This is a Performance Work Statement (PWS) for mechanical operations and maintenance services at the Statue of Liberty National Monument and Ellis Island, issued by the National Park Service. The contractor will provide 24/7/365 operations and maintenance of HVAC systems, boilers, chillers, electrical systems, plumbing, domestic water, gas lines, ventilation systems, sanitary lift stations, and building automation systems across both islands.

Key requirements include preventive maintenance under $3,000, emergency response within 20 minutes during operating hours, staffing of licensed operators, annual boiler cleaning/certification, quarterly filter replacements, fire suppression testing, and maintenance of complex building automation and fire detection systems. The scope covers multiple facilities including the Statue of Liberty, Ellis Island Immigration Museum, powerhouse, screening facilities at Battery Park and Liberty State Park, and various support buildings. The contractor must maintain historical preservation standards, provide detailed service call documentation, and coordinate with NPS staff. Special focus is placed on maintaining life safety systems in the Statue of Liberty and compliance with New Jersey DEP regulations for boiler operations. The PWS outlines specific staffing requirements including a Site Manager, Lead Technician, and Chiller Technician.

View the file

Other files

File Type Posted
PWS_Attch_S009_1.pdf PDF
PWS_Attch_S017_1.pdf PDF
PWS_Attch_S012_1.pdf PDF
PWS_Attch_S005_1.pdf PDF
PWS_Attch_S015_1.pdf PDF
PWS_Attch_S004_1.pdf PDF
PWS_Attch_S011_1.pdf PDF
PWS_Attch_S007_1.pdf PDF
PWS_Attch_S003_1.pdf PDF
PWS_Attch_S001_1.pdf PDF
PWS_Attch_S008_1.pdf PDF
PWS_Attch_S014_1.pdf PDF
PWS_Attch_S006_1.pdf PDF
PWS_Attch_S016_1.pdf PDF
PWS_Attch_S010_1.pdf PDF
PWS_Attch_S002_1.pdf PDF
PWS_Attch_S013_1.pdf PDF
140P4525R004_STLI_Mechanical_Services_SSS_1.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STLI Mechanical Operations and Maintenance 2025

Performance Work Statement

Mechanical Operations and Maintenance Services for Statue of Liberty National Monument and Ellis Island

National Monument (STLI)

Dated: 1/2/2025 i

Table of Contents 1 INTRODUCTION ............................................................................................................................................ v

1.1. History of Operations and Maintenance at STLI .................................................................................. v

1.2. Work Requirements ................................................................................................................................. v

1.2.1. Operations Services ............................................................................................................................................................. v

1.2.2. Maintenance Services ......................................................................................................................................................... vi

1.2.3. Startup ................................................................................................................................................................................ vi

1.2.4. Special Events Services ...................................................................................................................................................... vi

1.2.5. Staffing ............................................................................................................................................................................... vi

1.3. Security Requirements ............................................................................................................................ vi

1.3.1. Identification ...................................................................................................................................................................... vii

1.3.1.1. Background Investigation ........................................................................................................ vii

1.4. Definitions ............................................................................................................................................. viii 2 OPERATIONS MAINTENANCE SERVICES (CLIN 0010, Firm-Fixed Price) ....................................... x

2.1. Operation of the HVAC Systems ............................................................................................................ x

2.2. HVAC Operation System ........................................................................................................................ xi

2.2.1. HVAC Plant Operation Log Sheets .................................................................................................................................... xi

2.2.2. Maintenance Equipment Forms .......................................................................................................................................... xi

2.2.3. Operation of Non-Certified Boilers or Unfired Pressure Vessels ...................................................................................... xii

2.2.4. Emergencies ...................................................................................................................................................................... xii

2.2.5. Instrumentation and Control System .................................................................................................................................. xii

2.2.6. Fuel Oil Tank ..................................................................................................................................................................... xii

2.2.7. Gas Distribution System ................................................................................................................................................... xiii

2.2.8. Water Treatment ............................................................................................................................................................... xiii

2.2.9. Permitting and Employee Notice ...................................................................................................................................... xiv

2.3. Preventive Maintenance and Service Calls under $3,000 ................................................................... xv

2.3.1. Description of Facilities ..................................................................................................................................................... xv

2.3.1.1. Utilities Maintenance Work Buildings ..................................................................................... xv

Table 2.A – Ellis Island Buildings/Systems ........................................................................................... xv

Table 2.B – Liberty Island Buildings/Systems .................................................................................... xvi

2.3.1.2. Off-Site and Screening Facilities ........................................................................................... xvii

Table 2.C – Off-Site and Screening Buildings/Systems .................................................................... xvii

2.3.1.3. Planned Future Facilities, Structures, Utilities ...................................................................... xvii

