PWS Appendix A - Raised Access Floor Plan.pdf

PDF 780 KB Posted

Attached to
OGD raised floor Federal contract opportunity
Solicitation number
HC102824R0075
Issued by
Defense Information Systems Agency

About this file

This document appears to be a set of architectural drawings, specifically a Performance Work Statement (PWS) Appendix A containing a raised access floor plan for the DISA Data Center in Ogden, Utah. The drawings provide details on the existing conditions and requirements for installing a new raised access floor system, including phasing the work to minimize disruption to the existing temperature-controlled computer rooms. The drawings specify the floor rating, cut-outs and grommets for IT and power cabling, and requirements for protecting existing equipment and spaces. This package is related to a federal contract opportunity, Solicitation Number HC102824R0075, for an Ogden raised floor upgrade project. The solicitation is being issued by the Defense Information Systems Agency (DISA), a combat support agency, and includes a requirement for a pre-proposal site visit on September 4, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to OGD raised floor, newest first.
File Type Posted
Pre Bid Questions HC102824R0075.docx DOCX document
updated Pre-Proposal Site Visit Request Instructions (OGD RF and SRG).doc DOC document
HC102824R0075 solicitation amend 1.pdf PDF
Pre-Proposal Site Visit Request Instructions (OGD RF and SRG).doc DOC document
PWS Appendix C - DISA NDA.docx DOCX document
HC102824R0075 solicitation.pdf PDF
OGD pricing sheet.xlsx XLSX spreadsheet
Pre-Proposal Site Visit Request Instructions (OGD RF and SRG).doc DOC document
PWS Appendix B - 09 69 13 - Rigid Grid Access Flooring.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OGDEN COVER SHEET

