This is a Performance Work Statement (PWS) for a targeted hazardous materials survey of Building 3400, Floor 3 (154 Wing Head Quarters) at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, Hawaii 96853.

The contractor shall conduct a comprehensive hazardous materials survey and provide a detailed report identifying the presence, location, and quantity of asbestos-containing materials (ACM), lead-based paint (LBP), polychlorinated biphenyls (PCBs), mercury-containing equipment, mold and moisture intrusion, and Resource Conservation and Recovery Act (RCRA) 8 metals. The survey includes visual inspection and representative sampling of suspect materials, electrical equipment inspection for PCBs and mercury, laboratory analysis using DoD ELAP or NELAP certified laboratories, and adherence to EPA analytical methods including Polarized Light Microscopy for asbestos, Flame Atomic Absorption Spectroscopy for lead and heavy metals, and EPA Method 8082A for PCBs. The contractor must ensure all personnel conducting survey and sampling activities are State of Hawaii-certified building inspectors with required licenses and certifications submitted prior to work commencement. The Period of Performance is 10 work days from contract award, with services performed between 0700-1600 Monday through Friday at the specified location, excluding recognized US federal holidays and facility closures.

The contractor shall furnish all personnel, equipment, tools, materials, supervision, and quality control necessary for performance. The Government will provide workspace, desk space, telephones, computers, and utilities. Key deliverables include a work plan and schedule, personnel certifications, and a comprehensive final report submitted with an executive summary, introduction, sampling methodology explanation, laboratory information, detailed results, survey summary, recommendations for safe handling and disposal of hazardous materials, and appendices containing inspector certifications, sample location drawings with photographs, and complete laboratory analytical reports. The contractor shall develop and maintain a Quality Control Plan addressing identified performance requirements and comply with all security, antiterrorism awareness training, OPSEC, and installation access requirements, including obtaining base identification and vehicle passes for all personnel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

PERFORMANCE WORK STATEMENT (PWS)

FOR

Targeted Hazardous Materials Survey Building 3400

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to complete a targeted hazardous materials survey for building 3400 as defined in this PWS.

1.1.1 Objectives: Complete a targeted hazardous materials survey and furnish report for Building 3400, floor 3, (154 Wing Head Quarters) at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, HI 96853.

1.2 Background: Complete a targeted hazardous materials survey and furnish report for floor , Building 3400. Survey should include testing for Lead Based Paint, Asbestos, Polychlorinated biphenyls (PCBs), mercury, mold, and heavy metals. Contractor shall be experienced with industrial health sampling methods and execute discrete/multi incremental/other testing IAW with appropriate sampling procedures. Analytical test shall be done by a DoD ELAP or NELAP certified laboratory. All work shall comply with applicable building codes, safety standards, and manufacturer recommendations.

All work shall be completed as indicated on this PWS, the Contract drawings, and in accordance with specifications and codes. Contractor personnel shall comply with the State of Hawaii minimum required level of training to work as qualified Roll up Door systems technician contractors and provide a copy of the license/certification to the contracting officer (for each employee) at the time of contract start. The work shall be performed following all applicable Federal and State codes and regulations, including the requirements stated in this PWS. The Contractor must coordinate with the 154 Civil Engineering Squadron (CES) to access the work site as well as coordinate with the 154 CES environmental section for any hazardous materials storage/disposal.

1.3 Period of Performance (PoP): The PoP shall be 10 work days from date of contract award.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at:

This project is located at Building 3400 at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, HI 96853.

The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the GOVERNMENT POC. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.

3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

4. Reserved

5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6. Failure to comply with these requirements may result in withholding of final payment.

1.4.5.1. Reserved

1.4.5.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the GOVERNMENT POC or unit AT Representative.

The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the GOVERNMENT POC within 15 calendar days after completion of training by each employee or subcontractor personnel.

1.4.5.4 Reserved.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD http://jko.jten.mil/ organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved

1.4.5.7 Advanced Distributed Learning Service (ADLS). All contractor employees and associated sub-contractor employees assigned to work on a Government site and/or requiring access to a DoD network will be required to register with ADLS at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD IAA CyberAwareness, Protecting Sensitive Information, Force Protection, etc.). ADLS website:

https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.

1.4.5.11 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSEC Awareness for Military Members, DoD Employees and Contactors) is located on the Security Training, Education, and Professionalization Portal (STEPP), https://cdse.usalearning.gov and the OPSEC Annual training – DAF OPSEC Awareness Training located on My Learning, https://lms-jets.cce.af.mil/moodle/course/view.php?id=11654#section-1.

