4049335_ATTACH.pdf
PDF 159 KB Posted
- Solicitation number
- FA812125R0017
About this file
This document is a Data Item Description (DID) for a Production Surge Plan, identified by number DI-MGMT-80969. The document outlines the requirements and preparation instructions for a contractor's plan to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment, without a declaration of war or mobilization.
Key details include the requirement for contractors to develop a comprehensive Production Surge Plan that covers the maximum sustainable production rate, building a production schedule, listing subcontracted and non-subcontracted items/components, identifying government contracts being performed at the contractor's facility, and detailing potential surge impacts. The plan must include specifics such as production rate, leadtime, critical components, additional labor requirements, strategic materials, precious metals, and production equipment. The goal is to increase production rate and/or reduce leadtime by at least 10 percent within current facility limitations, providing the government with detailed surge planning capabilities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source: http://assist.dla.mil -- Downloaded: 2024-11-20T17:37Z Check the source to verify that this is the current version before use.
Source: http://assist.dla.mil -- Downloaded: 2024-11-20T17:37Z Check the source to verify that this is the current version before use.
File details come from the government source that posted it. Updated .