This Performance Work Statement (PWS) details a construction project for the 126th Air Refueling Wing at Scott Air Force Base, Illinois. The project involves constructing four new reserved parking spaces and upgrading handicap parking and accessibility features. Specific requirements include:
Base Bid (CLIN 001) involves creating four new parking spaces with detailed specifications for site preparation, asphalt layering, and concrete sidewalk installation. CLIN 002 focuses on handicap parking, including striping five ADA-compliant parking spots in the roundabout and reconfiguring the building 5000 ramp to meet ADA requirements. Additional scope includes replacing door hardware with automatic door openers and installing push button controls. The project requires strict adherence to UFC, NFPA, NEC, and other local and federal regulations, with work to be completed during standard 8-hour workdays, Monday through Friday, with potential weekend power outage work. The contracting point of contact is MSgt Benjamin James from the 126th Contracting Office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VDYD252001 RFI Clarification.pdf | ||
| RFI 2.pdf | ||
| RFI Version 1.pdf | ||
| Site Visit MFR.pdf | ||
| Site Visit Sign_Redacted.pdf | ||
| Solicitation - W50S7S25QA001.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
CONSTRUCT, Headquarters Parking Lot B5000
VDYD 252001
SCOTT AIR FORCE BASE, ILLINOIS
5 February 2025
1. REQUIREMENT:
a. BACKGROUND: The 126ARW Headquarters parking lot requires additional stalls to accommodate reserved leadership parking and handicap parking. The new parking area for wing leadership shall be asphalt with associated curbing and paint striping. The parking area will also have an ADA compliant concrete sidewalk.
b. OBJECTIVES: This objective of this project is to construct a durable and well-marked parking area that meets all applicable codes and standards while providing safe and efficient access for vehicles and pedestrians, painting five ADA compliant handicap accessible spaces in the roundabout and reconfiguring the ramp to Building 5000 to be ADA compliant.
c. PROJECT LOCATION: All work will be at the 126th Air Refueling Wing, Building 5000, Scott AFB, Illinois.
2. PROJECT ADMINISTRATION:
a. SITE VISIT: Contractor is responsible to verify all measurements and conditions pre-bid.
The Government intends to only hold one official site visit. Requests for additional site access must go through the 126th Contracting Squadron (126 CONS) point of contact (POC) listed in the Request for Proposal (RFP) letter. Any additional site access will be made available to all Contractors solicited for this project.
b. MEETINGS
i. Kick-Off Meeting/Project Schedule – Kick-off meeting to occur within one week of NTP. Overall project schedule with milestone markers and 2-week look-ahead to be completed at kick-off meeting.
ii. Contractor shall coordinate with the 126th Contracting Squadron (126 CONS) on bi-weekly meetings once the construction phase begins. This meeting shall include the review of an updated 2-week look ahead schedule. Contractor shall provide meeting minutes within 24 hours of each meeting and allow the Government up to 24 hours to accept or request changes to the minutes.
3. PROJECT SCOPE:
a. BASE BID (CLIN 001): Construct Four New Parking Spaces
i. Conduct site inspection to verify site conditions. Contractor to coordinate all utility locates and dig permits.
ii. Contractor shall remove existing 4” thick concrete sidewalk, brick wall, and curbing to clear space for the new parking spots.
iii. Contractor will excavate and grade the site to ensure proper drainage and compact as necessary.
iv. Add and compact 8” aggregate base course. Perform proof rolling to identify and address any weak areas.
v. Apply a prime coat to ensure a strong bond between the aggregate base and asphalt.
The prime coat should be even in appearance and must be verbally approved by the contracting officer representative prior to paving the asphalt base layer.
vi. Install an asphalt base layer that is at least 2” thick after rolling to ensure compactness and smoothness. Allow the asphalt layer to cure for 24-48 hours.
vii. Apply a tack coat on top of the asphalt base layer.
viii. Install an Asphalt Surface Course that is at least 1.5” thick and ensure proper compaction and smoothness.
ix. Apply joint sealant at the butt joint connecting the old and new asphalt.
x. Contractor shall add a 42’ x 4’ concrete sidewalk connecting the existing sidewalk and adjoining the new parking spaces as seen in Figure 1. The concrete shall be 4” thick with a compacted base course that is at least 4” thick.
