This is a historical utilities maintenance data attachment showing service call quantities and work order history for facilities at Liberty Island and Ellis Island. The document provides maintenance data across two key areas:
Service call history shows a generally increasing trend from 2020-2024, ranging from 3,431 to 3,795 annual calls, with a projected decrease to 2,397 calls in 2024-2025. The work order history details 12 specific maintenance projects from 2020-2023 totaling $564,159.82, with projects ranging from $4,055 to $401,976.14. Major work included smoke detector installations, boiler repairs, hot water system maintenance, sewer line repairs, and generator control panel work. The largest single expense was $401,976.14 for main sewer line and manhole repair/relining in November 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_Attch_S009_1.pdf | ||
| PWS_Attch_S017_1.pdf | ||
| PWS_Attch_S012_1.pdf | ||
| PWS_Attch_S005_1.pdf | ||
| PWS_Attch_S015_1.pdf | ||
| PWS_Attch_S011_1.pdf | ||
| PWS_Attch_S007_1.pdf | ||
| PWS_Attch_S003_1.pdf | ||
| PWS_Attch_S001_1.pdf | ||
| PWS_Attch_S008_1.pdf | ||
| PWS_Attch_S014_1.pdf | ||
| PWS_Attch_S006_1.pdf | ||
| PWS_Attch_S016_1.pdf | ||
| PWS_Attch_S010_1.pdf | ||
| PWS_Attch_S002_1.pdf | ||
| DRAFT_PWS_STLI_Mechanical_Services_2025_1_2_1.pdf | ||
| PWS_Attch_S013_1.pdf | ||
| 140P4525R004_STLI_Mechanical_Services_SSS_1.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment No. S004 Historical Utilities Maintenance Data
Service Call History
Year Service Call Quantity 2020 – 2021 3,549 2021 – 2022 3,431 2022 – 2023 3,670 2023 – 2024 3,795 2024 – 2025 2,397
Work Order History Summary: Work Order History for 2020 through 2024
Date
Project Title
Total Amount of T.O.
March, 2020 Installation of 16 Apollo Ionization Smoke Detectors for Liberty Island $5,880.64 March, 2020 Chiller Repair Work Order $6,284.00 May, 2020 CBAS Light Control for K&L Building $6,658.00 July, 2020 Ellis Island Domestic Hot Water System $7,098.12
March, 2021 Liberty Island Tower Switch Reset $4,055.00 August, 2021 Emergency Work on Boiler #1 $7,780.00 January, 2022 Ellis Island Cathodic Protection Repair $13,210.00
November, 2022 Main Sewer Line and Manhole Repair/Relining $401,976.14 February, 2023 Ellis Island Deaeration Tank and Boiler Surge Tank Repair $5,595.00
September, 2023 Generator Control Panel and Surge Tank Repair $76,450.90 December, 2023 Repair Crankcase Heater $8,372.71 December, 2023 Repair/replace three boiler tubes and one chiller control on Ellis Island $20,799.31
TOTAL: $564,159.82