This is a bid tabulation report from Marion County Public Works for Contract #2025-202, Project #1 - Shaff Road ADA Sidewalk Ramps project. The project includes construction of ADA compliant sidewalk ramps, curbs, gutters, concrete walks, pavement repair, traffic control, and related improvements. Key quantities include 1,900 square feet of concrete walks, 405 linear feet of concrete curbs and gutters, 145 square yards of asphalt pavement repair, 11 curb ramps, and 110 square feet of truncated domes. The bid opening occurred on December 4, 2024 at 2:00 PM at the Marion County Public Works Building in Salem, Oregon.
The bid tabulation shows 14 contractors submitted bids ranging from $155,598.00 (Civil West Construction, LLC) to $286,650.00 (KNL Industries, Inc). Other major bid items included mobilization ($15,000-$35,000), temporary traffic control ($3,780-$25,000), and removal of structures/obstructions ($2,700-$28,000). All bidders submitted required documentation including bid schedules, certificates, bid bonds, drug & alcohol certifications, and first tier subcontractor forms. The project appears to be locally funded through Marion County Public Works with no apparent set-asides or special funding requirements noted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL WEST
CONSTRUCTION,
LLC
DALKE
CONSTRUCTION
D&D CONCRETE
AND UTILITIES INC
TURNEY
EXCAVATING INC
EMERY & SONS
CONSTRUCTION
INC
QUANTITY TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE
12-04-2024 Page 1
2025-202CONTRACT #:
Marion County Public Works Contract Bid Detail Report - E
1PROJECT #:
SHAFF ROAD ADA SIDEWALK RAMPS
1PROJECT #: 0
1.00 15000.000 15000.00 18700.000 18700.0018000.000 18000.0020000.000 20000.0033858.000 33858.00MOBILIZATION210.100
1.00 10000.000 10000.00 4000.000 4000.008000.000 8000.003780.000 3780.007046.100 7046.10TEMPORARY WORK ZONE
TRAFFIC CONTROL, COMPLETE
225.025
2.00 750.000 1500.00 1900.000 3800.002000.000 4000.00972.000 1944.003397.200 6794.40PORTABLE CHANGEABLE
MESSAGE SIGNS
225.450
120.00 75.000 9000.00 89.000 10680.0070.000 8400.0077.760 9331.20130.000 15600.00FLAGGERS225.490
1.00 400.000 400.00 3500.000 3500.001000.000 1000.001080.000 1080.00433.200 433.20EROSION CONTROL280.100
3.00 60.000 180.00 170.000 510.00100.000 300.00270.000 810.0053.850 161.55INLET PROTECTION, TYPE 3280.193
1.00 400.000 400.00 360.000 360.001000.000 1000.00864.000 864.001073.800 1073.80CONCRETE WASHOUT FACILITY280.255
1.00 300.000 300.00 345.000 345.00500.000 500.002160.000 2160.00171.000 171.00POLLUTION CONTROL PLAN290.100
1.00 15000.000 15000.00 9250.000 9250.0020000.000 20000.002700.000 2700.0012207.120 12207.12REMOVAL OF STRUCTURES AND
OBSTRUCTIONS
310.100
360.00 3.000 1080.00 4.250 1530.006.000 2160.008.100 2916.003.310 1191.60ASPHALT PAVEMENT SAW
CUTTING
310.560
1.00 550.000 550.00 1500.000 1500.003000.000 3000.003780.000 3780.00855.000 855.00CLEARING AND GRUBBING 320.100
2.00 950.000 1900.00 765.000 1530.001000.000 2000.00378.000 756.00421.800 843.60ADJUSTING CATCH BASINS490.205