(1) Concrete will be brush finished with a finished edge and contraction joints to match the existing sidewalks. Contraction joints may be saw cut after the concrete has cured sufficiently to prevent chipping or done with a concrete groover prior to the concrete curing.
(2) Sidewalk will have an ADA compliant ramp connecting the sidewalk to the asphalt as seen in figure 1.
(3) Contractor shall pour new curbing to connect the existing curb to the sidewalk on the north side of the new parking spots and a new 20’ parking curb on the south side of the parking spots as seen in figure 1.
xi. Contractor shall paint the curb for each parking space in blue with white lettering to designate reserved parking for:
(1) Reserved 126ARW/CC
(2) Reserved 126ARW/CV
(3) Reserved 126ARW/CC GOV
(4) Reserved 126MSG/CC
xii. Contractor shall paint 4” width yellow parking lines to define the four parking spots. Each spot shall be 10’ wide and 20’ deep.
xiii. Contractor shall repair any ruts in the construction area with clean topsoil and replant disturbed grassy areas with IDOT seed mix class 1B with mulch method 2.
Figure 1: New Asphalt Parking Layout
b. CLIN 002: Handicap Parking and ADA Ramp
i. Contractor shall use blue paint to stripe the roundabout in front of building 5000 to allow for 5 ADA compliant handicap parking spots. Each spot will be marked with a sign mounted in concrete indicating that the spot is handicap accessible and van accessible. Parking spots shall not block the sidewalk, and all spots will be visually marked (chalk lines, tape, etc.) and receive approval from the COR and/or contracting officer prior to painting.
Figure 2: Handicap Sign Requirements
(1) Each parking spot will be marked with on the ground with a painted handicap parking symbol with a minimum size of 28” x 24”.
ii. The ramp to building 5000 does not meet ADA requirement. Ramp is to be reconfigured as to meet the ADA requirements.
(1) Any demolition of non-compliant pavements is to be confirmed by the contractor prior to work start. New concrete shall be doweled/tied into the existing slab to ensure slab stability if existing pavements are to remain.
(2) The required width of the new ramp shall meet the ADA requirement to be 48” with a maximum slope of 1:12.
(3) New concrete ramp shall be a minimum thickness of 4” with a minimum aggregate subbase of 4”. Concrete shall be broom finished with finished edges and regularly spaced contraction joints. Contraction joints may be saw cut after the concrete has cured sufficiently to prevent chipping or done with a concrete groover prior to the concrete curing.
(4) Handrails shall be installed 34-38 inches above the ramp surface and shall extend the full length of the ramp.
(5) All landing zones must meet the ADA minimum size requirement of 5’ x 5’.
iii. The main entry doors to Headquarters, Building 5000, do not have a handicap accessible automatic door with push buttons.
(1) Replace the door hardware of one (1) exterior door and one (1) interior door with an automatic door opener.
(a) Contractor responsible for determining how to tie in the door hardware to commercial power. Contractor plan to pull power from the mechanical room or nearby power circuit is subject to approval by the COR and base electrician.
(2) Install one (1) manual push button control for the door in the Headquarters lobby, one (1) inside the vestibule, and one (1) manual push button control outside of the building mounted on a steel pedestal.
(a) Controls must be located outside the door swing to prevent users from getting hit by the door.
(b) Operation of the doors: Both powered doors shall open from the press of either button.
4. DELIVERABLES: Contractor shall provide all material submittals to the contracting office for review using the Air Force Form 3000 (AF3000).
5. SCHEDULE:
a. Performance period: The period of performance (PoP) for this project shall be proposed by the contractor and negotiated with the government from the date that Notice to Proceed (NTP) is issued. All work must be scheduled to be complete within this timeframe. Any modifications or extensions must be requested through the 126th Civil Engineer Squadron (126 CES) and the Contracting Officer for review and discussion. Contractor must provide construction milestones to 126 CES and the Contracting Officer.
b. Prior to beginning construction, Contractor shall provide to the CO and 126 CES construction milestones in sufficient detail to accurately identify all phases/disciplines of work to be performed.
c. Contractor shall provide general construction schedule, showing, at a minimum, the critical path items.
d. Contractor will be required to provide 2-week look ahead at each meeting described above.
e. Construction may be authorized by the Contracting Officer upon acceptance and approval of the schedule and equipment/material submittal approvals.