The contractor shall submit certificates of completion for each contractor employee to the GOVERNMENT POC within 15 calendar days after completion of training.

https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp

1.4.5.12 OPSEC Plan. The contractor shall develop an OPSEC Plan and provide it to the GOVERNMENT POC or KO within 15 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC officer, per AFI 10-701, Operations Security. This Plan shall include the Government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect

it. For the contractor to effectively comply with OPSEC provisions of the contract, the organization will provide the following guidance: (1) Organization’s Critical Information;

(2) Adversaries’ collection threat information as it applies to the organization’s mission and the contract; (3) Operations Security guidance; and (4) Specific OPSEC measures the organization requires (as appropriate).

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Reserved

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses to work as Roll up Door systems technician contractors in the State of Hawaii in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, GOVERNMENT POC and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the KO, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Reserved

1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.

3.2 Materials: None

3.3 Equipment: None

3.4 Services: None

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Reserved

4.3 Contractor Security Clearance: Reserved

5.0 Requirements

5.1 General

The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to conduct a targeted hazardous material survey and furnish a comprehensive report of findings. The objective is to identify the presence, location, and quantity of hazardous materials in the areas specified in this PWS, to ensure safe work practices during future renovation or demolition activities.

5.2 Contractor Qualifications

The contractor shall ensure all personnel conducting survey and sampling activities are State of Hawaii-certified building inspectors and possess all other required licenses and certifications for the work described herein. Copies of all certifications shall be submitted to the GOVERNMENT POC prior to the start of any work.

5.3 Hazardous Material Survey

The contractor shall perform a comprehensive survey to identify and quantify the following hazardous materials:

• Asbestos-Containing Materials (ACM), to include concrete in CMU walls and restrooms

• Lead-Containing Paint (LCP) and Lead-Based Paint (LBP)

• Mold and Moisture Intrusion (including visible mold growth, damp/water-damaged building materials, and airborne mold spore concentrations)

• Polychlorinated Biphenyls (PCBs) in light ballasts, electrical equipment, and other building materials

• Mercury-containing equipment such as fluorescent light tubes, switches, and thermostats

• Resource Conservation and Recovery Act (RCRA) 8 Metals (Arsenic, Barium, Cadmium, Chromium, Lead, Mercury, Selenium, and Silver) for waste characterization

The survey shall include, at a minimum, the following activities:

5.3.1 Visual Inspection and Sampling

• Visual Inspection: Conduct a thorough visual inspection of all accessible areas to identify and map the locations of materials suspected of containing hazardous substances.

• Identification of Homogeneous Materials: Identify and group building materials that are similar in appearance, texture, and color as homogeneous materials for representative sampling.

• Building Material Sampling: Collect representative bulk and/or paint chip samples of all suspect materials in a manner that minimizes the generation of airborne dust. All samples must be collected by certified inspectors.

• Electrical Equipment Inspection: Inspect accessible fluorescent light ballasts for "No PCBs" labels and manufacturing dates. Visually inspect fluorescent light tubes for green end caps to differentiate between conventional and low-mercury lamps. Inspect accessible electrical switches to identify those suspected of containing mercury.

5.3.2 Laboratory Analysis

• The contractor shall be responsible for the analysis of all collected samples at a certified laboratory.

• Asbestos samples shall be analyzed by Polarized Light Microscopy (PLM) using EPA Method 600/R-93/116.

• Lead and heavy metal samples shall be analyzed by Flame Atomic Absorption Spectroscopy (FAAS) using NIOSH or EPA-approved methods.

• PCB samples shall be analyzed using EPA Method 8082A/3550C/3665A.

5.4 Reporting and Documentation

The contractor shall develop and submit a comprehensive Hazardous Material Survey Report, similar in format and detail to the provided examples. The report shall serve as a guide for managing hazardous materials during future construction or renovation. The report must include the following:

• Pre-Work Submittals: Prior to the start of any physical work, the contractor shall submit:

• Work Plan and Schedule: A detailed plan outlining the survey methodology and a project schedule.

• Personnel Certifications: Copies of all required licenses and certifications for personnel involved in the survey.

• Post-Work / Final Report Submittals: The final report shall include:

• Executive Summary: A concise overview of the findings, including a summary table of identified hazardous materials, their locations, and quantities.

• Introduction: A description of the project scope and objectives.

• Sampling and Survey Methods: A detailed explanation of the inspection and sampling methodologies used.

• Laboratory Information: The name and certification of the laboratory used for analysis, along with the analytical methods.

• Results: A detailed presentation of the analytical results for all samples taken.

• Summary of Survey Results: A comprehensive summary of all identified hazardous materials.

• Recommendations for Renovation and Construction Work: Provide guidance for the safe handling and disposal of all identified hazardous materials, in accordance with applicable federal, state, and local regulations.

