PWS 2402361 2.14.25.pdf

PDF 426 KB Posted

Attached to
Overhaul of F-100-PW-220 #3 Bearing Air Seal NSN:2840005700773NZ
Solicitation number
FA812125R0016
Issued by

About this file

This document is a Performance Work Statement (PWS) for the overhaul of F100-220 No. 3 Bearing Air Seals, with National Stock Number 2840-00-570-0773 and Part Number 4036998. The PWS establishes minimum work requirements to return these air seals to a serviceable condition, including processes for overhauling, modifying, testing, preparing for storage, and shipping the components in accordance with specified technical orders and contract requirements.

Key technical requirements include cleaning the air seals per TO 2J-F100-13-7, performing inspections, controlling corrosion, implementing modification procedures, and identifying overhauled items with the contractor's CAGE code. The contractor must maintain an ISO-9001 quality system, investigate and address any Product Quality Deficiency Reports (PQDRs), and ensure no defective parts are delivered to the government. The PWS also outlines detailed provisions for product verification audits, supply chain risk management, continuity of operations, cybersecurity protocols, and surge production capabilities to support potential increased demand from the Department of Defense.

View the file

Other files

File Type Posted
QUALRQMT.pdf PDF
Pricing_Matrix_FA812125R0016.xlsx XLSX spreadsheet
Repair Data List.pdf PDF
Contract Repair SAW.pdf PDF
DI_TMSS_80229D.pdf PDF
Transportation Data.pdf PDF
DID_PSSS_81995.pdf PDF
ITMDESC_REPORT.pdf PDF
DID_80969.pdf PDF
DI_MGMT_80503.pdf PDF
CAV AF Reporting Requirements.docx DOCX document
DID_PSSS_81534A.pdf PDF
DI_NDTI-80809B.pdf PDF
DID_81838.pdf PDF
FA812125R0016.pdf PDF
Packaging Requirements.pdf PDF
RQR_PSD_1.pdf PDF
IUID Checklist.pdf PDF
DI_MGMT_80441C.pdf PDF
QAIRQMT_REPORT.pdf PDF
Government Furnished Property.xlsx XLSX spreadsheet
DI_PSSS_81535A.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD2030-24-02361

PERFORMANCE WORK STATEMENT (PWS)

For

F100-PW-100/200/220/220E No. 3 Bearing Air Seals

PR: FD2030-24-02361

DATE: 28 July 2024

PREPARING ORGANIZATION:

AFLCMC/LPSAAB

TINKER AFB OK 73145-3030

Warning –this document contains technical data whose export is restricted by the arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401, et seq. violation of these export-control laws is subject to severe criminal penalties.

Dissemination of this document is controlled under DoD Directive 5230.25

[Type here]

TABLE OF CONTENTS Page

SECTION I

1.1 DATA

1.2 SECURITY

1.3 QUALITY

1.4 DELIVERY SCHEDULES

1.5 CONDEMNATION AND OVERHAUL

1.6 HANDLING

1.7 INVENTORY

1.8 PRESERVATION

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

1.10 SAFETY AND HEALTH

1.11 GENERAL WORK REQUIREMENTS

1.12 SPECIFIC WORK REQUIREMENTS

1.13 APPLICABLE TECHNICAL ORDERS

1.14 APPLICABLE DIRECTIVES

1.15 APPLICABLE DOCUMENTS

1.16 MISSION ESSENTIAL SERVICES

SECTION II

2.1 SERVICE SUMMARY REQUIREMENTS

2.2 CONTRACTOR PERFORMANCE EVALUATION

SECTION III

3.1 GOVERNMENT PROPERTY

APPENDIX 1

A1.1 ACRONYMS

APPENDIX 2

A2.1 NOTES

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.2 TERMS EXPLAINED

A3.3 RESPONSIBILITIES

A3.4 AUDIT PROCEDURES

A3.5 AUDIT RESULTS

[Type here]

SECTION I

DESCRIPTION OF SERVICES

This PWS establishes the minimum work requirements to return F100 -220 No. 3 Bearing Air Seals listed below by National Stock Number (NSN) and Part Number (P/N) to a serviceable condition. F100 No. 3 Bearing Air Seals received by the contractor, as set forth in this contract shall be overhauled, modified, tested, prepared for storage and shipped in accordance with (IAW) the requirements in this PWS and the contract.

NOUN PART

NUMBER

NSN APPLICABLE

T.O.

No. 3 Bearing Air Seal 4036998 2840-00-570-0773 2J-F100-13-7

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal correspondence.

1.1 DATA

1.1.1 Reporting Requirements The contractor shall support a quality acceptance review by the DCMA representative at the site of repair for each end item generated under the terms of this contract.

1.1.1.1 Product Quality Deficiency Report (PQDR – SF 368): The contractor shall prepare a PQDR on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54. Applicable portions of TO 00-35D-54 relative to quality defects will apply. The contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative.

Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00-35D-54. The contractor shall furnish an information copy of the SF 368 to USAF F100 Engineering Source Authority listed in TO 2J-F100-13-1, WP 600 00.

