PWS Appendix 5 Atch B - Transmittal Cover Sheet.pdf
PDF 185 KB Posted
- Solicitation number
- HC102820R0053
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Appendix 1 - MEC 2nd Floor Plan (CRAH Locations).pdf | ||
| RFQ Attachment 1- QASP.docx | DOCX document | |
| PWS Appendix 5 - Submittal Procedures.docx | DOCX document | |
| PWS Appendix 5 Atch A - Submittal Register spreadsheet.xlsx | XLSX spreadsheet | |
| PWS Appendix 7 - DISA Identification Labeling and Marking Specfication.pdf | ||
| PWS Appendix 3 - CRAH Unit list.pdf | ||
| PWS Appendix 5 Atch C - Deficiency Log.xlsx | XLSX spreadsheet | |
| PWS Appendix 6 - DISA Electrical Safety Program.pdf | ||
| HC102820R0053 - Solicitation Mech Distro Panelboards.pdf | ||
| PWS Appendix 2 - Power Diagrams.pdf | ||
| PWS Appendix 4 - DISA SEC Inventory Spreadsheet.xlsx | XLSX spreadsheet | |
| RFQ Attachment 2- CLIN Pricing Sheet.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01 33 00 Appendix B, Transmittal Cover Sheet, June 2019 Page 1 of 2
DISA FACILITIES ENGINEERING, DENVER
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
DATE TRANSMITTAL NO. (See Note 2)
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section to be initiated by the Contractor)
TO: FROM: CONTRACT NO. CHECK ONE:
NEW TRANSMITTAL
RESUBMITTAL OF TRANSMITTAL
SPECIFICATION SEC. NO. (Cover only one section with each transmittal) (See Note 6) PROJECT TITLE AND LOCATION CHECK TRANSMITTAL REVIEWER(S): (See Note 7)
G DOR CxA CR
ITEM NO.
(See Note 8)
DESCRIPTION OF SUBMITTAL ITEM
(Type size, model number/etc.)
SUBMITTAL
TYPE CODE
(See Note 9)
CONTRACT DOCUMENT REFERENCE VARIATION
Enter "Y" if requesting a variation
(See Note 11)
DISA
ACTION
CODE
(See Note 12)
SECTION
PARAGRAPH NO.
(See Note 10
DRAWING
SHEET NO.
a. b. c. e. f. g. h.
REMARKS I certify the above submitted items have been reviewed in detail, are correct, and in strict conformance with the Contract requirements, design drawings and specifications except as otherwise noted.
NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR
SECTION II - APPROVAL ACTION
ENCLOSURES RETURNED (List by item No.) NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE AND DATE OF APPROVING AUTHORITY
Section 01 33 00 Appendix B, Transmittal Cover Sheet, January 2019 Page 2 of 2
INSTRUCTIONS
1. Contractor initiates Section I in the required number of copies.
2. Consecutively number each Transmittal. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the Specification Section number.
The second part is a sequential number for the submittals under that Specification Section. If the Transmittal is a Contract requirement which is not part of a Specification Section, use “SOW” as the first part of the Transmittal Number. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.
3. Complete a separate DISA Transmittal Form for each submittal requiring expeditious handling.
4. All items transmitted on a single DISA Transmittal Form must be from the same Specification Section. Do not combine submittals from different Specification Sections.
5. A letter of transmittal is not required.
6. List the Specification Section number. In the case there is no Specification Section, enter the document which requires the submittal (i.e., SOW).
7. Identify the required reviewer(s) for the transmittal:
G – Government Review (required for all approvals) CR – Government Conformance Review of Drawings DOR – Designer of Record Review CxA – Commissioning Agent Review
8. Use the same "Item No." for each entry in column (a) of Section I as on the project Submittal Register.
9. When submittal items are transmitted, indicate the "Submittal Type" (SD-00 through SD-11) in column (c) of Section I. Submittal types are the following:
SD-00 – SOW or other Contract document SD-03 – Product Data SD-06 – Test Reports SD-09 – Manufacturer's Field Reports
SD-01 – Preinstallation Submittals SD-04 – Samples SD-07 – Certificates SD-10 – O&M Data
SD-02 – Shop Drawings SD-05 – Design Data SD-08 – Manufacturer's Instructions SD-11 – Closeout Submittals
10. List the Specification Section paragraph number in column (e) of Section I. If the submittal is a Contract requirement which is not part of a Specification Section, list “SOW.”