DEFENSE INFORMATION SYSTEMS AGENCY

DATA CENTER -OGDEN

FY24 - RF UPGRADE

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C O

N C

EP

T

D R

AW

IN

G S

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A C

EN

TE

R O

G D

EN

H

IL

L

AI

R

F O

R C

E

BA

SE

R

F U

PG

R

AD

E

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

FY2

2 RE

PAIR

DO

CK &

INST

ALL

DO

OR

OPE

RAT

OR

S

/0

6/

AA

3/

/2

O G

D _G

-0

G-001

AR

C

H

IT

EC

TU

R

AL

O G

D

EN

C O

VE

R

S H

EE

T

/2

2/

Sheet List Table Sheet Number Sheet Title

GENERAL

G-001 OGDEN COVER SHEET

G-100 LEGEND SHEET

ARCHITECTURAL

AD-101 COMPOSITE FLOOR- DEMO WORK

A-101 RAISED ACCESS FLOOR PLAN

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FAIRFIELD

AutoCAD SHX Text

CEDAR FORT

AutoCAD SHX Text

STOCKTON

AutoCAD SHX Text

DUGWAY

AutoCAD SHX Text

OPHIR

AutoCAD SHX Text

LEHI

AutoCAD SHX Text

TOOELE

AutoCAD SHX Text

GRANTSVILLE

AutoCAD SHX Text

CITY

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

SALT

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

RUSH

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

SALT

AutoCAD SHX Text

GREAT

AutoCAD SHX Text

OGDEN

AutoCAD SHX Text

PROVO

AutoCAD SHX Text

HILL AIR

AutoCAD SHX Text

FORCE BASE

AutoCAD SHX Text

SALT LAKE

AutoCAD SHX Text

INTERNAT'L

AutoCAD SHX Text

AIRPORT

AutoCAD SHX Text

TOOELE

AutoCAD SHX Text

ARMY

AutoCAD SHX Text

DEPOT

AutoCAD SHX Text

AREA

AutoCAD SHX Text

SOUTH

AutoCAD SHX Text

TAD

AutoCAD SHX Text

GROUNDS

AutoCAD SHX Text

DUGWAY

AutoCAD SHX Text

PROVING

AutoCAD SHX Text

UTTR

AutoCAD SHX Text

HILL AIR FORCE

AutoCAD SHX Text

PROXIMITY MAP

AutoCAD SHX Text

LITTLE

AutoCAD SHX Text

MOUNTAIN

AutoCAD SHX Text

ANNEX

AutoCAD SHX Text %%u VICINITY MAP %%U

LEGEND SHEET

1. DURING THE ENTIRE DURATION Of THIS CONTRACT, ALL ADJACENT OCCUPIED SPACES HAVE ONGOING (DAY-TO-DAY) MISSION ESSENTIAL WORK. THIS FACILITY WILL REMAIN FULLY FUNCTIONAL AND OCCUPIED AT ALL TIMES. THE CONTRACTOR SHALL EXERCISE CARE TO REDUCE NOISE AND ENSURE

SAFE INSTALLATION ACTIVITIES WHILE MINIMIZING DISTURBANCES. THE CONTRACTOR SHALL

COORDINATE THE WORK OF ALL ACTIVITIES WHEREBY BOTH THE GOVERNMENT AND THE CONTRACTOR CAN CONTINUE OPERATIONS WITH THE LEAST POSSIBLE INTERFERENCE AND INCONVENIENCE. THE

CONTRACTOR SHALL CONDUCT ALL WORK SUCH THAT MEANS OF INGRESS AND EGRESS, FIRE

RESPONSE ROUTES, ETC., ARE MAINTAINED AT ALL TIMES.

2. ALL INSTALLATION DEBRIS, TRASH, ETC. SHALL BE MAINTAINED IN CONTRACTOR PROVIDED DUMPSTER, IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL ENVIRONMENTAL LAWS AND REGULATIONS.

3. ALL AREAS SHALL BE CLEANED AT A MINIMUM DAILY AND AS REQUIRED TO MAINTAIN A PROFESSIONAL APPEARANCE AT All TIMES. ALL EXISTING BUILDING INTERIORS AFFECTED BY INSTALLATION SHALL BE MAINTAINED AND FULLY PROTECTED BY THE CONTRACTOR UNTIL COMPLETION OF WORK FOR THIS

PROJECT.

4. CONTRACTOR SHALL INSTALL NEW RAISED ACCESS FLOOR IN ACCORDANCE WITH THE "PERFORMANCE WORK STATEMENT", (PWS). THE NEW FLOOR INSTALLATION SHALL BE PHASED WITH THE OLD FLOOR

REMOVAL IN INCREMENTAL SECTIONS. WORK IN COMPUTER ROOMS SHALL NOT DISRUPT THE

TEMPERATURE CONTROLLED CLIMATE IN THE COMPUTER ROOM. THE EXISTING FLOOR IS FLOATING, FLOOR PANEL REMOVAL SHALL BE LIMITED TO REDUCE RISK OF THE EXISTING FLOOR SHIFTING.

EXISTING CRAHs, PDUs, AND MISSION IT RACKS SHALL REMAIN FULLY FUNCTIONAL..

5. SEE PWS AND ITS APPENDICES FOR INFORMATION CONCERNING "RIGID GRID ACCESS FLOORING" DETAILING, INSTALLATION AND SPECIFICATIONS. PROVIDE INSTALLATION PLANS PER REQUIREMENTS OF

THE PWS.

6. THE CONTRACTOR SHALL PROTECT ALL EXISTING FLOORS, EQUIPMENT AND/OR NEARBY SPACES OR AREAS TO REMAIN. IF DAMAGED DURING WORK PERFORMED IN ACCORDANCE WITH THIS PROJECT, CONTRACTOR MUST REPAIR OR REPLACE TO ITS ORIGINAL CONDITION AT CONTRACTOR EXPENSE.

7. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR FURNISHING, AND INSTALLING SIGNS, PROTECTION BARRIERS, ETC., TO WARN OCCUPANTS OF HAZARDOUS AREAS AT THE JOB SITE AND

STORAGE AREAS FOR THE DURATION OF THE CONTRACT.