1.1.1.2 TO System Publication Improvement Report (AFTO Form 22): The contractor shall prepare a PIR when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The contractor shall accomplish a PIR IAW TO 00-5-1 and submit one copy to AFLCMC/ENR. Minor discrepancies of non- technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc., shall not be reported. The contractor shall report omissions of pertinent technical data, correction of overhaul procedures in TOs, or desired changes to TO data shall likewise use the AFTO Form 22.

1.1.1.3 Teardown Deficiency Report (TDR): A TDR shall be accomplished on any

PQDR exhibit received for investigation. The report shall be completed IAW the procedures established on DD Form 1423 as set forth in the contract.

1.1.2 Other Records, Forms and Reports

1.1.2.1 The contractor shall make available to the appropriate ACO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete such other reports as may be required.

1.1.2.2 CAV AF End Item Production Report (End Item Activity Report): The report shall be completed IAW the procedures established on DD Form 1423, as set forth in the contract and the Appendix 2.

1.1.2.3 CEMS Reporting: N/A Note: The_F100 No.3 Bearing Air Seals are not serialized tracked parts, and therefore, CEMS reporting is not required in this contract.

1.1.2.4 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD- 129P, paragraph 5.2.21.a.

calendar. Contractors may direct questions to the CMRA help desk.

1.1.3 Technical Data

1.1.3.1 TOs listed in this specification are the basic directives to be used in accomplishing the overhaul requirements of the contract.

1.1.3.2 TO illustrated parts breakdowns (IPBs) listed in this PWS shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this PWS. Part replacement shall be confined to those parts determined to be required to produce a serviceable end item.

1.1.3.3 Directives listed in paragraphs 1.11, 1.12, 1.13 & 1.14 and instructions provided throughout this PWS shall be adhered to, thus obtaining the highest possible quality of workmanship and to maintain acceptable quality standards.

1.1.3.4 Instructions listed in this PWS as “Changes” or “Revisions” to a TO represent publication changes to the Technical Order System and shall be complied with.

The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.

1.1.3.5 In the event of a conflict between the instructions in this PWS and the applicable technical directive, the following order of override precedence applies (descending order): 1) this PWS, 2) the end item TO, 3) other technical directives.

1.2 SECURITY

1.2.1 Contractor’s Security Controls: Equipment and materials covered by this PWS are not classified.

1.3 QUALITY

1.3.1 The contractor shall provide and utilize an inspection/quality system IAW ISO - 9001.

1.3.2 The contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products overhauled by the contractor and/or their subcontractor or vendors. Sufficient priority shall be given to PQDR investigation to allow timely corrective action and to meet requirements of TO 00-35D-54 and the CDRL.

1.3.3 No defective parts shall be delivered to the Government.

1.4 DELIVERY SCHEDULES

1.4.1 The delivery schedules shall be IAW the contract delivery schedules.

1.5 CONDEMNATION AND OVERHAUL

1.5.1 Contractor’s Scrap Procedures: The contractor shall prepare and submit to the Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned parts containing critical alloys and/or precious metals shall by IAW TO 00-25-113, 00-25-153-F100-ENG and FAR

45.6 titled “Reporting, Reutilization, and Disposal”.

1.5.2 Condemnation: The contractor without written approval of the ACO shall not condemn End Items.

1.5.2.1 End Items determined by the contractor and verified by the ACO to be beyond economical overhaul shall be disposed of as directed by the ACO in writing.

1.5.2.2 Parts, which have been condemned as a result of NDI methods, other inspection methods, or for other reasons, shall be mutilated to the extent necessary to ensure that purchasers of scrap are unable to overhaul the item for possible resale or reuse. All documents and tags pertinent to such condemned parts authorized for transfer to disposal shall bear a certificate to the effect that all required mutilation has been accomplished and meets DEMIL directive requirements.

1.5.2.3 The serial number and part number of any life-limited item, which is condemned, must be transmitted to F100 Engineering Source Authority listed in TO 2J-F100-13-1, WP 600 00.

1.5.3 Overhaul: End Items determined to be beyond repair shall not be overhauled by the contractor unless authorized in writing by the ACO.

1.6 HANDLING

1.6.1 The contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.

1.6.1.1 CEMS Reporting: N/A Note: The_F100 No.3 Bearing Air Seals are not serialized tracked parts, and therefore, CEMS reporting is not required in this contract.

1.7 INVENTORY

1.7.1 Each end item shall be inspected by the contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO representative.

1.8 PRESERVATION

1.8.1 Preservation inspection of end items is not required upon receipt. Adequacy of preservation will be determined when the item is placed in work and if found deficient shall be reported to the appropriate ACO representative.

1.8.2 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements. Government owned items and parts shall not be co-mingled with non- Government owned property.

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

1.9.1 Any exhibit received for the purpose of an investigation into the cause of a material or a quality deficiency shall be kept separated from normal overhaul assets until the investigation is completed. The contractor shall provide the exhibit receipt date through the ACO with the F100 Engineering Source Authority listed in TO 2J-

F100-53-1, WP 600 00.