Table 2.D – Planned and Future Buildings/Systems ......................................................................... xvii

2.3.1.4. Facilities Not Included ........................................................................................................... xvii

2.3.2. Preventive Maintenance .................................................................................................................................................. xviii

2.3.3. Seasonal Preventive Maintenance ................................................................................................................................... xviii

2.3.3.1. Seasonal Maintenance Schedule ............................................................................................. xix

2.3.3.2. Annual Boiler Cleaning, Inspection, and Certification........................................................... xix

2.3.3.3. Annual Fire Pump Flow Test .................................................................................................. xix

2.3.3.4. Annual Fire Detection Utility Test ......................................................................................... xix ii

2.3.3.5. Annual Fire Suppression Test ................................................................................................... xx

Table 2.E – Fire Suppression Testing Codes ......................................................................................... xx

2.3.4. Service Calls $3,000 and Under ......................................................................................................................................... xx

2.3.4.1. Service Call Materials ............................................................................................................ xxi

2.3.4.2. Service Call Procedures .......................................................................................................... xxi

2.3.4.3. Documentation of Service Calls ............................................................................................ xxii

2.3.4.4. Service Call Status Log ......................................................................................................... xxii

2.3.4.5. Continuous Service Call Log ................................................................................................. xxii

2.3.4.6. Service Call Completion Log ................................................................................................ xxii

2.3.4.7. Service Call Prioritization and Response: ............................................................................ xxiii

Table 2.F – Service Call Categories and Response Requirements .................................................. xxiii

2.3.4.8. Work Description .................................................................................................................. xxiv

2.3.4.8.1. Electrical ........................................................................................................................... xxiv

2.3.4.8.2. Plumbing ............................................................................................................................ xxv

2.3.4.8.3. Domestic Water .................................................................................................................. xxv

2.3.4.8.4. Gas Lines ......................................................................................................................... xxvii

2.3.4.8.5. Work Area Maintenance ................................................................................................ xxvii

2.3.4.8.6. Painting ............................................................................................................................ xxvii

2.3.4.8.7. Carpentry ....................................................................................................................... xxviii

2.3.4.8.8. Masonry .......................................................................................................................... xxviii

2.3.4.8.9. Insulation ........................................................................................................................ xxviii

2.3.4.8.10. Metal Working ............................................................................................................. xxviii

2.3.4.8.11. Repair and Inspection Support ..................................................................................... xxix

2.3.4.8.12. Filter Replacement......................................................................................................... xxix

2.3.4.8.13. Ventilation Systems .......................................................................................................... xxx

2.3.4.8.14. Sanitary Lift Stations ...................................................................................................... xxx

2.3.4.8.15. Miscellaneous Equipment ............................................................................................... xxx

2.3.4.8.16. Historical Preservation .................................................................................................. xxxi

2.3.4.8.17. Scaffolding and Staging ................................................................................................. xxxi

2.4. Maintenance of the Building Automation System (BAS) ................................................................. xxxi

2.5. Management ....................................................................................................................................... xxxii

2.5.1. Facilities Management ................................................................................................................................................... xxxii

2.5.2. Key Personnel ............................................................................................................................................................... xxxiii

2.5.2.1. Site Manager ....................................................................................................................... xxxiii

2.5.2.2. Lead Technician .................................................................................................................. xxxiii

2.5.2.3. Chiller Technician ............................................................................................................... xxxiv

2.5.3. Progress Meetings .......................................................................................................................................................... xxxv iii

2.5.3.1. Daily Status Update Meetings .............................................................................................. xxxv

2.5.3.2. Weekly Progress Meetings ................................................................................................... xxxv

2.5.4. Documents, Tracking Systems, and Plans ..................................................................................................................... xxxv

2.5.4.1. Facilities Management Plan ................................................................................................ xxxvi

2.5.4.2. Staffing Plan ....................................................................................................................... xxxvi

2.5.4.3. Work Control System ........................................................................................................ xxxvii

2.5.4.4. Preventive Maintenance Tracking System......................................................................... xxxvii

2.5.4.5. Semi-Annual Preventive Maintenance Task Schedule ..................................................... xxxviii

2.5.4.6. Monthly and Weekly Work Schedules .............................................................................. xxxviii

2.5.4.7. Preventive Maintenance Records ..................................................................................... xxxviii

2.5.4.8. Preventive Maintenance (PM) Reports ............................................................................... xxxix

2.5.4.9. Facilities History File ......................................................................................................... xxxix

2.5.4.10. Technical Library ................................................................................................................ xxxix

2.5.4.11. Quality Control Program .................................................................................................... xxxix

2.5.4.11.1. Quality Control Plan ................................................................................................... xxxix

2.5.4.11.2. Quality Control Inspections .............................................................................................. xl