8. THE DRAWINGS INDICATE EXISTING CONDITIONS BASED ON INFORMATION OBTAINED FROM THE AVAILABLE RECORD DRAWINGS AND FIELD SURVEYS. EXISTING CONDITIONS NOT RELATED TO THE WORK OF THIS PROJECT MAY NOT BE SHOWN. EXISTING CONDITIONS PROVIDED ARE NOT GUARANTEED

TO BE COMPLETE OR CORRECT. PRIOR TO THE START OF THE DESIGN/INSTALLATION, THE

CONTRACTOR/DESIGNER SHALL FIELD VERIFY THE LOCATION, SIZES, CLEARANCES, BUILDING

ELEMENTS ETC. RELATED TO THE WORK. THE DRAWINGS PROVIDED ARE DIAGRAMMATIC AND SHALL BE

CONFIRMED BY THE CONTRACTOR/DESIGNER.

GENERAL NOTES

RAISED FLOOR EQUIPMENT LEGEND:

CRAH UNIT (COMPUTER ROOM

AIR HANDLER)

PDU (POWER DISTRIBUTION UNIT)

SERVER RACK

HUMIDIFIER

CABINET

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C O

N C

EP

T

D R

AW

IN

G S

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A C

EN

TE

R O

G D

EN

H

IL

L

AI

R

F O

R C

E

BA

SE

R

F U

PG

R

AD

E

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

FY2

2 RE

PAIR

DO

CK &

INST

ALL

DO

OR

OPE

RAT

OR

S

/0

6/

AA

3/

/2

O G

D -G

-1

G-100

AR

C

H

IT

EC

TU

R

AL

LE

G

EN

D

S H

EE

T

M

PL

/2

2/

LOBBY

OFFICE

CORRIDOR

CORRIDOR

201B

CORRIDOR

OFFICE

OFFICE

OFFICE

TELCOM/

COMMS

OFFICE

175B

OFFICE

175A

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

VCC

210A

VCC

212A

CORRIDOR

CORRIDOR

216A

COMPARTMENTALIZED COMPUTER SPACE

TRM-768

EF_9_165

CRAH_1-DC-32

40 TONS

"CRAC 32"

C R

AH

_1

-C D

-3

T

O N

S "C

R

AC

1"

PDU_1-B-24

225 KVA

"PDU 701B"

PDU_1-B-25

225 KVA

"PDU 703B"

CRAH_1-DC-22

CRAH_1-DC-36

30 TONS

CRAH_1-DC-38

30 TONS

"CRAC-38"

CRAH_1-CD-37

30 TONS

"CRAC-37"

PDU 801-B

125 KVA

"PDU_1-B-22 "

PDU 801-A

125 KVA

"PDU_1-A-22 "

PDU 802-B

125 KVA

"PDU_1-B-23 "

PDU 802-A

125 KVA

"PDU_1-A-23"

INLET

HOOD

V_1-A-29

V_1-A-15

CORRIDOR

KEY PLAN 1st FLOOR

SCALE: NONE

PLAN

REFERENCE

NORTH

N

COMPOSITE FLOOR- DEMO WORK

SCALE : 1/8" = 1'-0"

AA

3/

/2

O G

D -A

D -1

AD-101

AR

C

H

IT

EC

TU

R

AL

C O

M

PO

SI

TE

F

LO

O R

- D

EM

O W

O R

K

M

PL

/2

2/

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C O

N C

EP

T

D R

AW

IN

G S

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A C

EN

TE

R O

G D

EN

H

IL

L

AI

R

F O

R C

E

BA

SE

R

F U

PG

R

AD

E

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

FY2

2 RE

PAIR

DO

CK &

INST

ALL

DO

OR

OPE

RAT

OR

S

/0

6/

KEYED NOTES:

1. CONTRACTOR SHALL REMOVE THE OLD ACCESS FLOOR SYSTEM IN

ACCORDANCE WITH THE PWS. THE NEW RAISED FLOOR INSTALLATION SHALL

BE PHASED WITH THE OLD FLOOR REMOVAL IN INCREMENTAL SECTIONS.