1.10 SAFETY AND HEALTH

1.10.1 While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the ACO Representative, within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

1.10.1.1 Mishap notifications shall contain, as a minimum, the following information:

1.10.1.1.1 Contract, Contract Number, Name and Title of Person(s) Reporting

1.10.1.1.2 Date, Time and exact location of accident/incident

1.10.1.1.3 Brief Narrative of accident/incident (Events leading to accident/ incident)

1.10.1.1.4 Cause of accident/incident, if known

1.10.1.1.5 Estimated cost of accident/incident (material and labor to repair/ replace)

1.10.1.1.6 Nomenclature of equipment and personnel involved in accident/ incident

1.10.1.1.7 Corrective actions (taken or proposed)

1.10.1.1.8 Other pertinent information

1.10.2 If requested by the designated GR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

1.11 GENERAL WORK REQUIREMENTS

1.11.1 The instructions for the overhaul of items stipulated in this PWS shall be performed IAW the applicable T.O.s and the below exceptions.

1.11.1.1 The contractor is authorized to inspect per part drawing and part QAD (Quality Assurance Document).

1.11.2 The contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items.

1.11.3 The contractor shall inspect the various disassembled components or part of the end item to determine if further overhaul is needed. Subsequent overhaul shall be accomplished IAW the applicable portion of the applicable overhaul technical order and supplementary instructions specified herein.

1.11.4 The contractor shall rework all reparable parts so that they are capable of meeting the serviceable requirements of this PWS.

1.11.5 The contractor shall continue to use all parts and assemblies determined serviceable and appropriate as a result of inspections and checks, except as specified in this PWS.

1.11.6 The contractor shall replace condemned parts of the end item with like serviceable parts that are listed in the applicable technical order IPB unless otherwise specified in or within this

PWS.

1.11.7 When overhaul kits are available for the overhaul of an end item, such kits shall be used IAW the applicable technical order and changes thereto or the specific instructions contained in this PWS.

1.11.8 Where the contractor is directed to hold an item for Air Force Life Cycle Management Center disposition by any cited publication herein or be any statement made within this PWS, such items shall be reported to the ACO through the GPA for disposition.

1.11.9 Overhaul, to the maximum extent, is desired when such overhaul is economically feasible.

The contractor is encouraged to submit new or improved overhaul procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this PWS or by any other means authorized under this contract. This does not preclude the contractor’s submission of overhaul procedures, which are not economically feasible, when such overhauls are advantageous to the Government.

1.11.10 All of the contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders and moralizers, shall be qualified and certified for operation IAW applicable military specifications when listed in the PWS.

1.11.11 Fit and tolerance limits shall be IAW applicable overhaul TO/contractor’s processes and procedures unless otherwise specified.

1.11.12 Fluids, oil, greases and compounds shall conform to and be used as directed in the overhaul TO and instructions contained in this PWS.

ITEM UNIQUE IDENTIFICATION (IUID)

1.11.13 Repair contracts that result in the delivery of tangible personal property to the Government shall follow the latest DoD instructions to install IUID compliant marks in accordance with policy as stated in DFARS 211.274. IUID requirements for the J85 MISTR components have not been identified at this time. When directed by the PCO, the contractor shall follow the latest DoD instructions to install IUID compliant marks. TOs and drawings will be complied with for any component where direction is currently called out in the TO or drawings.

1.12 SPECIFIC WORK REQUIREMENTS

1.12.1 Removal

1.12.1.1 Not Applicable.

1.12.2 Disassembly

1.12.2.1 Not Applicable

1.12.3 Cleaning

1.12.3.1 F100 No. 3 Bearing Air Seals shall be cleaned IAW TO 2J-F100-13-7, WP 20100.

1.12.3.2 The contractor shall ensure that cleaning and preserving materials meet the requirements specified in TO 2J-F100-13-1, TO 2J-F100-13-2 WP 005 00, or TO 2- 1-111 and that such materials are properly used during application.

1.12.4 Inspection

1.1.1.1 1.12.4.1 Inspection of F100 No. 3 Bearing Air Seals shall be accomplished IAW 2J-

F100-13-7 WP 336 00.

1.12.5 Corrosion Control

1.1.1.2 The corrosion control of F100 No. 3 Bearing Air Seals during overhaul and storage shall be accomplished IAW TO 2-1-111.

1.12.6 Modification and Overhaul

1.12.6.1 Overhaul of F100 No. 3 Bearing Air Seals shall be accomplished IAW 2J- F100-

13-7 WP 436 00.

1.12.6.2 The contractor shall identify all overhaul F100 No. 3 Bearing Air Seals with the contractor’s CAGE IAW MIL-STD-130N.

1.12.7 Installation

1.12.7.1 Not applicable.

1.12.8 Test and Government Acceptance

1.12.8.1 Inspect, test, and check each overhauled item IAW TO 2-1-111.

1.12.8.2 The Government shall accomplish acceptance.

1.12.9 Product Verification Audit (PVA)

1.12.9.1 Overhauled items shall be subject to PVA if requested by the government.

1.12.9.2 To perform PVA, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.

1.12.9.3 After notification by the ACO that a PVA is required, the contractor will follow the procedures of Appendix 3 - Product Verification Audit Procedures.

1.12.10 Technical Publication Compliance

1.12.10.1 Compliance with all TOs, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this PWS, when:

1.12.10.1.1 They have not been previously accomplished

1.12.10.1.2 They are pertinent to the end item.

1.12.10.1.3 They prescribe Air Force Policies, use of materials and procedures for overhaul.

1.12.10.2 For solicitation purposes, the contractor may contact USAF F100 Engineering Source Authority listed in TO 2J-F100-13-1, WP 600 00, for Instructions for viewing or purchasing technical data required for maintenance of this contract. Upon contract award, the contractor shall establish and maintain a TO distribution account IAW TO 00-5-2; and be placed on initial distribution for one copy each of the TO’s and TCTO’s listed in this PWS. The contractor shall contact AFLCMC/LPSA-TOMA, 405-734-8774 within five (5) working days after contract award for guidance in obtaining a TODO account.

