PWC 23-11_Aug_23_24_solicitation_doc.pdf
PDF 15 KB Posted
- Attached to
- ON-CALL WASTEWATER ENGINEERING SERVICES
- Solicitation number
- PWC 23-11
- Issued by
- New London County, Connecticut
About this file
This document is a Request for Qualifications (RFQA) issued by the Town of Groton Public Works Department for ON-CALL WASTEWATER ENGINEERING SERVICES. The Town is seeking statements of qualifications from professional engineering firms to provide these services, which will be relative to the operation of the Town's 7.5 MGD secondary treatment water pollution control facility and associated 136-mile collection system with 22 pump stations. The RFQA has a solicitation period from December 8, 2022 to January 19, 2023, with a vendor Q&A period from December 8, 2022 to January 5, 2023. The selected firms will provide on-call engineering services to the Town as needed.
The RFQA does not specify any pricing terms or set-asides. It also does not mention any incumbent providers or funding sources. The total estimated value of the contract is not provided.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: PWC 23-11
ON-CALL WASTEWATER ENGINEERING SERVICES
Request for Qualifications (RFQA)
Groton, Town of
December 08, 2022 - January 19, 2023
Page:2
General Header Information
This bid has no questions defined.
PWC 23-11
No. PWC 23-11 Title: ON-CALL WASTEWATER ENGINEERING SERVICES Start Date: December 08, 2022 at 1:00:00 PM EST End Date: January 19, 2023 at 2:00:00 PM EST Vendor Q&A Start Date: December 08, 2022 at 1:15:00 PM EST Vendor Q&A End Date: January 05, 2023 at 1:45:00 PM EST Estimated Total Value:
Who can respond to this bid? : All Vendors Description: THE TOWN OF GROTON PUBLIC WORKS DEPARTMENT IS
SOLICITING STATEMENT OF QUALIFICATION FROM
PROFESSIONAL ENGINEERING FIRMS TO PROVIDE ON-CALL
WASTEWATER ENGINEERING SERVICES. THESE SERVICES WILL
BE RELATIVE TO THE OPERATION OF THE WATER POLLUTION
CONTROL FACILITY AND ACCOCIATED SYSTEMS. THE TOWN'S
WATER POLLUTION CONTROL FACILITY IS A PERMITTED 7.5 MGD
SECONDARY TREATMENT SYSTEM. THE COLLECTION SYSTEM
CONSISTS OF 136 MILES OF PIPE AND 22 PUMP STATIONS.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: Groton, Town of
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax:
kklein@groton-ct.gov
Contact Details: If you have any questions, please contact:
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax:
kklein@groton-ct.gov
Selected Categories:
Page:3
Documents:
RFQoncallWastewaterEngServ.pdf
Page:4
Item Specifications Solicitation has been designated as having no line items.
Page:5
File details come from the government source that posted it. Updated .