2.5.4.12. Safety Program ........................................................................................................................ xli

2.5.4.12.1. Safety Plan ......................................................................................................................... xli

2.5.4.13. Hazardous Materials and Substances ...................................................................................... xli

2.5.4.13.1. Hazardous Substance Management Plan ...................................................................... xlii

2.5.4.13.2. EPA-Required Hazardous Waste Reports ..................................................................... xlii

2.5.4.14. Energy Conservation .............................................................................................................. xlii

2.5.5. Other Management Requirements ................................................................................................................................... xliii

2.5.5.1. Planned System Outages ....................................................................................................... xliii

2.5.5.2. Alternate Heating Appliances ................................................................................................ xliii

2.5.5.3. Conduct of Contractor Personnel .......................................................................................... xliii

2.5.5.3.1. Office Environment, Government Vehicles and Property: ............................................ xlv

2.5.5.3.2. Oversight, Scheduling, Training and Travel .................................................................. xlvi

2.5.5.4. Management of Subcontractors ............................................................................................ xlvii

2.5.5.5. Hours of Operation ............................................................................................................... xlvii

2.5.5.6. Applicable Laws and Regulations ....................................................................................... xlviii

2.5.6. Contract Start-Up ........................................................................................................................................................... xlviii

2.5.7. Post-Award Conferences and Meetings ......................................................................................................................... xlviii

2.5.8. Transition Management Plan ......................................................................................................................................... xlviii

3 SPECIAL EVENTS SERVICES (CLIN 0020, Firm-Fixed Price (FFP)) ..................................................... l Table 4.A – Special Events Staffing ..................................................................................................................... l

4 DELIVERABLES MATRIX .......................................................................................................................... li iv

Table 4.A – Contract Deliverables Matrix ........................................................................................................ li Table 4.B – Annual Deliverables ....................................................................................................................... lii Table 4.C – Semi-Annual Deliverables ............................................................................................................. lii Table 4.D – Quarterly Deliverables ................................................................................................................. liii Table 5.D – Quarterly Deliverables ................................................................................................................. liii Table 4.E – Monthly Deliverables .................................................................................................................... liii Table 4.F – Weekly Deliverables ...................................................................................................................... liii Table 4.G – Daily Deliverables ......................................................................................................................... liv Table 4.H – As Needed Deliverables ................................................................................................................ liv

5 LIST OF ATTACHMENTS ........................................................................................................................... lv v

1 INTRODUCTION

1.1. History of Operations and Maintenance at STLI

The Statue of Liberty National Monument (STLI) includes Ellis Island and Liberty Island. The National Park Service (NPS) opened Ellis Island to the public in 1989. All mechanical systems and utilities have been under an Operating and Maintenance contract from that time.

Operation of the Park facilities was disrupted greatly by Hurricane Sandy in October 2012. Many of the systems were destroyed or damaged. Some systems have been restored, while others have been or are being replaced. In some cases, systems that have been out of service for extended periods of time have been brought back into service as backup systems. The park has added and replaced mechanical systems that were damaged in Hurricane Sandy as the systems have increased since 2014.

Ellis and Liberty Islands are being expanded to include new and restored facilities, structures and utilities.

The Government reserves the right to add work which is within contract scope for any newly restored or additions. The Government reserves the right to exercise optional work within the contract for future facilities.

NPS Government maintenance employees maintain the interior and exterior fabric, hardware, masonry, carpentry and other related building and structure components at Liberty Island and Ellis Island.

Government maintenance employees will continue to perform these services. All mechanical systems and utilities have been under an Operating and Maintenance contract since 2014.

1.2. Work Requirements

The Contractor shall furnish all engineering, labor, materials, parts, and equipment necessary to operate and maintain the facilities, mechanical systems, utilities, related utility structures, buildings and temporary structures as described herein located at Liberty and Ellis Islands, with the exception of property and other resources specifically designated as Government-Furnished Property and Resources. See Attachment S012 for a list of Contractor furnished property.

The location of some of the Facilities fall within the boundary lines of the State of New Jersey. Presently, the majority of "occupied" Facilities are located within the boundary lines of the State of New York. Most of the facility known as the "Power House" is located within the State of New Jersey.

The Government shall conduct periodic quality assurance inspections to ensure contractor is meeting performance requirements.