WORK IN COMPUTER ROOMS SHALL NOT DISRUPT THE TEMPERATURE

CONTROLLED CLIMATE IN THE ROOMS EXISTING CRAHs, PDUs, AND

MISSION IT RACKS SHALL REMAIN FULLY FUNCTIONAL. EXISTING FLOOR IS A

FLOATING FLOOR, FLOOR PANEL REMOVAL SHALL BE LIMITED TO PREVENT

FLOOR FROM SHIFTING. WORK AT ENTRY POINTS OF COMPUTER ROOMS

AND CORRIDORS SHALL BE PERFORMED TO ALLOW SITE PERSONNEL

ACCESS INTO ADJACENT SPACES.

2. REMOVE EXISTING WALL BASE ALONG EXISTING RAISED ACCESS FLOOR

PANELS WHERE FLOOR PANELS AT WALL ARE REMOVED.

TAKE CARE TO MINIMIZE DAMAGE TO WALL WHEN REMOVING WALL BASE.

3. REMOVE EXISTING FLOOR PANELS, STRINGERS, AND PEDESTALS. UPGRADE

FLOOR TILE TO 2000 LB. RATED TILES IN ACCORDANCE WITH THE PWS.

4. WHERE FLOOR PANELS GO BELOW PARTITION WALLS, DO NOT REMOVE THE

FLOOR PANEL UNDER THE PARTITION WALL.

5. REMOVE FLOOR PANEL UNDER PARTITION WALL BETWEEN 216A AND 217

ONLY. REMAINING TILES IN ROOM 217 ARE NOT REMOVED.

0 4' 8' 16'

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

1 2 3

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

1 2 3 4

1 2 3

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

OFFICE

CORRIDOR

OFFICE

OFFICE

OFFICE

TELCOM/

COMMS

OFFICE

175B

OFFICE

175A

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

VCC

210A

VCC

212A

CORRIDOR

CORRIDOR

216A

COMPARTMENTALIZED COMPUTER SPACE

CRAH_1-DC-32

40 TONS

"CRAC 32"

C R

AH

_1

-C D

-3

T

O N

S "C

R

AC

1"

PDU_1-B-24

225 KVA

"PDU 701B"

PDU_1-B-25

225 KVA

"PDU 703B"

CRAH_1-DC-36

30 TONS

CRAH_1-DC-38

30 TONS

"CRAC-38"

CRAH_1-CD-37

30 TONS

"CRAC-37"

PDU 801-B

125 KVA

"PDU_1-B-22 "

PDU 801-A

125 KVA

"PDU_1-A-22 "

PDU 802-B

125 KVA

"PDU_1-B-23 "

PDU 802-A

125 KVA

"PDU_1-A-23"

EDP_1-D-34

INLET

HOOD

V_1-A-29

V_1-A-15

CORRIDOR

KEY PLAN 1st FLOOR

SCALE: NONE

PLAN

REFERENCE

NORTH

N

RAISED ACCESS FLOOR PLAN

SCALE : 1/8" = 1'-0"

AA

3/

/2

O G

D -A

D -1

A-101

AR

C

H

IT

EC

TU

R

AL

R

AI

SE

D

A C

C

ES

S

FL

O O

R P

LA

N

M

PL

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C O

N C

EP

T

D R

AW

IN

G S

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A C

EN

TE

R O

G D

EN

H

IL

L

AI

R

F O

R C

E

BA

SE

R

F U

PG

R

AD

E

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

FY2

2 RE

PAIR

DO

CK &

INST

ALL

DO

OR

OPE

RAT

OR

S

/0

6/

GENERAL NOTES:

1. NEW ACCESS FLOOR TILES SHALL BE INSTALLED FLUSH WITH EXISTING

ADJACENT FINISHED FLOOR AND FLOOR PANELS WHICH ARE BENEATH PARTITION WALLS

(ROOM 216 AND CORRIDOR 210 ONLY). PROVIDE DETAILS ON CONTRACTOR-GENERATED

INSTALLATION PLANS.