6. SPECIFICATIONS:
a. All work performed shall comply with all applicable UFC, NFPA, NEC and other local and federal regulations and code. This includes but is not limited to:
i. Unified Facilities Criteria (UFC) 1-200-01 General Building Requirements
ii. UFC 3-250-01 Pavement Design for Roads and Parking Areas
iii. Air Force Corporate Facilities Standards
iv. UFC 3-120-01 Design Sign Standards
v. Scott Air force Base Architectural Compatibility Guidelines
7. GENERAL CONDITIONS:
a. An alternate method can be proposed for any of the above tasks and will be reviewed.
Any alternate methods or deviations from the requested work shall be called out or highlighted in the Contractor’s proposal in a manner that is clearly identifiable. Any approved alternate methods will result in a SOW modification prior to the commencement of work. The Government will assume any additional design or construction costs associated with the approved alternatives but will not assume any costs associated with the Contractor processing this required modification.
b. A phased approach is to be used in the construction of these projects to minimize disruptions.
c. Contractor must ensure that all accesses to the building be left clear of construction materials when not on the worksite. Ensure material/tools/equipment do not hamper operations during operating hours.
d. Contractor shall supply any dumpsters required to properly dispose of any construction materials.
e. Contractor shall coordinate with CE for enter/exit points to access job site, for this facility. Contractor to coordinate with CE for location of dumpster.
f. Contractor shall site verify all dimensions and/or existing site conditions prior to the commencement of work. Commencement of work shall begin within ten (10) calendar days upon the receipt of the NTP issued by the Contracting Officer.
g. Contractor shall be completed within the agreed upon PoP as stated within the contract issued by the Contracting Officer.
h. Contractor shall be required to apply for and submit to the Contracting Officer an AF Form 103, Work Clearance Request, for all work to be accomplished under this delivery order five (5) days prior to the commencement of work. The AF Form 103 can be obtained from and approved by 126CES.
i. Contractor shall brief all Sub-Contractors on all safety and fire prevention regulations, emphasizing the requirement to obtain a daily AF Form 592, Welding, Cutting, and Brazing Permit, when welding, cutting, or brazing operations are to occur under this delivery order. The AF Form 592 can be obtained from and approved by 126CES.
j. Contractor shall complete and submit the appropriate DD Form 1354, Transfer and Acceptance of DoD Real Property to the 126CES for records. The DD Form 1354 can be obtained from 126 CES.
k. Contractor shall provide an inventory, utilizing Microsoft Excel, of all removed systems to ASTM-E1557-09 Uniformat II, Level 4 system detail. Detail data includes Facility Number, ID Number (if available); Equipment Type; Equipment Make;
Serial Number; Model; Capacity; Manufacturer; and Location. Contractor shall provide the government two copies of CD/DVD media with an electronic copy of the removed systems inventory as part of the final close out document package.
l. Contractor shall provide an inventory, utilizing Microsoft Excel, of newly installed systems to ASTM-E1557-09 Uniformat II, Level 4 system detail. Since section detail data can be recorded for equipment and non-equipment section types, some of the data elements may not apply to component-sections. The Contractor must provide section detail data for those data elements that do apply (see Attachment 4).
i. Section detail data includes Facility Number; Level 2 Group Element (System) Description; Level 3 Individual Element (Component) Description; Level 4 Sub-Element (Section) Description; Sub-Element Description; Equipment Type; Equipment Make; Serial Number; Model; Capacity; Manufacturer;
Warranty Company; Warranty Expiration Date; Location; Date Manufactured; Control Type/Make and Year Installed.
ii. Contractor shall provide the government two copies of CD/DVD media with an electronic copy of the installed systems inventory as part of the final close out document package.
m. Contractor shall provide an electronic draft copy of the installed systems inventory for review and issuance of the applicable inventory ID Number and bar-code labels at least 30 days prior to O&M handover walk-through (conducted prior to contract close out).
n. Contractor shall, during construction, keep an accurate electronic record of as-built conditions, all variations from the contract drawings (that have been approved by the contracting officer or COR in writing in advance of any such variations - including those made because of the selection of optional materials), shall be clearly indicated.