1.2.1. Operations Services

Includes management of in-house labor, and if applicable, subcontractor forces to provide licensed and trained individuals twenty-four (24) hours a day, 7 days a week, 365 days a year of continuous boiler operations, seasonal chiller operations including annual boiler-overhauls, semi-annual boiler inspection, annual boiler certification, water treatment, and all preventive and corrective maintenance of all HVAC system equipment. Operation services also includes preventive maintenance and minor repair requirements (Service Calls) identified as a result of the preventive maintenance inspection or other work performed under this contract.

vi

The Contractor shall ensure annual boiler flue gas analysis on all boilers is completed. The analysis must be conducted by an independent third party in accordance with NJDEPE regulations using documented, calibrated instruments. The analysis shall contain all of the following: NOX, O2, CO, CO2, excess air, stack temp, ambient temp, CO (0), Efficiency. Readings will be taken before and after adjustments.

Documentation of the readings will be submitted to COR in a report upon completion for submittal to NJDEPE. See Section 2 for Operations Services requirements.

1.2.2. Maintenance Services

Includes management of in-house labor, and if applicable, subcontractor forces to provide preventive maintenance to minimize malfunction, breakdowns, and deterioration, and maximize the operational efficiency, useful lifecycle, and safety of NPS property. At a minimum, the program consists of inspection, cleaning, lubrication, adjustment, calibration, and minor part and component replacement (e.g., filters, belts, hoses, fluids, bearings, oil, and grease) as required minimizing malfunction, breakdown and deterioration of equipment.

Includes all maintenance work, scheduled and unscheduled, on any piece of equipment through a Work Order, Service Call, and/or Task Order. See Sections2 for Operations Services requirements, and Section 3 for Maintenance Services requirements.

1.2.3. Startup

Includes plans for recruiting qualified employees, training, and fully staffing all positions on the first day of contract performance of service. See Section 2.5.6 for additional information on contract startup.

1.2.4. Special Events Services

Includes management of in-house labor, and if applicable, subcontractor forces to provide mechanical maintenance support for Special Events, to minimize any mechanical issues during the event. See Section 3 for Special Event services requirements.

1.2.5. Staffing

The Contractor will proactively operate and maintain all equipment covered by this contract, and develop and implement systems used to identify and alert the Contractor regarding upcoming maintenance/ service tasks and to document maintenance/service tasks already completed. The proposed system(s) shall identify labor hours and skills planned and actual hours used for specific tasks and shall provide estimates regarding staffing levels and completion times for the purpose of assuring adequate resource availability.

See Section 2.5.4.2 for contract Staffing Plan requirements.

1.3. Security Requirements

Performance of this contract requires Contractor personnel to have a NPS issued Park ID before being allowed unsupervised access to park facilities and/or information systems. The Contracting Officer's Representative (COR) will be the requesting official, and will make arrangements through a NPS Park Access Card Sponsor for personal identity verification and NPS Park Access Card issuance. At least two weeks before start of contract performance, the Contractor must identify all contractor and subcontractor personnel who will require “physical and/or logical” access for performance of work under this contract.

vii

Physical Access means routine, unescorted, or unmonitored access to nonpublic areas of a federally controlled facility. Logical Access means routine, unsupervised access to a Level 3 or Level 4 federally controlled information system. The Contractor must make their personnel available at the place and time specified by the COR or Park Access Card Sponsor in order to initiate screening and background investigations.

1.3.1. Identification

Each Contractor employee performing work under this contract shall be issued a NPS Park Identification Card (ID) after successful completion of the USPP background check. See Attachment S019 for Park access and credentialing. To complete the background check employees must complete Attachment S018, USPP PIV Application. NPS Park IDs shall be worn at all times when Contractor employees are onsite.

At least two weeks before start of contract performance, the Contractor must identify all contractor and subcontractor personnel who will require [physical and/or logical] access for performance of work under this contract. Physical Access means routine, unescorted, or unmonitored access to nonpublic areas of a federally controlled facility. Logical Access means routine, unsupervised access to a Level 3 or Level 4 federally controlled information system.

1.3.1.1. Background Investigation

1. NO INDIVIDUAL THAT REPRESENTS A RISK OR THREAT TO NATIONAL SECURITY

AS DETERMINED BY THE GOVERNMENT SHALL BE EMPLOYED UNDER THIS

CONTRACT.

2. All contractor employees shall complete a U.S. Park Police Identification Card Application & Background Check Request Form (attached) must be submitted to the U.S. Park Police (USPP) at least (2) weeks in advance of the employment or work start date.

3. All criminal history must be included on the form. Although the main concern of the USPP is serious criminal activity, and/or appearance on terrorist watch lists, omission of minor criminal incidents is a credibility issue which will delay approval and may be cause for denial.

Intentionally providing false information in any way will result in denial of the application.

4. Once the application is approved you will be required to arrange an appointment with USPP Administrative Support to have your photograph taken and ID card issued. You must come in person to Ellis Island Police Office for this appointment. Digital photographs will not be accepted via email.

5. ID cards will be valid for the anticipated term of the project or for a (1) year period for concessioners and long-term contractors.

