PWS - Install Key Card Door Locks v3.pdf
PDF 115 KB Posted
- Attached to
- Install Key Card Door Lock System, RAFB Federal contract opportunity
- Solicitation number
- FA850121QB755
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Image of Door for Key Card Install.docx | DOCX document | |
| RFI and Governments response.docx | DOCX document | |
| Combo Synopsis Solicitation- Key Card Door Lock System.pdf | ||
| PWS - Install Key Card Door Locks B755.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
B755 Install Key Card Door Lock System
Work Task 9347557
17 February 2021
1.0 DESCRIPTION OF SERVICES/GENERAL INFORMATION.
1.1. The contractor shall provide all material and labor to install an RFID key card lock system at B755 to include the following:
1. OnPortal Encoding System
2. OnPortal License
3. Mag Stripe Motorized Encoder
4. Qty. 500 HiCo Magnetic Key Cards
5. Qty. 13 Trillium, Mag Stripe Reader Door Locks LH
6. Qty. 12 Trillium, Mag Stripe Reader Door Locks RH
7. Qty. 25 Mortise Wrap Plates
8. Qty. 68 Weather Kits (Moisture Boot)
9. Reset 48 Existing Locks
10. Set up and training for key card system
Note: All new components must be compatible with existing Onity key card system.
2.0 SERVICES SUMMARY:
Performance Objectives Reference
Para.
Performance Threshold
B755 Install Key Card Door Lock
System
1 No deficiencies
3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES: The contracting officer’s representative (COR) will provide the contractor access to the dormitory building. The government will require the contractor to restore the work areas back to the as – received conditions prior to cleaning upon completion of cleaning tasks. The government will provide the contractor access to power requirements.
4.0 WARRANTY AND TECHNICAL SUPPORT REQUIREMENTS: Manufacturer’s warranties apply on all parts and labor. The warranty and technical support period commences no earlier than March 2021.
Installation must be performed by a manufacturer-certified installer with an active manufacturer contract.
5.0 PERIOD OF PERFORMANCE: Contract performance shall be completed within 75 days of award.
6.0 APPENDICES: N/A
File details come from the government source that posted it. Updated .