• Appendices:

• Inspector Certifications

• Sample Location Drawings (vicinity maps and floor plans)

• Photographs of sampled materials

• Complete Laboratory Analytical Reports

5.5 Warranty: Warranty not required for this project.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation Mandatory https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement Mandatory http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Hawaii Administrative Rules Mandatory Code of Federal Regulations Mandatory Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1:

07/01/2025)

Mandatory http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors

(paragraph 9)

August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201 -2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

04/03/2017 (Change 1:

10/29/2020)

Mandatory https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46 09/09/14 (Change 1:

05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/

DoD Investigative and Adjudicative Guidance for Issuing the Common

Access Card (CAC) Homeland Security Presidential

Directive (HSPD)-12 Policy for a Common Identification

Standard for Federal Employees and Contractors

08/27/2004 Mandatory https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and

Civil Liberties Programs

01/05/2021 (Change 1:

04/24/2025)

Mandatory https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy

Program

05/14/2007 Mandatory https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01 Cyberspace Workforce Management

02/15/2023 Mandatory https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M Information Assurance Workforce

Improvement Program

12/19/2005 (Change 4:

11/10/2015)

DoD 5220.22-M National Industrial Security Program Operating Manual (Now part 117 of

Title 32 CFR)

AFI 10-245

Antiterrorism

03/28/2013 (Certified current

03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and

Procedures

08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures

03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFPD 17-1

Information Dominance Governance and Management

04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID=1&series =-1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019 (Change 1:

06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security

Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm

DD 250

Material Inspection and Receiving

Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/ http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective / Task

PWS

Section

Performance Standard Acceptable Quality Level (AQL)

Method of Surveillance

1. Contractor Qualifications & Pre-Work Submittals Provide Work Plan, schedule, and all required personnel/lab certifications prior to fieldwork.

5.2, 5.4 Submit valid State of Hawaii inspector certifications, DoD ELAP and AIHA LAP laboratory accreditations, and a detailed work plan prior to commencing any physical work.

100% Compliance.

No work shall begin until all required certifications and submittals are reviewed and approved by the

GOVERNMENT

POC.

100% Inspection of pre-work submittal package by

GOVERNMENT

POC.

2. Field Survey, Inspection, & Sampling Execution Conduct site surveys for ACM, LBP, PCBs, Mercury, RCRA 8 Metals, and Mold.

5.3, 5.3.1

Perform visual inspections, moisture assessments, and representative sampling (bulk, paint chip, air, surface) safely, minimizing airborne dust and adhering to the approved Work Plan.

Zero (0) safety or environmental violations. Max 1 validated customer complaint regarding site cleanliness or unauthorized damage.

Periodic Field Observation / Random Inspection by

GOVERNMENT

POC during fieldwork.

3. Laboratory Analysis Perform analysis of all collected samples.

5.3.2 Utilize strictly DoD ELAP

accredited labs for chemicals/metals and AIHA LAP accredited labs for mold. Ensure required analytical methods (e.g., EPA 600, TCLP EPA

1311/6010, etc.) are strictly followed.

100% Compliance.

Use of unaccredited labs or unapproved methods will result in rejection of results at the contractor's expense.

100% Inspection of Chain of Custody (CoC) forms and final Laboratory Analytical Reports.

4. Final Hazardous Material & Mold Survey Report Develop and submit the final comprehensive report.

5.4 Report must accurately

document all findings, locations, quantities, TCLP waste characterization results, and provide clear recommendations for safe handling during future renovation/demolition.

Submitted by the required deadline.

Maximum of one (1) revision required by the government due to contractor errors, omissions, or formatting issues.

100% Review of Draft and Final Reports by

GOVERNMENT

POC/Technical Subject Matter Experts.

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.2 For

Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.

Provide a DBIDS package for each personnel who needs access to a DoD Installation at least 30 calendar days before the start of the project

1 Electronic Submission

GOVERNMENT

POC

1.4.5.3 AT Level 1

Awareness Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

GOVERNMENT

POC

1.4.5.11 OPSEC

Training Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

GOVERNMENT

POC

1.4.10 Identification

Media

Return within 14 days of employee’s departure from contract performance.

Original(s) Hard Copy KO

5.5 - Installation Plan & Schedule

Provide within 15 calendar days after contract award.

1 Electronic Submission

GOVERNMENT

POC

5.5 - Material Submittals

Provide within 30 calendar days after contract award.

1 Electronic Submission

GOVERNMENT

POC

5.5 - Preventive Maintenance (PM)

Schedule

Provide no later than 30 days after the inspection

1 Electronic Submission

GOVERNMENT

POC

5.5 - Operations & Maintenance (O&M)

Manuals

Provide no later than 30 days after the inspection

1 Electronic Submission

GOVERNMENT

POC

5.5 - Drawings (if any)

Provide no later than 30 days after the inspection

1 Electronic Submission

GOVERNMENT

POC

5.5 - Discrepancy Cost Estimate

Provide no later than 30 days after the inspection

1 Electronic Submission

GOVERNMENT

POC

1.4.5.1. Reserved