PWS - Install Key Card Door Locks B755.pdf

PDF 114 KB Posted

Attached to
Install Key Card Door Lock System, RAFB Federal contract opportunity
Solicitation number
FA850121QB755
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Install Key Card Door Lock System, RAFB, newest first.
File Type Posted
PWS - Install Key Card Door Locks v3.pdf PDF
RFI and Governments response.docx DOCX document
Image of Door for Key Card Install.docx DOCX document
Combo Synopsis Solicitation- Key Card Door Lock System.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

B755 Install Key Card Door Lock System

Work Task 9347557

17 February 2021

1.0 DESCRIPTION OF SERVICES/GENERAL INFORMATION.

1.1. The contractor shall provide all material and labor to install an RFID key card lock system at B755 to include the following:

1. OnPoint RFID Key Card Encoding System

2. Qty. 500 HiCo Magnetic Key Cards

3. Qty. 13 Trillium, Mag Stripe Reader Door Locks LH

4. Qty. 12 Trillium, Mag Stripe Reader Door Locks RH

5. Qty. 25 Mortise Wrap Plates

6. Qty. 68 Weather Kits (Moisture Boot)

7. Reset 48 Existing Locks

8. Set up and training for key card system

Note: All new components must be compatible with existing Onity key card system.

2.0 SERVICES SUMMARY:

Performance Objectives Reference

Para.

Performance Threshold

B755 Install Key Card Door Lock

System

1 No deficiencies

3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES: The contracting officer’s representative (COR) will provide the contractor access to the dormitory building. The government will require the contractor to restore the work areas back to the as – received conditions prior to cleaning upon completion of cleaning tasks. The government will provide the contractor access to power requirements.

4.0 WARRANTY AND TECHNICAL SUPPORT REQUIREMENTS: Manufacturer’s warranties apply on all parts and labor. The warranty and technical support period commences no earlier than March 2021. Installation must be performed by a manufacturer-certified installer with an active manufacturer contract.

5.0 PERIOD OF PERFORMANCE: Contract performance shall be completed by 15 April 2021.

6.0 APPENDICES: N/A