Once the contractor’s TODO account is in operation, the contractor shall maintain all TO’s and TCTO’s and other technical directives listed in the PWS in an updated and current status IAW TO 00-5-1 and TO 00-5-2. The contractor is required to comply with the latest dated TO; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest TO revisions can be negotiated as to price and scheduled incorporation. The contractor shall submit a monthly review of changes to TO’s, TCTO’s, and other applicable directives received during that period. However, if a change is received that has a cost impact greater then 10% and/or is critical to safety of flight, the contractor shall notify the ACO within ten (10) working days of receipt of that change and also shall provide the cost impact with his backup data. The contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.

1.12.10.3 Copies of other Air Force publications required in the performance of work outlined in this PWS will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. TO 00-5-1 and TO 00-5-2 are provided in explanation of the Technical Order System and for pertinent distribution, requisition and storage information.

1.12.10.4 In the event a follow-on contract is awarded to this contract, the “Package File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new PWS of the new contract. This procedure will ensure continuity of the publication data from one contract to another.

1.12.11 Initial Production Evaluation (IPE)

1.12.11.1 Overhauled items shall be subject to an IPE if the contractor has not overhauled these items successfully within the last three years.

1.12.11.2 The IPE will be composed of two parts, a Site Visit and then a Repair Demonstration.

The contractor will have a 45 calendar day period from contract award to complete the Site Visit. After the site visit the DCMA QAR will have 10 calendar days to complete the site visit Survey and perform an exit briefing with the contractor and the IPE Team.

If necessary the contractor will have 30 calendar days from the Site Visit exit briefing to correct any critical or major deficiencies. Upon approval of the Site Visit Survey by the ESA the contractor will be notified in writing by the ACO. After notification of a successful Site Visit Survey by the ACO the contractor will have a 75 calendar day period to perform the Repair Demonstration part of the IPE. Upon completion of the Repair Demonstration and submission of the Repair Demonstration Report the ESA will have 30 calendar days to review the report. If necessary the contractor will have 30 calendar days to correct any critical or major deficiencies after the ESA review of the Repair Demonstration Report. Upon a successful Repair Demonstration and approval of the Repair Demonstration Report by the ESA the PCO will notify the contractor of the results. At this time the ESA will provide a letter to show that the contractor has been unconditionally approved to repair the contract items.

1.12.11.3 Overhaul of production items will not commence until the contractor has successfully passed the IPE and received the unconditional approval letter from the ESA. If the contractor cannot pass the Site Visit or the Repair Demonstration in the time periods allotted this constitutes contract cancellation.

1.11.11.4 To perform IPE, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials. The ESA may waive parts of the IPE as it deems appropriate.

1.13 APPLICABLE TECHNICAL ORDERS

This is a preliminary list of Technical Orders. The contractor is responsible for ensuring they are using the latest edition.

TECH ORDER BASIC CG CHANGE

NUMBER DATE NO DATE SHORT TITLE

00-5-1

15 Feb 19

AF TECH ORDER SYSTEM

00-5-15 29 Sep 17 0 TIME COMPLIANCE TECH

ORDER SYSTEM

00-20-1 6 Sep 19 0 PREV MAINT PROGRA

00-20-2 5 Sep 19 0 MAINT DATA DOCUMENTATION

00-20-3 1 Nov 08 13 21 Aug 17 MAINT PROCESSING OF

REPARABLE PROPERTY

00-25-113-F100-

ENG

1 May 19 0 CRITICAL ALLOY AND

PRECIOUS METAL

00-35D-54 1 Sep 15 0 MATERIAL DEFIENCY REPORT

AND INVESTIGATION SYSTEM

33B-1-1 1 Aug 19 0 NONDESTRUCTIVE INSPECTION

METHODS

2-1-111 15 Feb 90 70 1 Apr 18 STAND MAINT PROCEDURES

2J-F100-9 15 Jan 20 0 NONDESTRUCTIVE INSPECTION

2J-F100-94 1 Oct 19 0 IPB SUPPORT EQUIPMENT

2J-F100-13-1 1 Dec 19 0 MAINT INSTR-DEPOT

2J-F100-13-2 1 Oct 19 0 MAINT INSTR – DEPOT OCM

2J-F100-13-7 15 Sep 19 0 MAINT INSTR – DEPOT CORE

MODULE

2J-F100-24 1 Dec 19 0 IPB F100-PW-220/220E

00-25-254-1 15 May 19 0 SYS MANUAL

COMPREHENSIVE ENGINE

MGT. SYS. (CEMS)

1.14 APPLICABLE DIRECTIVES

MILITARY STANDARDS CHANGE DATE TITLE

MIL-STD-129P 19 SEP 07

W/CHANGE 4

U.S. MILITARY MARKING

FOR SHIPMENT AND

STORAGE

MIL-STD-130N 16 NOV 12

W/CHANGE 1

ID MARKING OF U.S.

