About this file
This document contains a Performance Work Statement (PWS) for a federal contract opportunity to perform Nondestructive testing (NDT) on the Cooling Water Piping for Buildings 430, 433, and 435 at Buckley Space Force Base in Colorado. The purpose is to determine the extent of internal pipe degradation.
The PWS outlines the scope of work, which includes visual inspection and NDT testing of the piping, marking test locations, and providing an inspection report. The contractor must hold NDT Level II or III certifications and perform the work during normal business hours, Monday through Friday, excluding federal holidays. The contractor must obtain appropriate base access for employees and vehicles. The related federal contract opportunity is a Request for Quote (RFQ) solicitation issued by the Department of the Air Force Space Command, which requires a capabilities statement, quote, confirmation of required deliverables and certifications, and other standard proposal information. The contract award is set for 30 days after receipt of order, with a site visit scheduled for July 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Attach 1 - Pictures All.pdf | ||
| PWS B430 Pipe Survey - 1 August 2024.pdf | ||
| QandAs for - FA254324Q0031 B430 Pipe Survey 1 Aug24.pdf | ||
| Conformed Solicitation - FA254324Q00310002 B430 Pipe Survey.pdf | ||
| Solicitation - FA254324Q0031 B430 Pipe Survey.pdf | ||
| 430_433 CW Distribution Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUCKLEY SPACE FORCE BASE (BSFB)
PERFORMANCE WORK STATEMENT (PWS)
Building 430, 433, 435 Pipe Survey Space Base Delta 2
Buckley SFB CO 80011 11 July 2024
1. Introduction and Overview A requirement exists for a survey of Building 430, 433, and 435 Cooling Water Piping at Space Base Delta 2. The purpose of this requirement is to perform a Nondestructive testing (NDT) on the Cooling Water Piping for Buildings 430, 433, and 435 to determine the extent of the internal degradation.
1.1. Background
Large amounts of metal rust flakes have been found lodged in Cooling Towers, Chillers, and Generators that support these buildings. This is indicative of pipe wall thinning brought on by heavy internal corrosion, which the government was made aware of in February 2024. The piping was installed in 1971 and the government does not have Isometric Drawings or the piping system mapped. A limited number of drawings are available. Pictures are included to provide a degree of magnitude; see PWS pages 3 – 9.
The piping consists of insulated sections connected to the Cooling Towers outside, sections underneath grating in the Power Plant that go to the Generators and Chillers, and sections overhead in the Mechanical Room. The piping is approximately 10 inches in diameter for the insulated sections and 8 inches or less for the non-insulated sections. The total length of the piping is approximately 568 feet.
2. Scope Details
a. Test procedure will be determined by the contractor.
b. The contractor performing the survey will mark their survey location with an identifier for future testing.
c. The Contractor performing the pipe survey will hold NDT Level II or III
Certifications.
d. The Contractor will perform a visual inspection of all accessible pipe surfaces outside Building 433, sections underneath the grating inside Building 433, and overhead sections in the Building 430 Mechanical Room.
e. Piping test points will be cleaned in the most mild manner possible.
f. The Contractor will perform Nondestructive testing (NDT) around the full circumference of the piping at various locations.
g. Water must remain flowing in the piping throughout all phases of the inspection.
h. The Contractor will provide the Project Manager with a copy of the
Inspection Report, to include findings, Inspection Data, Calculations (if required), and Photographs.
3. Work Hours
The contractor must be accessible by telephone during business hours (7:30 AM
– 4:30 PM MDT) to respond to questions and unforeseen circumstances that may arise. Contractors may not be accessible by phone when in the RA.
The contractor shall perform the work as defined in this performance work statement during the hours of 7:30 AM – 4:30 PM MDT on weekdays, excluding federal holidays and Air Force family days. If a federal holiday falls on Sunday, it will be recognized on Monday with a Family Day on the Tuesday following. If a federal holiday falls on Saturday, it will be recognized on Friday with a family day on the Thursday prior. If the federal holiday falls on Monday, the family day will likely be the Friday prior.
4. Base Access The Contractor shall obtain appropriate Base access for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto BSFB. Current vehicle registration, current proof of insurance and a valid driver’s license must be presented for all vehicles to be registered. Two valid forms of photo ID are required for RA access. Base access requests must be submitted to the government at least 5 days prior.
5. Contractor Registration Contractors are required to invoice through the Wide Area Work Flow (WAWF) System at https://wawf.eb.mil. More information regarding WAWF will be provided upon contract award. The contractor must have current registration though System of Award Management (SAM), www.SAM.gov.
6. Delivery Delivery and installation shall be no later than 30 days after receipt of award.
Service location is at Buckley Space Force Base, CO 80011 and a specific location will be provided upon award.
Cooling Tower Above Ground Piping #1
Cooling Tower Above Ground Piping #2
B433 Piping Split
B433 Cooling Water Piping Wall Penetration
B433 Generator Piping #1
B433 Generator Piping #2
B433 Chiller Piping Access
B433 Chiller Piping #1
B430 Mechanical Rm Chiller Inlet/Outlet Piping
B433 Chiller Piping #2
B430 Mechanical Rm Chiller Piping #2
B430 Mechanical Rm Chiller Piping #1
B430 Mechanical Rm Chiller Overhead Piping
| BUCKLEY SPACE FORCE BASE (BSFB) |
| PERFORMANCE WORK STATEMENT (PWS) |
| Building 430, 433, 435 Pipe Survey |
| Space Base Delta 2 |
| Buckley SFB CO 80011 |
File details come from the government source that posted it. Updated .