6. A replacement ID card will not be issued unless the expired or damaged card is returned. If the ID card is lost or stolen a report must be immediately filed with the U.S Park Police. The USPP case number must be provided to the U.S. Park Police Administrative Secretary prior to issuance of the replacement card. Once the application is approved and prior to starting on-site training, all Contracted personnel will be interviewed by the COR.

7. All contractor employees shall have an ANACI background investigation initiated prior to the duty assignment of any contract employee. NPS will not require the ANACI adjudication prior to viii an employee being assigned to the contract. Contract employees must have their applications approved in E-QIP, by the NPS, before they are permitted to begin work on this contract." These background investigations will be conducted by the Government and shall include, but are not limited to, a criminal history check, a credit bureau check, and employment verification for the five (5) years prior to the year of employment. Evidence of any felony criminal conviction within the previous ten (10)-year period shall disqualify the prospective contractor employee from working at this site. Evidence of any criminal history shall immediately be brought to the attention of the COR.

8. As part of the ANACI background investigation, each employee working on this contract will be required to provide background information on the on-line Office of Personnel Management (OPM) E-QIP system. The Contractor shall provide a point-of-contact (POC) who will assist the Government with ensuring all Contractor employees are successfully processed through the E- QIP system in a timely fashion. The POC shall also ensure the contractor guards meet all processing deadlines set by the COR with respect to the ANACI background check. The Contractor shall bear the cost of the man-hours used to meet these deadlines. The name and number of this point-of-contact shall be given to the COR after this contract is awarded.

9. Prior to providing employee information to the Government for the ANACI background investigation, the Contractor shall conduct a criminal background and credit check on all employees who they wish to hire. If the applicant has serious misdemeanors, felonies, or a history of unpaid bills, the Contractor shall not continue to process this applicant for employment under this Contract. The Contractor is required to save all initial background checks in paper and PDF form. These documents shall be available to the COR upon request.

10. If there are questions about the suitability of an applicant's background, the Contractor shall contact OPM and/or the COR. If it is learned that a guard did not receive a successful ANACI adjudication, he/she shall immediately be removed from this contract.

1.4. Definitions

The following definitions unique to this requirement are provided here:

Minor Repair is defined as any work that does not require work in excess of $3,000.00 for an individual piece of equipment or equipment system.

Service Call (SC) as used in this PWS, is defined as a requirement for minor repairs under $3,000.00, and is completed as a firm-fixed price service. This work encompasses minor repair work for all facilities described in Section 2.3, which is brief in scope, and would not reasonably require separate job planning, estimating, or scheduling. Service Calls can involve any type of electrical, mechanical, or plumbing occupations or combination thereof. Service Calls require operation and maintenance work resulting from normal wear and tear and may be written for a work project of any value or cost up to $3,000.00. They are subject to the Service Contract Act (SCA) and must adhere to the incorporated Wage Determination(s) identified in the contract.

Work Order is defined as one-time work for repairs, maintenance, and rehabilitation that cannot be accomplished using Service Calls because the estimated cost of the work exceeds $3,000.00 and the estimated cost is less than $100,000.00, and is completed as a time & material service. Work Orders ix are for special work that falls with-in the services provided or equipment and systems serviced under this contract for all the facilities described in Section 2.2.1. The work is subject to They are subject to the Service Contract Act (SCA) and must adhere to the incorporated Wage Determination(s) identified in the contract. Only the Contracting Officer (not the Contracting Officer’s Representative (COR) or other NPS employee) can authorize and issue a Work Order. Work Orders are subject to negotiation. The Contacting Officer authorizes Work Orders through an authorization letter issued by the Contracting Officer and co-signed by the contractor. See Section 3.0.

Park is defined as the collective of the Statue of Liberty National Monument, including the Ellis Island Museum of Immigration (ELIS), New Immigration Building (ELIS), Administration Building (ELIS), Utility Building (ELIS), Incinerator Building (ELIS), Kitchen and Laundry Facility (ELIS), Park Screening Tent (ELIS), Bakery and Carpentry Facility (ELIS), Laundry and Outpatient Building (ELIS), Ferry Building (ELIS), Power House Building (ELIS), Fuel Oil Building (ELIS), Boat Fueling Building (ELIS), Ellis Island, Statue of Liberty, Pedestal, Fort Wood, Administrative Building, Statue of Liberty Museum (SOLM), Maintenance Building, Incinerator Building, Concession Building #38, Hills Concession Kiosk, Liberty Island, Shuttle Dock, Main Passenger Dock, Island Sewer System, Electrical and Water Distribution, Liberty State Park Screening Facility, and Battery Park Screening Facility.

x

2 OPERATIONS MAINTENANCE SERVICES (CLIN 0010, Firm-Fixed Price)

2.1. Operation of the HVAC Systems

The Contractor shall supply all labor, supervision, materials and equipment necessary to operate, maintain and repair the boilers, temporary chiller and related equipment and apparatuses 7 days a week 24 hours a day as specified herein. The Contractor shall perform operational checks in accordance with the New Jersey Department of Environmental Protection (NJDEP) regulations and guidelines and New York State Department of Environmental Protection (NYDEP).