These variations shall be shown in the same general detail utilized in the initial contract drawings. The as-built drawings shall be maintained in a current condition during construction. The as-built drawings shall be furnished to the Contracting Officer and 126 CES not later than ten workdays after the final inspection date. As part of the as-built drawings a separate set of plans shall be marked-up showing areas found/known to contain asbestos.
o. Contractor shall install bar-code labels on all newly installed systems, as required.
Bar-code labels must match applicable component-sections standardized on the Base.
p. All documents related to the disposal of hazardous material must be supplied to 375 CONS and 126 CES. The Contractor must obtain the proper documents from 126 CES to ensure all materials leaving Scott Air Force Base can be tracked and accounted for, in accordance with all governing laws.
q. Under the 1992 Clean Air Act, all products used in executing this project must not be related to the Class I Ozone Depleting Chemicals (ODCs) identified in Air Force Policy. The following products are considered Class I ODCs: CFC-11, CFC-12, CFC- 113, CFC-114, CFC-115, Halon 1211, Halon 1301, Halon 2402, CFC-13, CFC-111, CFC-112, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, CFC-217, Carbon tetrachloride, and Methyl Chloroform.
r. Respondents are encouraged to prioritize the utilization of utility company energy savings incentives as a key funding mechanism for the implementation of proposed projects. These incentives should be thoroughly explored and integrated into the proposed plan to maximize cost-effectiveness and ensure alignment with energy savings measures. Demonstrating a proactive approach to leveraging these incentives will be viewed favorably during the evaluation process.
s. The awardee of this solicitation will need to determine if any components of this project are eligible for the local utility companies' energy efficiency rebate/incentive program. The awardee will be responsible for preparing and submitting the application to the utilities program. New Construction/Custom applications require a preapproval from the local utility's energy efficiency program prior to placing an order for material with a vendor. The awardee is responsible for the general rules and requirements of the local utility's EE application.
t. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
u. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (DODIO 2000.16V1_DAFI 31-145, DAFI 31-101 and DODM 5200.08v3_DAFMAN 31- 101v3), applicable installation, facility andarea commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
v. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilitiesand controlled access areas shall complete AT Level I training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf. For those without a CAC, select"Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.
8. FIELD CONDITIONS:
The Contractor shall be responsible for all field measurements to accomplish work.
Quantity and sizes of materials shall be determined from site visits and drawings. The Contractor shall carefully examine the entire site and building and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents.
9. ACCOMPLISHMENT OF WORK:
The work areas of the existing building will be in occupied and unoccupied areas. The Contractor must ensure that all access to the existing building always remains clear for occupants and emergency access during the construction period. All temporary closures, barriers, and protective procedures shall be coordinated with the Contracting Officer. All work shall be accomplished during the standard 8-hour day, 5-day week, Monday through Friday, between the hours of 7:30 A.M. and 4:30 P.M. local time, excluding Federal Legal holidays and nonwork days resulting from holidays occurring on weekends.
However, power outages shall be accomplished on weekends or 126ARW down days (calendar provided). The 126ARW has a compressed schedule and does have roughly two down days per month, typically on Fridays. Please reference the 126ARW calendar to coordinate the construction schedule to not work on scheduled down days unless required.
10. WORK CONDITIONS:
The Contractor shall coordinate work with the Contracting Officer, in conjunction with the User and 126 CES. The Contractor shall notify the Contracting Officer or the 126 CES inspection representative the day before he/she moves onto the work site to commence work.
The Contractor shall again provide notification the day he moves back to the work site after an interruption of work of two or more days in duration. The Contractor shall also provide an original work schedule and updates if required. This schedule shall describe major work items and projected completion dates.
11. PROTECTION OF BUILDING PROPERTY:
The Contractor shall protect from damage all building property located in or adjacent to the building and shall repair, replace, or otherwise be held liable for all such damage. Building properties include but are not limited to, furniture, vehicles, or items of supplies. Exercise control measures of all dust and toxic fumes associated with construction operations, to prevent hazards or illness to base and Contractor personnel.
