Pre Bid Questions HC102824R0075.docx
DOCX document 15 KB Posted
- Attached to
- OGD raised floor Federal contract opportunity
- Solicitation number
- HC102824R0075
- Issued by
- Defense Information Systems Agency
About this file
This document appears to be a set of pre-bid questions and answers related to Solicitation No. HC102824R0075 for an upgrade to the raised floor at the Ogden facility. The key details are:
The solicitation is for a raised floor upgrade project at the Ogden facility, led by the Defense Information Systems Agency. The pre-bid questions seek information on the existing raised floor system, including the finished floor height, wall construction, understructure details, and clearances above the server cabinets. The government has provided responses indicating the floor is 24 inches above the subfloor, the walls are partitions, the pedestals are glued to the subfloor, and the underfloor plenum contains various utilities and cabling. Photos of the existing conditions could not be provided. Additional details on the scope of work and requirements are contained in the attached Performance Work Statement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| updated Pre-Proposal Site Visit Request Instructions (OGD RF and SRG).doc | DOC document | |
| HC102824R0075 solicitation amend 1.pdf | ||
| Pre-Proposal Site Visit Request Instructions (OGD RF and SRG).doc | DOC document | |
| PWS Appendix C - DISA NDA.docx | DOCX document | |
| OGD pricing sheet.xlsx | XLSX spreadsheet | |
| Pre-Proposal Site Visit Request Instructions (OGD RF and SRG).doc | DOC document | |
| PWS Appendix B - 09 69 13 - Rigid Grid Access Flooring.docx | DOCX document | |
| HC102824R0075 solicitation.pdf | ||
| PWS Appendix A - Raised Access Floor Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: HC102824R0075
1) Can we get the finished floor height of the access floor from sub floor slab to top of access floor panel?
2) What is the wall type construction of the wall on top of access floor at 216 and 210 that must be supported during replacement? Are there obstacles below the floor at these locations that would prohibit the floor replacement? Can a photo of the sub floor be provided?
3) Can the government provide us with details on the existing access floor understructure (base plate dimensions, means of attachment, glue or glued and anchored). Is it possible to get a photo of the understructure?
4) Sub floor utilities: Can we get a photo of the sub floor to understand the amount and density of utilities (chilled water lines, smoke detection, clean agent piping, cable tray, power cables) in the sub floor?
5) Can we get a dimension of from the top of the servers to the acoustic ceiling? Are there cable trays or electrical buss duct directly above the server cabinets? If so, how much clearance between the top of the server cabinets and the underside of the cable tray/buss duct?
ANSWERS:
| 1. | The floor is 24 inches above the subfloor, as detailed in PWS appendix B paragraph 2.2.1.1 |
| 2. | Partition wall. Photos not possible. Actual material of construction not certain. |
| 3. | Pedestals are glued to the subfloor. |
| 4. | Photos are not possible. The underfloor plenum contains PDU whips (not in cable tray), chilled water lines, VESDA piping, SRG, some cable tray, and some networking cables |
| 5. | Most clearance is at least 3-4 inches between racks and cable tray. There is only about 1” between the top of the garage and the cable tray. |