PWS Addendum 1 Building 282.docx

DOCX document 21 KB Posted

Attached to
Sheet Metal Corrosion Facilities Maintenance and Repair
Solicitation number
FA446021Q0031
Issued by

About this file

This combined synopsis and solicitation requests quotations for preventive maintenance and repair services at Little Rock Air Force Base. The solicitation seeks maintenance of abrasive blast equipment, breathing air systems, paint spray/removal equipment, surface preparation booths, vinyl/decal equipment, and aircraft wash equipment in buildings 228, 233, and 282. Services include quarterly preventative maintenance in accordance with manufacturer specifications. Interested parties must provide past performance references and a maintenance plan not exceeding seven pages describing labor mix and proposed schedule. The Department of the Air Force will award a firm-fixed price contract to the offeror with the lowest priced technically acceptable quotation. Questions are due by October 14th and site visits will be held on October 12th. Attendance is encouraged but not required.

View the file

Other files

File Type Posted
Offeror Price List (Schedule B).xlsx XLSX spreadsheet
Performance Work Statement (Revised 8-Oct-21).docx DOCX document
PWS Addendum 2 Building 228.docx DOCX document
PWS Addendum 3 Building 233.docx DOCX document
Offeror Price List (Schedule B).xlsx XLSX spreadsheet
Performance Work Statement (Revised 29-Sep-21).docx DOCX document
Wage Determination.pdf PDF
Solicitation - FA446021Q0031.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 282 Checklist LITTLE ROCK AFB Building 282 Checklist For 19 MXS Corrosion/Wash Rack Facility Maintenance Contract ITEM 1: Paint Hangar maintenance program will include the following:

· Check motor belts for wear and tension

· Inspect door seals and gaskets

· Check and tighten all electrical connections

· Service and clean airflow switches

· Inspect fire suppression for damage/serviceability

· Inspect main exhaust blower/fans

· Inspect filter plenums

· Inspect doors and electrical interlock system

· Inspect and clean exhaust fan blades

· Inspect all air connections and hoses in hangar for serviceability

· Inspect all breathing air connections for serviceability

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufacturers’ recommendations.

ITEM 2: Paint Hangar Air Make Up (AMU) units or Make-Up Air Units (MAU) (AMUs are on roof of Building 282)

· Check and ensure all parts are in correct working order.

· Check and repair or replace all electrical components, wiring and parts not limited to but to include fuses as required.

· Inspect, adjust and replace as required all belts.

· Clean burner on heating units and adjust for proper heating capabilities.

· Clean, repair or replace fan blades and all ductwork as required.

· Repair or replace all loose or bad bearings.

· Make adjustments and alignments to all pulleys and sheaves.

· Clean and repair evaporative cooling system as required.

· Lubricate motors as required.

· Repair leaks and replace parts to ensure proper operation as required.

· Inspect AMU filters (change when necessary, at least annually)

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufacturers’ recommendations. During the course of the quarterly preventative maintenance, the vendor shall replace parts as required in accordance with manufacturers’ instructions. All parts replacement requires authorization by section supervision. The vendor will utilize the “set aside amount” and adhere to the procedures and restrictions in the PWS for any parts that are required. Any unscheduled repairs will be subject to service calls.

ITEM 3: Paint Booth (1 each) in Building 282 Paint booth maintenance program will include the following:

· Clean and inspect all light fixtures and glass lens

· Inspect for burned out light tubes and ballasts

· Check motor belts for wear and tension

· Inspect door seals and gaskets

· Check and tighten all electrical connections

· Service and clean airflow switches

· Lubricate blower shaft bearings

· Inspect fire suppression for damage/serviceability

· Inspect exhaust stack, dampers and stack heads

· Inspect upper plenum

· Inspect doors and electrical interlock system

· Inspect and lubricate all doors on booths

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 4: Paint Booth Air Make Up (AMU) units or Make-Up Air Units (MAU) in building 282.

· Check and ensure all parts are in correct working order.

· Check and repair or replace all electrical components, wiring and parts not limited to but to include fuses as required.

· Inspect, adjust and replace as required all belts.

· Clean burner on heating units and adjust for proper heating capabilities.

· Clean, repair or replace fan blades and all ductwork as required.

· Repair or replace all loose or bad bearings.

· Make adjustments and alignments to all pulleys and sheaves.

· Clean and repair evaporative cooling system as required.

· Lubricate motors as required.

· Repair leaks and replace parts to ensure proper operation as required.

· Inspect AMU filters (change when necessary, at least annually)

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations. During the course of the quarterly preventative maintenance, the vendor shall replace parts as require in accordance with manufacturer’s instructions. All parts replacement requires authorization by section supervision. The vendor will utilize the “set aside amount” and adhere to the procedures and restrictions in the PWS for any parts that are required. Any unscheduled repairs will be subject to service calls.

ITEM 5: Corrosion Hangar Blaster Dust Collector in Building 282

· Monitor overall performance of the collector

· Monitor exhaust for leaks

· Ensure proper solenoid and diaphragm valve operation

· Inspect door seals for condition and contact (Replace as required)

· Inspect and ensure air plenum is free of dust, check surrounding area for leakage.