2. SEE "PERFORMANCE WORK STATEMENT" (PWS) AND ITS APPENDICES FOR

INFORMATION CONCERNING RIGID GRID ACCESS FLOORING.

3. PROVIDE CUT-OUTS AND GROMMETS FOR I.T. AND POWER CABLING AT I.T.

RACKS AND POWER DISTRIBUTION UNITS. SEE PWS AND COORDINATE

LOCATION WITH SITE POC.

4. WHERE CUT-OUTS ARE REQUIRED IN FLOOR PANELS TO ALLOW FOR I.T. AND POWER

CABLING OR OTHER PENETRATIONS:

- PROVIDE/INSTALL FLUSH MOUNTED GROMMETS WITH BRUSHES

(TO SEAL OFF AIR FLOW) TO COVER CUTOUTS IN ACCESS FLOOR PANELS. GROMMETS

SHALL BE EITHER CUT IN HALF, OR BE 2-PIECE NESTING UNITS - TO ALLOW FOR EASY

REMOVAL OF FLOOR PANELS, WHILE ALLOWING CABLING TO REMAIN IN PLACE.

GROMMETS SHALL BE EITHER KOLDLOK 1010 (CUT IN HALF) OR KOLDLOK 3030 (2-PIECE)

OR APPROVED EQUAL.

- FLOOR PANEL CUT-OUTS FOR EQUIPMENT THAT CANNOT BE DISCONNECTED SHALL BE

ON THE EDGES OF PANELS. THIS WILL ALLOW FLOOR PANELS TO BE REMOVED AND

REPLACED, WHILE ALLOWING CABLING TO REMAIN IN PLACE.

KEYED NOTES:

1. CONTRACTOR SHALL INSTALL NEW RAISED ACCESS FLOOR PANELS, STRINGER,

AND PEDESTALS RATED FOR 2000 LBS IN ACCORDANCE

WITH THE PWS. THE NEW RAISED ACCESS FLOOR INSTALLATION SHALL BE

PHASED WITH THE OLD FLOOR REMOVAL IN INCREMENTAL SECTIONS.

WORK IN COMPUTER ROOMS SHALL NOT DISRUPT THE TEMPERATURE

CONTROLLED CLIMATE IN THE ROOMS, EXISTING CRAHs, PDUs, AND MISSION

I.T. RACKS SHALL REMAIN FULLY FUNCTIONAL.

2. THE CONTRACTOR SHALL REPAIR DAMAGE CAUSED DURING THE PERFORMANCE

OF THIS PROJECT. CLEAN THE STRUCTURAL CONCRETE FLOOR DURING

REPLACEMENT OF ACCESS FLOOR SYSTEM AS REQUIRED BY THE PWS.

3. INSTALL NEW WALL BASE WHERE PERIMETER FLOOR PANELS ARE REPLACED.

4. ENSURE EXISTING FLOOR PANELS WHICH RUN UNDER PARTITION WALLS AND

NOT REPLACED REMAIN FULLY SUPPORTED.

1 2 3

1 2 3

1 2 3 4

0 4' 8' 16'

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

1 2 3 4

NOT I

N S

COPE

NOT I

N S

COPE

1 2 3 4

NOT I

N S

COPE

NOT I

N S

COPE

NOT I

N S

COPE

1 2 3

G-001
Sheets and Views
OGD_G-001-G-001
G-100
Sheets and Views
OGD-G-100-G-100
AD-101
Sheets and Views
OGD-AD-102-AD-101
A-101
Sheets and Views
OGD-AD-102-A-101

File details come from the government source that posted it. Updated .