MILITARY PROPERTY

INTERNATIONAL ORGANIZATION FOR STANDARIZATION (ISO)

ISO - 9001 15 NOV 08 QUALITY MGMT SYSTEMS –

REQUIREMENTS – 3RD EDITION

1.15 APPLICABLE DOCUMENTS

1.15.1 LPF-QR-001: BASIC TECHNICAL DATA REQUIREMENTS FOR

FRACTURE CRITICAL AND DURABILITY CRITICAL PARTS

1.15.2 LPF-QR-002: CONDITIONS OF WAIVER FOR FRACTURE CRITICAL

AND DURABILITY CRITICAL PARTS

1.15.3 LPF-QAR-001: GENERAL QUALITY ASSURANCE DOCUMENTS FOR F100

ENGINE FC/DC BREAKOUT COMPONENTS

1.15.4 LPF-QAR-002: CHANGE PROCEDURES FOR PROCESS

CONTROL DOCUMENTS

1.15.5 LPF-QAR-004: GENERAL QUALITY ASSURANCE REQUIREMENTS FOR

F100 ENGINE COMPONENTS

1.15.7 LPF-QAR-006: LPFR QUALITY ASSURANCE REQUIREMENTS

FOR PRODUCT VERIFICATION AUDIT (PVA) TEST PLANS AND

REPORTS

1.15.8 LPF-QPR-004: LPFR QUALITY PLAN REQUIREMENTS FOR

WELDED ASSEMBLIES

1.15.9 LPF-QPR-007: LPFR QUALITY PLAN REQUIREMENTS FOR

PLASMA SPRAYED COATINGS

1.15.10 LPF-QPR-009: LPFR QUALITY PLAN REQUIREMENTS FOR

VACUUM BRAZED ASSEMBLIES

1.15.11 LPF-QPR-016: LPFR QUALITY PLAN REQUIREMENTS FOR

DURABILITY CRITICAL PARTS

1.15.12 LPF-QPR-018: LPFR QUALITY PLAN REQUIREMENTS

FOR NONDESTRUCTIVE INSPECTION

1.15.13 EI FOR RQR-1: GENERIC ENGINEERING INSTRUCTIONS

FOR OVERHAUL OF F100 PARTS IN RQR-1

1.16 MISSION ESSENTIAL SERVICES N/A- Note: Not required in this contract.

SECTION II

SERVICE

SUMMARY

The contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. The contractor shall be aware that the absence contract requirement from the service summary does not detract from its enforceability nor limit the rights or remedies of the government under any other provision of the contract. The government will use the surveillance methods contained in the Surveillance Plan to evaluate the Contractor’s performance for the performance objectives listed below. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.

NOTE: For those requirements listed in Section II, Service Summary, the Surveillance Plan will follow the methods of surveillance specified in the Surveillance Plan. The Surveillance Plan is authorization for the Government’s PCO to participate in the administration of this contract.

2.1 SERVICE SUMMARY REQUIREMENTS

2.1.1 The contractor shall ensure the performance objectives and performance thresholds identified in table 2-1 of this PWS are achieved as follows:

Table 2-1

Performance Objective

Reference Paragraph

Performance Threshold

SS-1 Quality: PWS #s 1.3 No defective parts shall be delivered to the Government.

SS-2 Delivery Performance:

PWS # 1.4 The contractor shall meet the delivery schedule

2.2 CONTRACTOR PERFORMANCE EVALUATION

2.2.1 The contractor shall be aware that the evaluation of performance will occur when the

Program Manager evaluates the services of the contractor to determine whether or not it meets the performance measures of the contract.

2.2.1.1 SS-1: The contractor’s failure to meet the requirements for this item shall result in the possibility of a poor rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under Federal Acquisition Regulation (FAR) 52.246-4 Inspection of Services-Fixed Price.

2.2.1.2 SS-2: The contractor’s failure to meet this requirement shall result in a negative CPAR rating and remedies as allowed under FAR 52.246-4 Inspection of Services- Fixed Price.

SECTION III

GOVERNMENT

PROPERTY

3.1 GOVERNMENT PROPERTY

3.1.1 Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnish Material shall not be provided.

APPENDIX 1

A1.1 ACRONYMS

ACO Administrative Contracting Officer AFLCMC Air Force Life Cycle Maintenance Center AFMC Air Force Material Command ALC Air Logistics Center CAGE Contractor and Government Entity CAO Contract Administration Office CEMS Comprehensive Engine Management System DOD Department of Defense EC Engineering Change ESA Engineering Source Authority (AFLCMC/LPSAAB) FAR Federal Acquisition Regulation GFM Government Furnished Material GFP Government Furnished Property GPA Government Property Administrator IAW In Accordance With IPE Initial Production Evaluation IPB Illustrated Parts Breakdown MRB Material Review Board NDI Nondestructive Inspection OEM Original Equipment Manufacturer PCO Procurement Contracting Officer PIR Publication Improvement Report PQDR Product Quality Deficiency Report PVA Product Verification Audit PWS Performance Work Statement QAD Quality Assurance Document QAR Quality Assurance Representative QCD Quality Control Deficiency SAR Source Approval Request SL Salvage Layout SR Service Remanufacture TO Technical Order USAF United States Air Force WP Work Package

APPENDIX 2

A2.1 NOTES

A2.1.1 The contractor is authorized to establish and convene a Material Review Board (MRB) to evaluate and determine disposition on non-conforming material or parts. Board members shall consist of representatives from the Contractor’s Quality Production Control, Engineering (Industrial, Product Support or Design) and the Government QAR. The MRB shall be convened when the contractor identifies non- conformance of material or parts during and after assembly. The MRB is not authorized to violate any TO limit. When MRB action is required on material or parts during and after assembly, the contractor shall provide information, to include part number, serial number and statement of non-conformance and corrective action taken, to AFLCMC/LPSAA via email within (5) working days after approval of the MRB.