11. If the data submitted are intentionally in variance with the Contract requirements, indicate a variation in column (g) and enter a statement in the Remarks block describing the detailed reason for the variation, in accordance with Contract documents.
12. For each submittal item, the Approving Authority will assign Submittal Action Codes in column (h) of Section I. The Submittal Action Codes are:
A – Approved as submitted. Complete D – Will be returned by separate correspondence. Complete.
B – Approved, except as noted on drawings. Resubmission not required. E – Disapproved. Refer to attached comments. Resubmission Required.
C – Approved, except as noted on drawings. Refer to attached comments. F – Receipt acknowledged. Complete.
Resubmission Required.
13. Approval of items does not relieve the Contractor from complying with all the requirements of the Contract.
| DATE: |
| TO: |
| FROM: |
| CONTRACT NO: |
| NEW TRANSMITTAL: Off |
| undefined: Off |
| RESUBMITTAL OF TRANSMITTAL: |
| PROJECT TITLE AND LOCATION: |
| G: Off |
| DOR: Off |
| CxA: Off |
| CR: Off |
| REMARKS: |
| NAME OF CONTRACTOR: |
| NAME AND TITLE OF APPROVING AUTHORITY: |
| TRANSMITTAL NO: |
| SPECIFICATION SEC NO: |
| ITEM NO 1: |
| ITEM NO 2: |
| ITEM NO 3: |
| ITEM NO 4: |
| ITEM NO 5: |
| ITEM NO 6: |
| ITEM NO 7: |
| ITEM NO 8: |
| ITEM NO 9: |
| ITEM NO 10: |
| ITEM NO 11: |
| DESCRIPTION 1: |
| DESCRIPTION 2: |
| DESCRIPTION 3: |
| DESCRIPTION 4: |
| DESCRIPTION 5: |
| DESCRIPTION 6: |
| DESCRIPTION 7: |
| DESCRIPTION 8: |
| DESCRIPTION 9: |
| DESCRIPTION 10: |
| DESCRIPTION 11: |
| PARAGRAPH 1: |
| PARAGRAPH 2: |
| PARAGRAPH 3: |
| PARAGRAPH 4: |
| PARAGRAPH 5: |
| PARAGRAPH 6: |
| PARAGRAPH 7: |
| PARAGRAPH 8: |
| PARAGRAPH 9: |
| PARAGRAPH 10: |
| PARAGRAPH 11: |
| DRAWING SHEET NO 1: |
| DRAWING SHEET NO 2: |
| DRAWING SHEET NO 3: |
| DRAWING SHEET NO 4: |
| DRAWING SHEET NO 5: |
| DRAWING SHEET NO 6: |
| DRAWING SHEET NO 7: |
| DRAWING SHEET NO 8: |
| DRAWING SHEET NO 9: |
| DRAWING SHEET NO 10: |
| DRAWING SHEET NO 11: |
| VARIATION 1: |
| VARIATION 2: |
| VARIATION 3: |
| VARIATION 4: |
| VARIATION 5: |
| VARIATION 6: |
| VARIATION 7: |
| VARIATION 8: |
| VARIATION 9: |
| VARIATION 10: |
| VARIATION 11: |
| DISA ACTION 1: |
| TYPE 1: |
| TYPE 2: |
| TYPE 3: |
| TYPE 4: |
| TYPE 5: |
| TYPE 6: |
| TYPE 7: |
| TYPE 8: |
| TYPE 9: |
| TYPE 10: |
| TYPE 11: |
| DISA ACTION 2: |
| DISA ACTION 3: |
| DISA ACTION 4: |
| DISA ACTION 5: |
| DISA ACTION 6: |
| DISA ACTION 7: |
| DISA ACTION 8: |
| DISA ACTION 9: |
| DISA ACTION 10: |
| DISA ACTION 11: |
| ENCLOSURES RETURNED: |
File details come from the government source that posted it. Updated .