Solicitation Attach 1 - Pictures All.pdf
PDF 5 MB Posted
- Attached to
- Nondestructive testing (NDT) - B430 Pipe Survey Federal contract opportunity
- Solicitation number
- FA254324Q0031
About this file
This document is a Solicitation for a Request for Quote (RFQ) from the U.S. Air Force 460th Contracting Squadron at Buckley Space Force Base, CO for Nondestructive testing (NDT) on the Cooling Water Piping for Buildings 430, 433, and 435 to determine the extent of internal degradation.
The key details are: the requirement is a 100% Small Business Set-Aside; a site visit will be held on July 19, 2023 with RSVP required by July 16, 2024; questions are due by July 23, 2024 and responses by July 29, 2024; the contractor must provide a capabilities statement, quote, and confirmation of meeting the requirements in the Statement of Objectives (SOO), including required certifications; the service must be completed within 30 days of award. The solicitation provides details on submission requirements and contracting provisions that will apply.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS B430 Pipe Survey - 1 August 2024.pdf | ||
| QandAs for - FA254324Q0031 B430 Pipe Survey 1 Aug24.pdf | ||
| Conformed Solicitation - FA254324Q00310002 B430 Pipe Survey.pdf | ||
| Solicitation - FA254324Q0031 B430 Pipe Survey.pdf | ||
| PWS for B430 Pipe Survey 11 July 2024.pdf | ||
| 430_433 CW Distribution Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COOLING TOWER PICTURES July 2024
METAL FLAKES PICTURES APRIL 2024
Cooling Tower Above Ground Piping #1
Cooling Tower Above Ground Piping #2
B433 Piping Split
B433 Cooling Water Piping Wall Penetration
B433 Generator Piping #1
B433 Generator Piping #2
B433 Chiller Piping Access
B433 Chiller Piping #1
B430 Mechanical Rm Chiller Inlet/Outlet Piping
B433 Chiller Piping #2
B430 Mechanical Rm Chiller Piping #2
B430 Mechanical Rm Chiller Piping #1
B430 Mechanical Rm Chiller Overhead Piping
File details come from the government source that posted it. Updated .