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.1.1 This attachment contains procedures and instructions for contractual accomplishment of Product Verification Audits (PVAs). This attachment does not supersede instructions contained in the contract overhaul work requirements or other contractual provisions. In instances of conflict, the latter applies. The contractual issuance of this attachment and performance of PVAs does not relieve the contractor of the responsibility for maintaining a Quality Control System that will assure productions of items that conform to contractual requirements. PVAs are management tools used to independently evaluate and validate the conformance of an overhauled item and contractor compliance to contractual requirements as well as the adequacy of the Government's contractually stipulated requirements.

A3.2 TERMS EXPLAINED

A3.2.1 PVA. The physical examination, functional testing and complete disassembly of an item to determine conformance to contractual requirements as well as adequacy of the contractual requirements which may require in excess of the original contractor overhaul effort. The audit includes correction of defects, reassembly, retesting, repackaging, remarking, update of records and correction of contractual requirements as required.

A3.2.2 Cognizant Quality Assurance Element. The DOD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the contractor's plant.

A3.2.3 Overhaul Work Requirement. Any contract instrument, TO, drawing, specification or directive which contains instructions and requirements for overhaul and rehabilitation of a reparable/unserviceable item.

A3.2.4 Procedural Deficiency. A deficiency which is noted during the audit and which results from either:

A3.2.4.1 Failure by contractor to establish processes/procedures in conformity with contractual requirements; or, A3.2.4.2 Failure by contractor to follow established processes or procedures.

A3.3 RESPONSIBILITIES

A3.3.1 The Contractor shall:

A3.3.1.1 Perform audit functions under the surveillance of the cognizant DOD CAO and Air Force Life Cycle Maintenance Center (AFLCMC) representative(s).

A3.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the PVA.

A3.3.2 The Cognizant DOD QAR shall:

A3.3.2.1 Be designated as audit team chairman, unless otherwise directed by the Procuring Contracting Officer (PCO).

A3.3.2.2 Schedule the product verification audit and select the item(s) to be audited.

A3.3.2.3 Notify the PCO and the contractor when the PVA will begin. Notification shall be provided at least 15 working days prior to the audit date. Scheduled audits may be waived by the PCO on a case-by-case basis.

A3.4 AUDIT PROCEDURES

A3.4.1 Classifying Defects. Defects observed in the audited item(s) will be classified according to the following:

A3.4.1.1 Category I - Critical Defect. Defect that judgment and experience indicates likely to result in hazardous/unsafe conditions for individuals using, maintaining or depending upon the product; or a defect that judgment and experience indicates is likely to prevent performance of the tactical function of a major end item such as an aircraft, engine communication system, surveillance system or major part thereof. Critical defects are furthered identified as follows:

A3.4.1.1.1 Category IA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.1.2 Category IB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirement or defective Government Furnished Property(GFP).

A3.4.1.2 Category II - Major Defect. Defect other than critical that is likely to result in failure or reduce materially the usability of unit or product for its intended purpose. Major defects are further identified as follows:

A3.4.1.2.1 Category IIA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.2.2 Category IIB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirements or defective GFP.

A3.4.1.3 Category III - Minor Defect. Defect that is not likely to reduce materially the usability of the unit or product for its intended purposes or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects are further identified as follows:

A3.4.1.3.1 Category IIIA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.3.2 Category IIIB - Defect not attributable to the contractor.

A3.4.1.4 Category IV - Defect caused during accomplishment of the audit disassembly or inspection process which would not have occurred had the contractor exercised proper care of the audit item, i.e., improper handling, improper disassembly technique.

A3.4.1.5 Procedural Defect – Reference paragraph A3.2.4.

A3.4.2 Scheduling/Frequency

A3.4.2.1 During the initial production phase, one of the first five items may be audited. The frequency for performing subsequent audits will be as specified in the schedule of the contract or by the PCO.

A3.4.2.2 The contractor may be directed by the PCO to extend or increase the frequency of the audits or to increase or decrease the scope thereof pursuant to the "changes" clause of the contract.

A3.4.2.3 Like or similar items may be grouped for audit purposes when the concurrence of the PCO or his designated representative has been obtained.

A3.4.3 Inspection and Test

A3.4.3.1 Audit candidates shall be randomly selected by the Cognizant DOD QAR from all items currently available. It shall be the responsibility of the ACO to assure that an adequate number of items from which a random selection can be made are on hand at the time of the audit. Selection, except as specified in paragraph A3.4.3.2 below, shall be made from items which have been accepted by the Government but have not been shipped.

