data which may have more than one model or type shall be clearly marked to show the model, type, size, and all optional or accessory equipment the Contractor proposes to install. Submittals on component items forming a system or interrelated items shall be submitted at one time as a single submittal to demonstrate that the items have been properly coordinated and will function as a unit.

Approval of submittals will not relieve the Contractor of compliance with the project drawings and specifications. Submittal items that are disapproved will be promptly corrected and resubmitted by the Contractor. No materials shall be installed until submittals are approved by the Contracting Officer. All submittals involving color selections, patterns, and other decorative architectural features shall be submitted at the same time for both interior and exterior materials.

16. SPECIFICATIONS:

Work shall be performed in strict accordance with these contract general specifications, as well as all applicable local, state, and national Building and Life Safety Codes, American Society for Testing and Materials (ASTM) specifications. Safety plans and procedures issues must adhere to all applicable Occupational Safety and Health Act (OSHA) regulations.

17. PROJECT POINTS OF CONTACT:

The project points of contact for this project are:

Contracting Specialist/Officer MSgt Benjamin James 126th Contracting Office P: 618-222-5112 Email: benjamin.james.1@us.af.mil

Project Manager Capt Brett Luithly 126th Civil Engineer Squadron P: 618-222-4886 Cell: 260-615-5492 Email: brett.luithly@us.af.mil mailto:benjamin.james.1@us.af.mil mailto:brett.luithly@us.af.mil

Construction Inspector/Manager Mr. Larry Fuller 126th Civil Engineer Squadron P: 618-222-4889 Cell: 217-313-1023 Email: larry.fuller@us.af.mil

Real Property Manager Mr. Eric Bennett 126th Civil Engineer Squadron P: 618-222-4890 Email: eric.bennett.11@us.af.mil mailto:larry.fuller@us.af.mil mailto:eric.bennett.11@us.af.mil

File details come from the government source that posted it. Updated .