· Inspect all air components for leaks

· Check dust collector filters for leaks and life of service

· Replace compressed air filters (at least annually)

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 6: Walk-in Blasters building 282

· Check overall condition of blast equipment

· Inspect air inlet filters, clean or replace as needed

· Inspect Dust Collector cartridges

· Inspect HEPA filters (If installed)

· Clean and check pressure vessel air inlet valve

· Clean and check air exhaust valve or pinch valve

· Clean and adjust choke valve

· Clean inlet valve (pop-up)

· Clean and adjust foot control

· Inspect dust collector pulse valves (automatic solenoid operation)

· Check and adjust all door interlocks

· Clean and inspect all air regulators and pressure gauges

· Check media aerators filter and change as needed

· Clean moisture separator

· Check blast nozzles for wear

· Clean magnetic separator

· Inspect and adjust all door handles, strikes, and latches

· Check and adjust magnetic gauges

· Inspect all hoses and connections

· Clean and adjust cyclone and air wash

· Lubricate all motors and bearings

· Check for vacuum leaks

· Check airflow of booth and adjust accordingly

· Inspect breathing air filter

· Clean all vibrator screens

· Inspect all ducting and vacuum hose

· Inspect breathing air system if installed

· Replace personnel door seal on walk-in blaster when required

· Inspect blaster booth room inlet filters

· Replace or wash (if filters are washable metal filters) blaster booth room inlet filters as required

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 7: Cabinet Blasters (2 each) in building 282.

Abrasive blast equipment maintenance program will include the following:

· Check overall condition of blast equipment

· Inspect air inlet filters, clean or replace as needed

· Inspect Dust Collector cartridges

· Inspect HEPA filters

· Clean and check pressure vessel air inlet valve

· Clean and check air exhaust valve or pinch valve

· Clean and adjust choke valve

· Clean inlet valve (pop-up)

· Clean and adjust foot control

· Inspect dust collector pulse valves (manual operator control)

· Check and adjust all door interlocks

· Clean and inspect all air regulators and pressure gauges

· Check media aerators filter and change as needed

· Clean moisture separator

· Check blast nozzles for wear

· Clean magnetic separator

· Inspect and adjust all door handles, strikes, and latches

· Check and adjust magnehelic gauges

· Inspect gloves and gauntlets

· Inspect all hoses and connections

· Clean and adjust cyclone and air wash

· Lubricate all motors and bearings

· Check for vacuum leaks

· Check dust collector filters for leaks and life of service

· Inspect breathing air filter

· Clean all vibrator screens

· Inspect all ducting and vacuum hose

· Inspect breathing air system if installed

· Inspect cabinet blaster door seals, replace if required.

· Replace personnel door seal on walk-in blaster when required

· Additional tasks as specified in manufacture’s documentation for preventive maintenance

· All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 8: Breathing Air System in Building 282.

The breathing air system maintenance program for Building 282 will include the following:

· Inspect all fittings and soldered joints

· Inspect purifier connections

· Inspect all automatic drains for operation

· Inspect all fittings and soldered joints connecting air purifier to compressors

· Perform preventative maintenance on breathing air compressors

· Replace filters when required

· Service and replace filters on breathing air compressors when required

· Calibrate all CO monitors

· Test all emergency horns and lights

· Check desiccant levels as required

· Perform quarterly air sampling of breathing air system

· Certify “Class D” breathing air and provide certification letter to shop supervision that will be passed on to the base Bioenvironmental Engineering Office.

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 9: Breathing Air Driers/Carbon Monoxide Detectors, Building 282.

· Inspect all fittings and soldered joints

· Check and ensure all mechanical parts are in proper working order

· Inspect all automatic drains for operation

· Check and repair all electrical components as required

· Check and refill all refrigerant level as required.

· Inspect, adjust and replace belts as required.

· Perform preventative maintenance on compressors

· Make all required service adjustments to the pilot valves, pressure switches and regulating valves.

· Service and replace filters on compressors when required

· Clean after cooler and lubricate cooler fins.

· Repair leaks and replace parts to ensure proper operation as required.

· Lubricate motors and bearings as necessary.

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 10: Aqua Miser (pressure washer)

· Inspect fluid levels and refill/replace as required.

· Repair leaks and replace parts to ensure proper operation as required.

· Check and ensure all mechanical parts are in proper working order.

· Inspect hoses and fittings for leaks and deterioration.

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 11: Condor EcoFlex, Model 56509008

· Inspect and clean tanks and hoses

· Inspect, clean, rotate the brushes and pads

· Inspect and clean squeegee

· Inspect and clean vacuum shut off float

· Inspect and clean vacuum motor foam float

· Inspect and clean hopper on cylindrical system

· Inspect scrub housing skirts required

· Inspect each battery cell’s water level

· Inspect and clean solution filter

· Inspect foot/parking brake for wear and adjustment

· Clean solution trough on cylindrical system

· Purge detergent system

· Perform side broom maintenance and adjustment

· Grease squeegee caster wheel axel and pivot

· Grease steering wheel shaft universal joint

· Grease steering chain

· Grease squeegee mount angle adjustment knob threads

· Lightly lubricate squeegee tool end wheels

· Lightly lubricate recovery tank release latch

· Lightly lubricate brake pedal (parking brake) linkage

· Inspect vacuum motor carbon brushes annually

· Additional tasks as specified in manufacture’s documentation for preventive maintenance All maintenance shall be performed in accordance with manufactures’ recommendations.

ITEM 12: Gerber Edge FX-2 Printer

· Inspect and clean Print head

· Inspect and clean Sprockets

· Inspect and clean Bail arms(replace yearly or when damaged)

· Inspect and clean Material squeegees

· Inspect and clean Platen

· Inspect and clean Foil squeegee(replace yearly or when damaged)

· Replace fuses as needed

ITEM 13: Envision Plotter

· Inspect and clean tool head

· Inspect and clean sprockets and bails

· Inspect and clean Y axis beam and tool assembly

· Inspect and clean cutting strip (replace as needed)