PWS_Attch_S004_1.pdf

PDF 38 KB Posted

Attached to
NPS, Statue of Liberty Park Mechanical Services
Solicitation number
140P4525R0004
Issued by

About this file

This is a historical utilities maintenance data attachment showing service call quantities and work order history for facilities at Liberty Island and Ellis Island. The document provides maintenance data across two key areas:

Service call history shows a generally increasing trend from 2020-2024, ranging from 3,431 to 3,795 annual calls, with a projected decrease to 2,397 calls in 2024-2025. The work order history details 12 specific maintenance projects from 2020-2023 totaling $564,159.82, with projects ranging from $4,055 to $401,976.14. Major work included smoke detector installations, boiler repairs, hot water system maintenance, sewer line repairs, and generator control panel work. The largest single expense was $401,976.14 for main sewer line and manhole repair/relining in November 2022.

View the file

Other files

File Type Posted
PWS_Attch_S009_1.pdf PDF
PWS_Attch_S017_1.pdf PDF
PWS_Attch_S012_1.pdf PDF
PWS_Attch_S005_1.pdf PDF
PWS_Attch_S015_1.pdf PDF
PWS_Attch_S011_1.pdf PDF
PWS_Attch_S007_1.pdf PDF
PWS_Attch_S003_1.pdf PDF
PWS_Attch_S001_1.pdf PDF
PWS_Attch_S008_1.pdf PDF
PWS_Attch_S014_1.pdf PDF
PWS_Attch_S006_1.pdf PDF
PWS_Attch_S016_1.pdf PDF
PWS_Attch_S010_1.pdf PDF
PWS_Attch_S002_1.pdf PDF
DRAFT_PWS_STLI_Mechanical_Services_2025_1_2_1.pdf PDF
PWS_Attch_S013_1.pdf PDF
140P4525R004_STLI_Mechanical_Services_SSS_1.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment No. S004 Historical Utilities Maintenance Data

Service Call History

Year Service Call Quantity 2020 – 2021 3,549 2021 – 2022 3,431 2022 – 2023 3,670 2023 – 2024 3,795 2024 – 2025 2,397

Work Order History Summary: Work Order History for 2020 through 2024

Date

Project Title

Total Amount of T.O.

March, 2020 Installation of 16 Apollo Ionization Smoke Detectors for Liberty Island $5,880.64 March, 2020 Chiller Repair Work Order $6,284.00 May, 2020 CBAS Light Control for K&L Building $6,658.00 July, 2020 Ellis Island Domestic Hot Water System $7,098.12

March, 2021 Liberty Island Tower Switch Reset $4,055.00 August, 2021 Emergency Work on Boiler #1 $7,780.00 January, 2022 Ellis Island Cathodic Protection Repair $13,210.00

November, 2022 Main Sewer Line and Manhole Repair/Relining $401,976.14 February, 2023 Ellis Island Deaeration Tank and Boiler Surge Tank Repair $5,595.00

September, 2023 Generator Control Panel and Surge Tank Repair $76,450.90 December, 2023 Repair Crankcase Heater $8,372.71 December, 2023 Repair/replace three boiler tubes and one chiller control on Ellis Island $20,799.31

TOTAL: $564,159.82