12. CLEANUP:
The Contractor shall cleanup each work site at the end of each workday to the satisfaction of the Contracting Officer. Upon completion of the work, all construction equipment and debris shall be removed from the site and the area shall be left in a neat and completely acceptable condition as required by the General Provisions. Contractor must always recycle materials, such as, but not limited to cardboard and paper. The Contractor will use whatever means necessary to store all recyclable materials and is responsible for turning in recyclable materials to the Base Recycling Center.
13. PATCHING AND REPAIRING:
After the work has been completed, holes, cuts, and damages made in the finished surfaces of the work site and adjacent areas shall be properly repaired and restored to match the existing finishes. Any abrasion or disfigurement of the finish work or any portion of the building where any such abrasion or disfigurement is caused by the activities of the Contractor shall be repaired and neatly refinished to match the adjacent work to the satisfaction of the Contracting Officer. Contractor shall maintain integrity of all fire walls/barriers.
14. PRODUCTS:
All products shall conform to their respective manufacturing and performance publications.
All materials and equipment used in the work area shall be the products of manufacturers regularly engaged in the manufacture of construction products.
15. SUBMITTALS:
The Contractor shall submit for approval all items as required by other parts of these specifications. The Contracting Officer may request submittals in addition to those required by the other parts of this Statement of Work when deemed necessary to adequately describe the work. Submittals shall be made to the Contracting Officer in five (5) copies using AF Form 3000, Material Approval Submittal. In general, submittals shall be provided a minimum of thirty (30) calendar days in advance of scheduled installation to allow satisfactory time for Government review. Additionally, unless stated otherwise submissions on test results and other submissions of a similar nature shall be made within fourteen (14) calendar days after the work or test is performed. Each submittal shall be complete and in sufficient detail for ready determination of compliance with contract requirements.
Submittals shall include such items as Contractor’s or manufacturer’s shop drawings, descriptive literature, catalog cuts, samples, certifications, installation procedures and recommendations, templates, and other descriptive literature as may be required by the Contracting Officer. Catalog cuts and other descriptive data which may have more than one model or type shall be clearly marked to show the model, type, size, and all optional or accessory equipment the Contractor proposes to install. Submittals on component items forming a system or interrelated items shall be submitted at one time as a single submittal to demonstrate that the items have been properly coordinated and will function as a unit.
Approval of submittals will not relieve the Contractor of compliance with the project drawings and specifications. Submittal items that are disapproved will be promptly corrected and resubmitted by the Contractor. No materials shall be installed until submittals are approved by the Contracting Officer. All submittals involving color selections, patterns, and other decorative architectural features shall be submitted at the same time for both interior and exterior materials.
16. SPECIFICATIONS:
Work shall be performed in strict accordance with these contract general specifications, as well as all applicable local, state, and national Building and Life Safety Codes, American Society for Testing and Materials (ASTM) specifications. Safety plans and procedures issues must adhere to all applicable Occupational Safety and Health Act (OSHA) regulations.
17. PROJECT POINTS OF CONTACT:
The project points of contact for this project are:
Contracting Specialist/Officer MSgt Benjamin James 126th Contracting Office P: 618-222-5112 Email: benjamin.james.1@us.af.mil mailto:benjamin.james.1@us.af.mil
| 1. REQUIREMENT: |
| 2. PROJECT ADMINISTRATION: |
| 3. PROJECT SCOPE: |
| a. BASE BID (CLIN 001): Construct Four New Parking Spaces |
| 5. SCHEDULE: |
| 6. SPECIFICATIONS: |
| 7. GENERAL CONDITIONS: |
| i. Section detail data includes Facility Number; Level 2 Group Element (System) Description; Level 3 Individual Element (Component) Description; Level 4 Sub-Element (Section) Description; Sub-Element Description; Equipment Type; Equipment Make; Serial... |
| 8. FIELD CONDITIONS: |
| 9. ACCOMPLISHMENT OF WORK: |
| 10. WORK CONDITIONS: |
| 11. PROTECTION OF BUILDING PROPERTY: |
| 12. CLEANUP: |
| 13. PATCHING AND REPAIRING: |
| 14. PRODUCTS: |
| 15. SUBMITTALS: |
| 16. SPECIFICATIONS: |
| 17. PROJECT POINTS OF CONTACT: |
| Contracting Specialist/Officer |
File details come from the government source that posted it. Updated .