PWS_Attach_E.pdf

PDF 118 KB Posted

Attached to
T56 Series 3. 0/-15 and 3. 5/-15A Joint Follow on Contract
Solicitation number
FA812125R0017
Issued by

About this file

This document is a Performance Work Statement (PWS) Attachment E detailing Material Review Board (MRB) Exemptions dated 06 Dec 24, specifically for the T56 Series engine contract. The attachment outlines specific materials and components that are exempt from Material Review Board disposition by the government, which may be scrapped when they meet certain criteria and are beyond technical order overhaul reparable limits.

The exemptions cover multiple categories including: (a) materials under $5,000 replacement cost, (b) superseded material configurations like non-rub-tolerant T56-A15 turbine vanes and non-stiffened main diaphragms, (d) bearings, (e) electrical components rejected during testing with no rework criteria, (f) commercial off-the-shelf (CFM) materials excluding parts with life limits, and (g) common hardware like brackets, fasteners, seals, packings, and O-rings. The government retains the right to revise or update this list based on requirements, with deviations to MRB review requirements potentially identified by either the contractor or government and finalized by the Procuring Contracting Officer (PCO) or Administrative Contracting Officer (ACO).

View the file

Other files

File Type Posted
2776654_RDL_REPORT.pdf PDF
4049348_ATTACH.pdf PDF
4050303_RDL_REPORT.pdf PDF
2777388_RDL_REPORT.pdf PDF
2386668_ATTACH.pdf PDF
T56 Follow on questions and answers.xlsx XLSX spreadsheet
2777418_RDL_REPORT.pdf PDF
4016528_RDL_REPORT.pdf PDF
SPI11.pdf PDF
4020186_RDL_REPORT.pdf PDF
4049349_ATTACH.pdf PDF
Final Question set for USAF Pre-Solicitation FA812125R0017 051325 (002).xlsx XLSX spreadsheet
3696726_RDL_REPORT.pdf PDF
2777431_RDL_REPORT.pdf PDF
3894169_RDL_REPORT.pdf PDF
JFOC PWS Apr 2024 Rev 05 (1).pdf PDF
4017110_RDL_REPORT.pdf PDF
SPI2.pdf PDF
4016842_RDL_REPORT.pdf PDF
SPI5.pdf PDF
RQR.pdf PDF
4046876_ATTACH.pdf PDF
Pricing Matrix_T56_DRAFT_Protected_2APR25.xlsx XLSX spreadsheet
2776978_RDL_REPORT.pdf PDF
4049335_ATTACH.pdf PDF
PWS_Attch_C_Pricing_Matrix_T56_DRAFT_Protected_2APR25.xlsx XLSX spreadsheet
GFM_MISTR.pdf PDF
4046862_ATTACH.pdf PDF
4049299_CDRL1_REPORT.pdf PDF
4046879_ATTACH.pdf PDF
4020241_RDL_REPORT.pdf PDF
DID_CDM.pdf PDF
FA812125R0017.docx DOCX document
2776703_RDL_REPORT.pdf PDF
4046836_ATTACH - Copy.pdf PDF
1347283_RDL_REPORT.pdf PDF
4017101_RDL_REPORT.pdf PDF
4049333_ATTACH.pdf PDF
4020247_RDL_REPORT - Copy.pdf PDF
4124791_TRNSPDATA_REPORT.pdf PDF
4046832_ATTACH - Copy.pdf PDF
SPI13.pdf PDF
SPI12.pdf PDF
4049339_ATTACH.pdf PDF
2777968_RDL_REPORT.pdf PDF
PWS_Attach_P.pdf PDF
1728882_RDL_REPORT.pdf PDF
2777441_RDL_REPORT.pdf PDF
2777253_RDL_REPORT.pdf PDF
4020233_RDL_REPORT - Copy.pdf PDF
Show 40 more

Latest 50 of 142 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T56 PWS ATTACHMENT E

Material Review Board Exemptions 06 Dec 24

NOTE: Government retains the right to revise or update this list based on Government requirements.

The following material is exempt from MRB disposition by the Government. It may be dispositioned to scrap when it is determined to meet the following criteria and be beyond T.O.

overhaul reparable limits by Contractor local engineering review The Government retains the right to amend the list below. Deviations to MRB review requirements may be identified by the Contractor or Government and finalized by the PCO/ACO.

(a) Material of less than $5,000 replacement cost

(b) Material configuration has been superseded, or replaced by improved configuration and listed below:

Non rub-tolerant 2nd and 3rd stage T56-A15 turbine vanes Non-stiffened main diaphragm Hastelloy C T56-A15 turbine vane cases Prop shaft seal and Nose bearing plate, P/N 6851491/6846127/6875798, and 6788467/6877391

(d) Bearings

(e) Electrical components rejected for electrical test criteria where no T.O. rework criteria is specified in applicable manuals

(f) Material is CFM, except for parts and assemblies with life limits.

(g) Common hardware; brackets, fasteners, etc. and 100% replacement items; e.g. seals, packings, O-rings, etc.

File details come from the government source that posted it. Updated .