A3.4.3.2 The first five items of the initial production phase shall be set aside after having been tendered by the contractor as in conformity with the contract and inspected by the Government and not rejected for failure to comply with contractual requirements. Upon completing the testing and disassembly portion of the audit of the selected candidate and if no Category I or II defects are found during the audit, the other four items will be accepted by the Government. In any Category I or II defect is found in the audit candidate, the contractor shall satisfy the Government that such defect does not exist in the other four items prior to Government acceptance thereof. The audit candidate shall be accepted by the Government upon compliance with paragraph A3.4.4.6 below.

A3.4.3.3 The items selected for audit shall be inspected for adherence to preservation, packing, packaging and marking requirements prior to removal from the shipping container.

A visual inspection and functional test shall be performed prior to disassembly.

A3.4.3.4 Disassembly shall be performed in a secure area accessible only to audit participants.

Normally, audit participation will be limited to specified contractor production and quality control personnel, the Cognizant DOD QAR and AFLCMC personnel.

A3.4.3.5 Visual inspection, dimensional checks (such as backlash, end clearance and running clearance) and non-destructive testing will be accomplished during and after disassembly IAW applicable technical directives. Audit findings will be recorded for comparison with contractual requirements and the contractor's production/inspection records. Measuring and test equipment shall be reviewed for current calibration prior to use.

A3.4.3.6 Applicable accessories and components will be functionally tested and inspected to contractual specifications. This action may require disassembly in excess of the original contractor effort as determined necessary by the Government.

A3.4.4 Corrective Actions

A3.4.4.1 In the event a critical or major defect is observed, Government acceptance of further production will be withheld until the Government has either inspected other items for the observed defect(s) or has received suitable evidence from the contractor that the cause of such defect(s) has been corrected and the defect does not exist in other items. In the case where there is a probability of such defect existing in previously shipped items, the contractor will promptly advise the Government of the identity and destination of such previously shipped items.

A3.4.4.2 When Category IA, IIA or IIIA defects are found, the contractor shall implement measures in the overhaul process which will preclude recurrence.

A3.4.4.3 When Category IB, IIB or IIIB defects are found, actions will be taken as directed by the Government pursuant to the contract.

A3.4.4.4 When Category IV defects are noted, the contractor shall take those actions necessary to preclude recurrence.

A3.4.4.5 When Procedural Deficiencies are noted, the contractor shall take those actions necessary to correct the procedures or operations concerned.

A3.4.4.6 Upon completion of the audit, all defects attributable to failure to comply with contractual requirements or attributable to the performance of the PVA shall be corrected. All noted defects shall be corrected and the item assembled and functionally tested IAW applicable overhaul specifications including preservation, packing, packaging, marking and update of records.

A3.4.4.7 After the audit is completed, the DOD QAR shall conduct a critique attended by contractor personnel and AFLCMC representative(s). Findings, classifications and corrective actions shall be discussed and determination of defect cause(s) established (e.g. workmanship, tooling, technical requirements, etc.). The contractor shall take immediate action to correct and preclude recurrence of all defects or deficiencies attributable to failure to comply with contractual requirements, subject to the provisions of paragraph A3.5.1.10 below.

A3.5 AUDIT RESULTS

A3.5.1 The quality office of the CAO activity shall prepare and forward to the responsible

PCO the finalized audit findings within 10 working days after completion of the audit. Finalized findings will contain the following information:

A3.5.1.1 Name and address of contractor.

A3.5.1.2 Contract number.

A3.5.1.3 Descriptive noun, Federal Stock Number, part number and serial number of the item audited.

A3.5.1.4 Summary of total defects.

A3.5.1.4.1 Category IA

A3.5.1.4.2 Category IB

A3.5.1.4.3 Category IIA

A3.5.1.4.4 Category IIB

A3.5.1.4.5 Category IIIA

A3.5.1.4.6 Category IIIB

A3.5.1.4.7 Category IV

A3.5.1.5 A complete listing of audit findings.

A3.5.1.6 A description of defects listed by category (commencing with critical). The defective item will be identified by part number and standard nomenclature.

A3.5.1.7 Cause(s) for each noted defect.

A3.5.1.8 Corrective action(s) taken on each classified defect attributable to failure to comply with contractual requirements, or a projected target date for completion when not otherwise immediately corrected.

A3.5.1.9 Procedural deficiencies noted and the corrective actions applied.

A3.5.1.10 The signature of the DOD QA participants, contractor management personnel and AFLCMC representative(s). Non-concurrence with the findings shall be specifically annotated in the vicinity of the applicable signatures. Non- concurrence by the contractor as to the existence or classification of a defect or as to whether or not a defect is attributable to failure to comply with contractual requirements shall be subject to the procedures set forth in the clause entitled "Dispute.

APPENDIX 4

A4.1 Supply Chain Risk Management

1. The contractor shall identify, assess, plan for, and mitigate actual or potential threats, vulnerabilities, and disruptions to the Air Force's supply chain throughout the lifecycle to ensure mission effectiveness. The contractor shall inform and include the Government in any mitigations or alterations to the program. The SCRM plan shall address the broad spectrum of supply chain risks that have the potential to: jeopardize the integrity of products, services, people, and technologies; compromise intellectual property; disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations; and drive materiel cost increases to the program. The contractor shall develop and execute processes for identifying supply chain risks as early as possible; the persistent and comprehensive tracking, monitoring, and re-evaluation of supply chain risks and their corresponding mitigation actions;

and communicating supply chain risks to affected stakeholders and the Government. The contractor shall notify in writing the identified actual and potential supply chain risks. The contractor's SCRM program and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product and/or service. As part of the overall SCRM approach, the Contractor shall establish, document and maintain documentation about subcontractors/vendors for all parts that will be used for Government contracts. The contractor shall continuously monitor their sources of supply for unknown, unauthorized, non-certified, or unqualified sources providing parts or services from any sub-tier supplier within the contractor's supply chain. The contractor shall investigate and submit findings to include root causes, impacts and a corrective action.