Systems include all related and incidental components and apparatus required for a safe and complete operation of the designed equipment. The following is a list of the Systems at the STLI Park:

• Hi-Pressure Steam boilers

• Oil and gas burners

• Oil pumps

• Fans, heat exchangers

• Hot water lines

• Hot water storage tanks

• Feed pumps

• Condensate pumps

• Circulating pumps

• Controls and associated components

• Draft fans

• Air compressor Modules

• Expansion tanks

• Corrosion inhibitors

• Air separators

• Heating coils

• Demineralizer systems

See Attachment S001 for detailed list of equipment requiring maintenance services under this contract.

All materials, supplies, and parts furnished shall meet or exceed the standards required by the manufacturer’s original part and comply with the applicable standards of the National Board of Underwriters, the American Standard Association, Underwriters’ Laboratories, Inc., the Warm Air Conditioning Association, and respective manufacturer’s standards.

Operations shall be in accordance with the laws and regulations set forth by the NJDEP and the site specific NJDEP Operating Permit, and the NYDEP and the site specific NYDEP Operating Permit.

Sections VI of the ASME Boiler and Pressure Vessel Code (BPVC) Section VI., Recommended Rules for the Care and Operation of Heating Boilers, and Unified Facilities Criteria (UFC) 3-410-06N, Central Heating Plants Operation and Maintenance. For inspection and certification purposes the government shall utilize as a guide, UFC 3-430-07, Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels, With Change 5. The Contractor shall assist and perform all services required of an independent inspector as required and outlined in UFC 3-430-07.

A partial list of procedures and standards for HVAC operation and maintenance are prescribed in Attachment S002, References, Directives, and Other Documents.

The Contractor is responsible for both NJDEP Online: NOx RACT Certification Confirmation and inputting of data per the NJDEP Bureau of Stationary Sources, http://www.state.nj.us/dep/aqpp; and for NYDEP boiler certification compliance reporting.

http://www.state.nj.us/dep/aqpp xi

The Contractor operating of the equipment or source operation adjusted pursuant to (a) above shall ensure that each adjustment is recorded in a logbook or computer data system and retained for a minimum of five years, to be made readily accessible to the NJDEP upon request. Such record shall contain the following information for each adjustment:

1. The date of the adjustment and the times at which it began and ended;

2. The name, title and affiliation of the person who made the adjustment;

3. The NOX and CO concentrations in the effluent stream, in ppmvd, before and after each actual adjustment was made;

4. The concentration of O2 (in percent dry basis) at which the CO and NOx concentrations were measured pursuant to Item 3 above;

5. A description of any corrective action taken;

6. Results from any subsequent tests performed after taking any corrective action, including concentrations and converted emission values in pounds per million BTU (lb/MM BTU);

7. The type and amount of fuel used over the 12 months prior to the annual adjustment; and

8. Any other information which the NJDEP or the EPA has required as a condition of approval of any permit or certificate issued for the equipment or source operation.

2.2. HVAC Operation System

The Contractor shall employ a system to identify and alert the Contractor regarding upcoming maintenance/service tasks and to document maintenance/service tasks already completed. The proposed system(s) shall identify labor hours and skills, planned and actual hours used for specific tasks, and shall provide estimates regarding staffing levels and completion times for the purpose of assuring adequate resource availability.

2.2.1. HVAC Plant Operation Log Sheets

Information required on log sheets includes but is not limited to date, time, operator, system/equipment operated, system/equipment status, running times, general condition, and all information specified by each equipment manufacturer. When applicable, equipment and systems, which were secured for an extended period, such as performing scheduled maintenance, a remark shall be included on the log sheet to that effect.

The Contractor shall maintain log sheets on file and present them to the COR for inspection, upon request.

The Contractor shall be responsible for the reproduction of log sheets in sufficient quantities to meet daily requirements.

All logs and forms retained by the Contractor shall be turned over to the COR within ten (10) days after the close of contract. Final Payment will be based on receipt and acceptance of this deliverable.

2.2.2. Maintenance Equipment Forms

The Contractor shall fill out and keep a record of all equipment on a Maintenance Equipment Form.

xii

2.2.3. Operation of Non-Certified Boilers or Unfired Pressure Vessels

The Contractor shall not operate any boilers that have not been inspected during the previous twelve months, or any unfired pressure vessels which do not have a valid inspection certification. In addition, the COR shall be notified prior to repair of a pressure part or any major modification to boilers, control equipment, or auxiliaries. The affected equipment shall not be placed back into operation until written authorization is received from a certified boiler inspector.

