PWS DDG 51.pdf
PDF 392 KB Posted
- Attached to
- DDG 51 High-Efficiency Propeller Design Report
- Solicitation number
- N00167-26-SIMACQ-CD-87-0004
About this file
This is a Performance Work Statement (PWS) for the DDG 51 High-Efficiency Propeller 2026, issued by the Naval Surface Warfare Center, Carderock Division (NSWC CD). The procurement requires the contractor to conduct a structural assessment of an 18-foot diameter propeller developed by NSWC CD to determine compatibility with the existing DDG 51 Class propeller hub. The contractor must deliver two primary deliverables within specified timeframes: a structural assessment report containing finite element analyses evaluating the performance of the current 156-centimeter controllable pitch propeller hub under the new 18-foot blade design (CDRL A001, due 120 days after award), and a cost and schedule estimate for manufacturing a ship-set of propeller blades (CDRL A002, due 90 days after award). The analyses must evaluate two operational conditions—full power ahead and full power turn—and include comparative assessments against existing DDG 51 designs, evaluation of impacts to blade bolts and hub components, and recommendations for potential design modifications.
The Bird-Johnson Company is identified as the sole vendor capable of performing this structural analysis due to its proprietary hub design. The period of performance extends from day of award through 120 days after award. Government-furnished information includes the 2026 18-foot blade geometry in IGES format, hydrodynamic loads, and unsteady force tables. Security requirements specify that all government-furnished information will be controlled unclassified information, Distribution D, Critical Technology. The procurement assumes a 2028 contract award and requires the contractor to address integration into current production schedules and identify risk factors affecting cost and schedule estimates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SSJ DDG 51_Redacted.pdf | ||
| RFO FAR 12 Presolicitation Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
DDG 51 High-Efficiency Propeller 2026
1.0 DESCRIPTION OF SERVICES/INTRODUCTION: The Naval Surface Warfare Center, Carderock Division (NSWC CD) has developed an 18-foot diameter propeller that may provide improved fuel efficiency for the DDG 51 Class of ships. The 18-foot propeller is comprised of multiple blades that are mounted to an existing hub. Implementation of the 18-foot propeller will require validation that the existing DDG propeller hub is compatible with the loads generated by the new propeller.
Additionally, a cost and schedule estimate for the drawing, engineering support and manufacture of a ship-set of blades of this design is being requested.
2.0 BACKGROUND: The DDG 51 class currently uses two 17-foot propeller designs (Flight I and ATD). A larger 18-foot propeller has been developed by NSWC CD to provide more efficient fuel operation of the DDGs. For cost effective implementation, the 18-foot propeller blades need to be mounted to the existing propeller hub, as replacing the existing hub would be cost prohibitive.
Analysis is required to verify the existing propeller hub is compatible with the loading conditions an 18-foot propeller would impose on the hub. The hubs used on the DDG 51 class are a proprietary design of the Bird-Johnson Company, making them the only vendor capable of performing this structural analysis.
3.0 OBJECTIVE:
3.1 The contractor shall provide:
• A structural assessment report containing finite element analyses to evaluate the structural performance of the current 156cm controllable pitch propeller hub with the notional 18-foot diameter DDG 51 propeller blade (Mod A) developed by NSWCCD in accordance to NAVSEA guidance [see 5.1]. Analyses conducted shall include the effect of unsteady forces for the following two conditions: (CDRL A001) o Full power ahead o Full power turn
The report shall include the following:
o Documentation of comparative analytical assessment for the 18-foot Mod A to
2025 results for DDG 51 ATD and the 2024 DDG 51 18-foot design generated by Rolls Royce Naval Marine.
o Evaluation and assessment of potential impacts to the design/ specification of blade bolts, crank pin rings and hub structural components o Recommendation for potential propeller blade design modifications that may reduce stresses in critical areas or improve fatigue life
3.2 The contractor shall provide:
• A cost and schedule estimate for the engineering efforts that would be required to manufacture a ship-set of either the 2024 18-foot design, or the 2026 18-foot Mod A design. The costs and schedule will include elements involved in Modeling, Drawing creation, Pattern procurement, Casting, Machining, Gages, Inspection, Shipping, and Installation support. This plan should assume a 2028 contract award and address how this contract could be integrated into their current production schedule. Risk factors in terms of the cost and schedule should be identified. (CDRL A002)
4.0 SPECIAL QUALIFICATIONS: Not applicable.
5.0 APPLICABLE DOCUMENTS
5.1 [List all documents reference under section 3.0 in chart below]
Document Type
No./Version Title Date
T9070-AY-
DPC-010/245-
0 Design Data Sheet, Department of the Navy, Naval Sea Systems Command, Controllable Pitch Propellers with Bolted on Blades
1 March
6.0 GOVERNMENT FURNISHED EQUIPMENT/PROPERTY/INFORMATION (GFI) (CDRL A003)
6.1 Surface Geometry of the 2026 18-foot Blade Geometry Mod A in IGES or vendor preferred format
6.2 Loads to be applied to the 18-foot Mod A blades for the identified loading cases as tables of point loads and application points
Inputs to the analyses to be furnished by NSWCCD include:
o Hydrodynamic blade surface geometry definition suitable to build 3D finite element model that will adequately represent weight, inertia and center of gravity o Tables of unsteady forces and moments for a single blade for each of the conditions above
7.0 DELIVERABLES: The contractor shall provide deliverables as described in the PWS/SOW and CDRLs.
Format and delivery schedule for deliverables will be outlines in the CDRLs.
CDRL No. NAME TITLE DESCRIPTION DATE DUE
A001 DI-ATTS-81272 Inherent Testability Design & assessment Report
DDG-51 18-Foot Mod A Final Feasibility Technical Report
920612 120 Days after award
A002 DI-FNCL-80448 Life Cycle Cost (LCC) and Independent Schedule
Assessment (ISA) report
Cost and Schedule Manufacturing Estimate
870930 90 Days after award
A003 MGMT-2020-012 Government Property Inventory Government Property (GP) Inventory Report
20200609
8.0 SECURITY REQUIREMENTS:
GFI will be controlled unclassified information, Distribution D, Critical Technology.
9.0 PERIOD OF PERFORMANCE/PLACE OF PERFORMANCE
Day of Award – 120 Days after Award
Government POC: *To be provided upon award.