This is a Performance Work Statement (PWS) for the mechanical modification of Data Transfer Device (DTD) enclosures under contract DMEA 26-6G1, effective 1 July 2026.

The contractor shall modify a total of 200 DTD enclosures (100 each of part numbers MEA-204002 Side A and MEA-204003 Side B) from existing government-furnished inventory to accommodate new PCB designs and eliminate physical interferences. The work applies to enclosures used in F-22, C-130, C-5, and PMCIA data card systems. The government will provide 200 units of Case Side A (MEA-204002) and 200 units of Case Side B (MEA-204003), available on 7 July 2026. The contractor must modify 10 units of each enclosure type as first articles for government inspection and approval by DMEA before proceeding with the remaining 190 units of each type. For the Side B enclosures, the contractor shall remove and retain plastic frames for return to DMEA upon project completion. The contractor is responsible for all shipping costs and delivery of modified units to DMEA points of contact specified in Section 5.0. Additionally, the contractor shall provide comprehensive program management including administrative, technical, and financial management, maintain status reports on progress toward objectives, document all technical activities and issues, and deliver a final program summary comparing planned schedules and costs with actual performance. Technical specifications and detailed modification requirements are provided in government-supplied 3D models and 2D drawings dated 7 July 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW PWS Template 2021 June.doc

PERFORMANCE WORK STATEMENT (PWS)

DMEA 26-6G1

1 July 2026

Project Engineer:

1.0 SCOPE:

1.1 TITLE: Mechanical modification of enclosures for Data Transfer Device (DTD) project

1.2 APPLICABILITY: F-22, C130, C5, PMCIA data cards

1.3 BACKGROUND: Original sheet metal enclosures for DTDs need to be modified so they can accommodate the new PCB design and avoid physical interferences.

1.4 PURPOSE: To physically modify existing inventory of DTD cases so they can be repurposed

2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES: None

2.1 GOVERNMENT DOCUMENTS:

Document No. Date Title

3D Models 7/1/2026 Side A and Side B enclosures

2D Drawings 7/1/2026 Side A and Side B enclosures

2.3 GOVERNMENT FURNISHED EQUIPMENT:

Nomenclature Part Number Quantity Date Available

Case Side A MEA-204002 200 7/30/2026

Case Side B MEA-204003 200 7/30/2026

3.0 REQUIREMENTS: Supplier shall modify qty. 200 DTD enclosures from existing inventory per documentation provided to support the demands of the DTD project.

3.1 GENERAL REQUIREMENTS:

3.1.1 RESERVED

3.2 PROGRAM MANAGEMENT: The contractor shall perform administrative, technical, financial management, during the course of this effort and shall maintain a status of their effort towards achieving the CET objectives, including all technical activities and efforts, problems/deficiencies, impacts, and recommended solutions. (A001)

3.3 TASK REQUIREMENTS:

3.3.1 Modification of MEA-204002 Side A

3.3.1.1 The contractor shall modify ten (10) MEA-204002 Side A enclosure as per documentation supplied

3.3.1.2 The contractor shall deliver the units to DMEA for first article inspection

3.3.1.3 After the first articles are approved by DMEA, the contractor shall modify One-hundred and Ninety (190)

MEA-204002 Side A

3.3.2 Modification of MEA-204003 Side B

3.3.2.1 The contractor shall remove plastic frames from ten (10) MEA-204003 Side B. Retain frames for return to

DMEA upon completion of project

SOW PWS Template 2021 June.doc

3.3.2.2 The contractor shall modify ten (10) MEA-204003 Side B enclosure as per supplied documentation

3.3.2.3 The contractor shall deliver the units to DMEA for first article inspection

3.3.2.4 After the first articles are approved by DMEA, the contractor shall remove frames and modify One-hundred and Ninety (190) MEA-204003 Side B.

3.3.5 Delivery

3.3.5.1 The contractor shall provide shipping for all GFE

3.3.5.2 The contractor shall deliver all modified units to DMEA point of contacts called out in section 5.0.

3.3.5.3 The contractor shall deliver all plastic frames removed from MEA-204003 Side B to DMEA point of contacts called out in section 5.0.

3.4 PROGRAM SUMMARY: The contractor shall summarize all work accomplished under this CET, including significant technical accomplishments, problems encountered, solutions implemented, recommendations for improvement, and a comparison of planned schedules and costs with final performance.