The Contractor shall notify the COR when the equipment is ready for inspection. The Contractor shall provide labor, equipment, materials and tools to assist the certified boiler inspector. This is paid for under the Firm Fixed portion of the contract Item Operation of HVAC Systems.

2.2.4. Emergencies

The Contractor shall notify the COR within four (4) hours, when any boiler cannot be placed on-line due to equipment failure. Emergencies (e.g., loss of winter heating capability) shall be reported with fifteen

(15) minutes. Notification shall be by the most expeditious means.

2.2.5. Instrumentation and Control System

The Contractor shall maintain all Instrumentation and Controls required for the operation of the hot water boilers, including all safety interlocks, operating controls mechanical and electrical, the demineralizer system, chemical hot water treatment systems.

The Contractor shall calibrate all pressure, temperature gauge and/or controls that are in question. The equipment shall be calibrated over its full range per the manufacturer’s published data. All tests shall be in accordance with applicable ASME an UL provisions.

2.2.6. Fuel Oil Tank

Ellis Island the steam boilers can be oil-fired and utilizes No. 2 fuel oil. The three 10,000-gallon AST fuel oil tank(s) are located adjacent to the powerhouse. The oil tank(s) are primarily used by the Park Boats and NPS equipment for their operation.

Liberty Island the forced hot water boilers utilizes No. 2 fuel. The five 4,400-gallon AST fuel tank(s) are located in the Liberty Island Maintenance yard in Building #39. The oil tanks are primarily used for heating. The Contractor shall take daily readings of the fuel tank and send to the COR.

The Contractor, under the Firm Fixed Portion of this contract, is responsible for maintaining all pumps, valves, piping, filters, meters, and any related and incidental equipment of the fuel supply system. The Contractor will be responsible to assist in re fueling of Liberty Island fuel tanks. The fueling of fuel tanks will be handled by the NPS. The Contractor will assist with fueling and monitoring the tank levels. The Contractors will take fuel tank readings daily during the months from September 1 to May 1, during the months of May to September the contract shall send tank readings to the designated NPS individual. The Contractor is responsible to maintain the underground fuel lines and all equipment associated with the fuel system. The Contractor shall complete all testing and compliance for underground fuel lines. The Contractor shall provide hydrostatic test crew and equipment on the two double walled fuel pipelines as per the manufacturer’s specifications each year of the contract. Provide an electronic report with NJ xiii professional engineer review and recommendations. The fuel system is connected to the Computrols (CBAS), and the Contractor is responsible to monitor leak detection.

The Liberty underground fuel lines in Liberty Island to all the structures is approximately 1160 linear feet that shall be tested.

The Contractor shall complete fuel spill mitigation of 5 gallons or less.

The Contractor shall test the fuel tank for sludge and/or water accumulation once each year. If more than one inch of water has accumulated in the bottom of a tank, the Contractor shall pump, siphon, or drain out the water. If sludge accumulation is detected, either by testing or by the irregular burning of the fuel, the Contractor shall empty and clean the fuel tank. A written report shall be given the COR within 5 days after all tank tests have been completed.

Water, fuel or sludge removed from the tank shall be disposed of by the Contractor in accordance with applicable Government regulations. When the fuel tank has been identified for pumping of sludge, the Contractor shall notify the CO in writing not less than five (5) working days in advance.

2.2.7. Gas Distribution System

The Contractor is responsible for maintaining, inspecting, and testing all gas distribution piping, valves, safety devices, cathodic protection, strainers, interlocks and any incidental and related components or apparatuses that are directly related to the operation of the Boilers located in the Powerhouse at Ellis Island. The Contractor shall submit inspection and testing reports to the COR on a monthly basis.

The subject pipeline is approximately 1700 feet of 8-inch underwater pipe extending from PSE&G valve located on the shoreline of Liberty Park, Jersey City, New Jersey to its terminus at the Ellis Island power plant. The cathodic protection system consists of one (1) string of four (4) 3-inch by 60-inch, high silicon, cast iron anodes energized by an air-cooled, 20-volt, 10-amprectifier unit. The system was installed in 2008.

2.2.8. Water Treatment

Contractor will be performing the monthly chemical conditioning of boiler water as well as all chilled/hot water systems and associated piping for the closed loop system(s) of the utility Plant. Monthly conditioning will consist of testing the water PH balance and adjusting chemical condition to insure proper PH balance. Water shall be monitored and tested for hardness and treated accordingly to soften the water to prevent excessive corrosion. All treatment to the various systems will be conducted with the least amount of down time to the system. UFC 3-230-13, Industrial Water Treatment Operation and Maintenance, provides thorough coverage of water treatment subjects and should be referenced if greater information is required.