2. Continuity of Operations (COOP)

3. Contractor shall include a SCRM plan detailing the offeror's supply chain risk management approach, providing specific emphasis on the risks associated with a.) Continuity of Operations b.) Foreign Influence and c.) Cybersecurity. The contractor shall detail the specific supply chain risk (listed below) and provide a management and mitigation plan identifying how the offeror will ensure Supply Chain Risk Management is effective over the life of the contract.

4. The contractor will develop and/or update a Continuity of Operations Plan (COOP), also known as a Business Operations Plan, which outlines the processes and actions to prepare for, and respond to, unplanned natural and man-made disruptions to mission essential operations and provide that to the U.S. Government. The COOP will address disruptions caused by:

a) natural causes possible in the local vicinity (winter weather, earthquakes, hurricanes, fires, flooding, wind, pandemics, etc.) and

b) man-made causes (cyber attacks, electrical outages, strikes affecting workforce, civil unrest, modes of transportation, and receiving/shipping goods, etc.).

5. The plan will explain:

6. how work will continue in the same or alternate facility(ies),

7. ability to use and/or augment the current workforce,

8. ability to repair/restore key infrastructure (machinery, computers, logistics etc.),

9. how to communicate with, and inform the US Government and others in the supply chain.

10. Contractor shall provide essential records management for personnel working on U.S.

government contracts. Records will be accessible to key members of the organization.

Contractor shall ensure continuous records management support (training, etc.) despite any changes in personnel.

11. If applicable the contractor shall prepare for the continuation of essential DoD services during crisis IAW DFARS 252.237-7023, DFARS 252.237-7024, and other applicable references as necessary. In a state of emergency, if the Government deems necessary, the contractor shall provide all services necessary to ensure mission accomplishment. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours.

12. Foreign Influence

13. The contractor shall disclose any Foreign Ownership, Control or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest shall be submitted to the Government cognizant security office specified in each DD254.

14. The contractor shall provide information regarding FOCI. If the contract requires access to classified information, DD254, Contract Security Classification Specification, shall be required. Contractor shall provide an update on its financial health and potential FOCI when a merger or acquisition occurs.

15. Foreign contractor participation is excluded at the prime and subcontractor level, unless authorized through a current approved National Interest Determination (NID). It is solely the responsibility of the contractor to obtain necessary certification from the U.S. Department of State and to comply with the federal laws and regulations. Question must be directed to the U.

S. Department of State’s Directive of Defense Trade Controls.

16. Subcontract Management. The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team only after notification to the Procuring Contracting Officer (PCO).

17. Foreign Disclosure: "Foreign Disclosure Restrictions do not apply."

18. Cybersecurity

19. The contractor shall develop and implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. The contractor shall conduct early and continuous monitoring throughout the contract to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology. The contractor's plan shall: a) make specific reference to those aspects of the National Institute of Standards and Technology Special Publication (NIST SP) 800-161, “Supply Chain Risk Management Practices for Federal Information Systems and Organizations” that represent the contractor's implemented

20. processes and practices; b) include a description of how the contractor shall protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data,

21. interrupt communications, or otherwise disrupt operations; c) inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to contractor’s digital information and parts and components and d) make specific reference to those aspects of NIST SP 800-53 that represent the processes and practices the contractor will implement. The plan and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product.

22. The Contractor and any subcontractors shall provide to the government a system security plan (or extract thereof) and any associated plans of action developed to satisfy the adequate security requirements of DFARS 252.204-7012, and in accordance with NIST Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits. The contractor shall {develop, update} an incident-handling capability plan that utilizes guidance provided in NIST SP 800-61 revision 2, Computer Security Incident Handling Guide, consisting of 1) incident response policy and plan, 2) procedures for performing incident handling and reporting, 3) guidelines for communicating with outside parties regarding incidents, 4) incident team structure and staffing model, 5) relationships and lines of communication between the incident response team and other groups, both internal and external, 6) services the incident response team should provide, and 7) staffing and training the incident response team. Any incident reported to Defense Industrial Base Cybersecurity Program (https:\\dibnet.dod.mil) shall also be reported to the responsible contracting officer within 24 business hours.

23. Cybersecurity (electronic components - FSG 59, with the exception of those that do NOT contain any programmable components) N/A

24. The contractor shall provide information to obtain a Defense Intelligence Agency – Threat Assessment Center (DIA-TAC) Report when National Critical Materials and Critical Components (CC) are known based on the Functional Thread Analysis. The contractor shall trace the Bill of Materials to the lowest critical components. The contractor shall update design via system engineering processes to ensure above-medium risk components are not in the system.

25. The contractor shall ensure all hardware, with special emphasis on lowest…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .