PWPG-5-DW-AST-302-001-R2.pdf

PDF 129 KB Posted

Attached to
Furnishing and Delivering of Ammonium Hydroxide for Glenarm Power Plant
Solicitation number
2023-IFB-MS-634
Issued by
Los Angeles County, California

About this file

This document is a Piping and Instrumentation Diagram (P&ID) for the Aqueous Ammonia System for the Glenarm Repowering Project, prepared by WorleyParsons for the City of Pasadena Water & Power Department. The diagram details the final configuration of the ammonia handling infrastructure, including an existing ammonia storage tank (B3) with 11,890 gallons capacity, two ammonia forwarding pumps (Pump A and Pump B), each with a capacity of 190 lb/hr, 1/2 HP motors, and a total dynamic head of 16 ft. The system includes multiple valves, flow indicators, pressure switches, and safety features such as excess flow limiting valves and double-contained buried piping with leak detection provisions.

The technical specifications indicate the ammonia system is designed to support the Selective Catalytic Reduction (SCR) systems of five natural gas-fired combustion turbines at the Glenarm Power Plant. Key technical requirements include meeting ECM requirements for transfer pumps, replacing existing instruments on the storage tank, and specific piping and valve configurations. The diagram provides comprehensive details on system connections, flow rates, pressures, and temperatures, with notes specifying technical standards, numbering procedures, and installation guidelines. The document is marked as an "as-built" drawing, indicating it represents the final installed configuration of the ammonia handling system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWP

AST

PI

1020-1

AST

PI

1020-2

AST

PS

1020-2

AST

PS

1020-1

FILL LINE

AQUEOUS AMMONIA

GT 3/4 TANK

AQUEOUS AMMONIA

HRS-302-001

AQUEOUS AMMONIA

AMMONIA

VAPORIZATION SKID

AMMONIA VAPOR

EXISTING VAPOR

RECOVERY/VENT LINES

9. EACH AMMONIA TRANSFER PUMP SHALL MEET THE ECM

REQUIREMENTS OF THE OTSG.

10. AQUEOUS AMMONIA TRANSFER PUMP DISCHARGE SHALL BE

PROVIDED WITH EXCESS FLOW LIMITING VALVE.

11. ALL INSTRUMENTS ON THE EXISTING B-3 AMMONIA STORAGE TANK

TO BE REPLACED WITH NEW INSTRUMENTS BY THE BOP

CONTRACTOR.

12. PIPING IS INSTALLED DURING CONTRUCTION OF INTERIM

CONFIGURATION.

8. BURIED AMMONIA PIPING SHALL BE DOUBLE CONTAINED

WITH PROVISION FOR LEAK DETECTION.

PWP

PWP

NOTES (CONT.):

13. VALVE IS EXISTING.

14. AG/UG INTERFACE SHALL BE LOCATED IN PIPE PIT FOR GLENARM

BROADWAY TUNNEL.

5-AST-1006-0.5"-15D1-N

3"x2"

2"x1.5"

BV-1020-20

BV-1020-18

5-AST-1001-0.5"-15D1-N

JO

NONE

JO

JO

AW

NOTES:

1. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS, SEE

DRAWINGS PWPG-5-DW-012-302-001, -002, -003, -004.

2. SYSTEM CODE FOR VALVES AND PIPING SPECIALTIES IS THE SAME AS

THE ASSOCIATED PIPING DESIGNATION.

3. ALL VALVE AND PIPING COMPONENT ITEM NUMBERS ARE PREFIXED

WITH "5-SYSTEM CODE" UNLESS OTHERWISE NOTED.

4. ALL LOCAL VENTS AND DRAINS TO HAVE A 4” LONG NIPPLE THREADED

ONE END TERMINATED LOCALLY UNLESS OTHERWISE NOTED.

5. ALL INSTRUMENTS ROOT VALVES ARE 0.75” AND VENT AND DRAINS

ARE 1” UNLESS OTHERWISE NOTED.

6. REFER TO DESIGN PROCEDURE PWPG-5-DB-012-0002 FOR UNIVERSAL

NUMBERING PROCEDURES.

7. FLOW RATES SHOWN ARE MAXIMUM UNLESS OTHERWISE NOTED.

FLOW RATES ARE NOT NECESSARILY ADDITIVE.

MARC PELLETIER

M P

A

W JOM

C

A

WAS-BUILT2 02/16/16

M P

A

W JOM

C

JOA

WISSUED FOR CONSTRUCTION1 11/23/15

M P

A

W JOM

C

JOA

WISSUED FOR CONSTRUCTION0 11/11/15

10/17/2014MT

JO

JO

AW

/1

6/

3:

:3

P

MAQUEOUS AMMONIA SYSTEM

(FINAL CONFIGURATION)

2PWPG-5-DW-AST-302-001

PIPING & INSTRUMENTATION DIAGRAM

5-AST-1005-0.5"-15D1-N

BV-1020-17

UV-1020-3

AST

PRV

1020-2

AST

PSV

1020-1

AST

PSV

1020-2

5-AST-1003-0.5"-15D15-N

5-AST-DV-1007-1

AST-TNK-1010

EXISTING AMMONIA STORAGE TANK (B3)

BV-1020-19

AST

PRV

1020-3

AST-PMP-1020A

AMMONIA FORWARDING PUMP A

AST-PMP-1020B

AMMONIA FORWARDING PUMP B

AST-TNK-1010

EXISTING AMMONIA STORAGE TANK (B3)

FR 190 lbm/hr

50 psig | 125 F

7 psig | 80 F

FR 190 lbm/hr

50 psig | 125 F

1 psig | 80 F

FR 190 lbm/hr

50 psig | 125 F

7 psig | 80 F

1 X 100%

CAPACITY: 190 LB/HR

TDH: 16 FT

MOTOR: 1/2 HP

1 X 100%

CAPACITY: 190 LB/HR

TDH: 16 FT

MOTOR: 1/2 HP

AST-PMP-1020A

AMMONIA FORWARDING PUMP A

AST-PMP-1020B

AMMONIA FORWARDING PUMP B

AST

PRV

1020-1

AST

ABV

9961-1

FC

5-AST-1007-3"-15D1-N

AST-ZXX-1020

AMMONIA FORWARDING PUMPS SKID

L L

AST-ZXX-1020

LO

LO

BV-1020-3

BV-1

0-

BV-1

0-

BV-1020-11

BV-1020-4

BV-1020-2

UV-1020-2

UV-1020-1

UV-1020-4

BV-1020-9

UV-1020-5

BV-1020-10

BV-1020-6

BV-1020-16

BV-1020-1

12345678910

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

SCALE

REV

CLIENT/PROJECT TITLE

WORLEYPARSONS DWG. NO.

ANSI D (34" x 22")

DRAWING SIZE

PE:

DATE:

ORIGINALLY PREPARED UNDER THE RESPONSIBLE SUPERVISION OF

LIC. NO.:

STATE:

PROJECT ENGINEERING MANAGER

DRAWN BY

CHECKED BY

LEAD DESIGNER

LDE

REPRESENTS REVIEWED AND APPROVED

DESIGN. ANY PORTION MARKED "HOLD"

RETAINS PRELIMINARY STATUS.

DATE

LDE

DATEPRELIMINARY STATUS

APPROVED STATUS

PROFESSIONAL ENGINEER'S SEALORIGINATING PERSONNEL

REV DATE DESCRIPTION

D R

A W

N

D E

S

IG

N E

R

L E

A D

C H

E C

K E

D

E N

G

IN

E E

R

L E

A D

D

IS

C

M A

N A

G E

R

P R

O J

E N

G R

ENGINEER/TECH SPECIALIST

T E

C H

S

P E

C

E N

G

IN

E E

R

12345678910

FOR CONSTRUCTION.

INFORMATION ONLY - NOT TO BE USED

R E

V

IE

W E

D

GLENARM REPOWERING PROJECT

Copyright C

WorleyParsons Services Pty Ltd

BV-1020-14

BV-1020-15

BV-1020-5

BV-1020-8

V

B V

-1

0-

D

NC

BV-1021-1

2"

AG UG

1"x0.5"

AST

ABV

1007-1

F C

PWP

5-AST

FI

1020-2

5-AST

FI

1020-1

AST

PS

1020-3

H

B V

-1

0-

AM9007-3"-EC2Q

AM9001-3"-EC2Q

AM9008-1.5"-EC2Q

AM9007-3"-EC2Q

XV-961

5-AST-1020-0.5"-15D1-N

3"x0.5"

AM9007-3"-ECQ2

MC

1633 AM9002-1.5"-EC2Q

AM9002-1.5"-EC2Q

5-AST-9008-1.5"-15D1-N

5-AST-DV-9008-1

11,890 GALLONS

V

D

BV-1006-2

BV-1006-1

NC

NC

0.5"

0.5"

B V

-1

0-

V

NC

0.5"

D

NC

B V

-1

5-

0.5"

0.5"

BV-1005-2

NC

V

2"x0.5"

BV-1001-1

NC

0.5"

V

5-AST-1010-3"-15D1-N

3"x1"

File details come from the government source that posted it. Updated .