The Contractor shall each month submit to the COR or his representative a copy of the monthly maintenance of all boiler chemical treatments as to the PH reading prior to any adjustment to the chemical balance and after chemical conditioning adjustments are made to the system.

Maintain PH balance according to the manufacturer’s recommendations. Boilers not used after the heating season shall be treated prior to season shutdown. All chilled/hot water heating systems shall be maintained year-round. In addition to the monthly reports, the Contractor shall submit semi-annually, a report on the xiv boilers that are in service year-round, a complete boiler feedwater report from a “Qualified Boiler Feedwater Chemist”. For boilers used only for seasonal heating, the report shall be submitted annually.

The Contractor shall be responsible for furnishing and applying all necessary chemicals as well as maintaining and adjusting all chemical feeding equipment. All services are to be conducted by trained personnel schooled in the proper handling and application of all chemicals(s) to be used in the water treatment process, as well as all equipment used in the feeding of chemicals and testing of water systems.

See Section 2.5.4.13.1, Hazardous Substance Management Plan, regarding submittal of Material Safety Data Sheet.

The Contractor shall operate and maintain all HVAC (Heating, Ventilation, and Air Conditioning) equipment required for a complete HVAC Utility, wherever located at the Facilities. The Contractor shall operate and maintain the high-pressure steam boilers in accordance with the manufacturer’s requirements and NJDEP permit(s) and Inspection reports.

2.2.9. Permitting and Employee Notice

The Contractor shall obtain NJDEP (New Jersey Department of Environmental Protection) permits which require the Contractor to work directly with NJDEP staff inspectors to complete all NJDEP plant inspections and reporting. All NJDEP Reports are the property of the Government, all original documents shall be furnished to the COR within (2) working days of receipt of the report. The Contractor shall maintain copies of these reports during the contract period. The Contractor’s operating staff shall fully comply with all requirements of the NJDEP permit(s). The Contractor shall be responsible to pay and/or reimburse the U.S. Government for NJDEP penalties that are assessed against the Federal Government for the Contractor’s failure to meet the requirements.

Failure of the Contractor to comply with the requirements of the permits shall not only subject the Contractor to monetary penalties from the State of New Jersey Department of Environmental Protection, but will also require the Contractor to pay and/or reimburse the Government for NJDEP penalties which are assessed against the Federal Government for any permitting violations incurred during contract performance.

Only currently NJDEP Certified Boiler Operators/Engineers are allowed to conduct work described in Section 2 of this document. Prior to any employee/subcontractor working on site conducting the work described in Section 2, the Contractor shall provide to the COR proof of current certifications.

Upon final review of all documentation the government may require the Contractor to permanently remove from this site Contractor staff who failed to comply with the NJDEP permit requirements. Within 14 days of award of this contract the Contractor shall issue a memorandum to all of their staff who are directly affected by this and all other contract requirements. Contractor employees shall sign acknowledgement of receipt of this memorandum. A copy of the memorandum and a copy of the receipt shall be submitted to the COR.

xv

2.3. Preventive Maintenance and Service Calls under $3,000

2.3.1. Description of Facilities

The Contractor shall perform Utilities Maintenance work at the facilities and related utilities, in the buildings listed in Sections 2.3.1.1 through 2.3.1.2. Historical data of STLI utilities maintenance can be found in Attachment S004.

2.3.1.1. Utilities Maintenance Work Buildings

The Contractor shall perform Utilities Maintenance work at the facilities and structures listed in Tables 2.A and 2.B, below for the following list of equipment and systems at the Park:

• All air-conditioning equipment and systems

• All air-handling/distribution equipment and systems.

• All domestic water equipment and systems.

• All electrical equipment, lighting, bus duct systems and switchgear systems, electrical panels and sub panels, circuit breakers disconnects,

• Emergency generators, transformers, etc.

• All fire protection equipment and systems.

• All steam systems and equipment, both high and low pressure

• All heating equipment, ductwork, and systems.

• All HVAC system controls, ductwork and monitoring equipment,

• All sanitary sewage equipment and systems,

• All drainage equipment and systems,

• All underground utility systems, and

• All motors, pumps, valves, tanks, etc.

See Attachment S001 for the complete list of equipment and systems. See Attachment S004, for historical data on utilities maintenance completed for the Park.

Table 2.A – Ellis Island Buildings/Systems

Table 2.A –Ellis Island STLI Buildings/Systems

DESCRIPTION APPROX. FLOOR AREA (SF)

Power House 20,500

Bakery and Carpentry Facility 10,500 Kitchen and Laundry…