3.00 350.000 1050.00 275.000 825.00400.000 1200.00540.000 1620.0026.600 79.80ADJUST BOXES490.300
145.00 30.000 4350.00 20.000 2900.0020.000 2900.00165.240 23959.8067.630 9806.356 INCH ASPHALT CONCRETE
PAVEMENT REPAIR
542.115
100.00 31.000 3100.00 81.000 8100.0050.000 5000.00140.400 14040.0083.070 8307.001''-0 AGGREGATE BASE641.100
60.00 215.000 12900.00 220.000 13200.00300.000 18000.00270.000 16200.0086.240 5174.40COMMERCIAL ASPHALT
CONCRETE PAVEMENT
740.100
160.00 60.000 9600.00 65.000 10400.0060.000 9600.0043.200 6912.0042.110 6737.60CONCRETE CURBS, CURB AND
GUTTER
759.100
245.00 53.000 12985.00 46.500 11392.5060.000 14700.0030.240 7408.8036.860 9030.70CONCRETE CURBS, STANDARD759.120
11.00 1300.000 14300.00 2625.000 28875.001000.000 11000.00324.000 3564.001079.370 11873.07EXTRA FOR CURB RAMPS759.133
1900.00 14.250 27075.00 17.250 32775.0020.000 38000.0018.360 34884.005.790 11001.00CONCRETE WALKS759.250
110.00 53.000 5830.00 60.500 6655.0040.000 4400.0034.560 3801.6092.420 10166.20TRUNCATED DOMES ON NEW
SURFACE
759.431
30.00 32.000 960.00 31.250 937.5030.000 900.0012.420 372.60136.800 4104.00PAVEMENT BAR, TYPE B-HS867.302
1.00 550.000 550.00 1500.000 1500.001000.000 1000.001080.000 1080.00342.000 342.00REMOVE AND REINSTALL
EXISTING SIGNS
905.150
24.00 22.000 528.00 24.000 576.0010.000 240.0021.600 518.405.700 136.80WOOD SIGN POSTS910.100
20.00 43.000 860.00 43.000 860.0060.000 1200.00135.000 2700.007.800 156.00SIGNS, STANDARD SHEETING, SHEET ALUMINUM
940.620
1.00 2200.000 2200.00 2300.000 2300.003000.000 3000.001620.000 1620.001559.520 1559.52RESTORE EXISTING
LANDSCAPING
1030.700
CONTRACT #: 2025-202 PROJECT #: 1 SHAFF ROAD ADA SIDEWALK RAMPS
CIVIL WEST
CONSTRUCTION,
LLC
DALKE
CONSTRUCTION
D&D CONCRETE
AND UTILITIES INC
TURNEY
EXCAVATING INC
EMERY & SONS
CONSTRUCTION
INC
QUANTITY TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE
12-04-2024 Page 2
2025-202CONTRACT #:
Marion County Public Works Contract Bid Detail Report - E
1PROJECT #:
SHAFF ROAD ADA SIDEWALK RAMPS
1PROJECT #: 0
85.00 20.000 1700.00 51.250 4356.2520.000 1700.0030.780 2616.3013.540 1150.90ROOT BARRIER1040.090
1.00 550.000 550.00 1350.000 1350.001200.000 1200.00540.000 540.00798.000 798.00MULTIPLE MAILBOX SUPPORTS 1070.200
1.00 180.000 180.00 850.000 850.00200.000 200.00540.000 540.00482.000 482.00MAILBOX CONCRETE COLLARS1070.300
10.00 157.000 1570.00 460.000 4600.0030.000 300.00243.000 2430.00222.870 2228.70GROUTED DURABLE ROCK9999.566
155,598.00 163,369.41 174,928.70 182,900.00 188,157.25PROJECT SUBTOTAL:
155,598.00 163,369.41 174,928.70 182,900.00 188,157.25CUMULATIVE TOTAL:
155,598.00 163,369.41 174,928.70 182,900.00 188,157.25CONTRACT TOTAL:
NORTH SANTIAM
PAVING CO
KNIFE RIVER Slateco LLC Van Nevel Concrete & Curb Inc.
SLE Inc.
QUANTITY TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE
12-04-2024 Page 3
2025-202CONTRACT #:
Marion County Public Works Contract Bid Detail Report - E
1PROJECT #:
SHAFF ROAD ADA SIDEWALK RAMPS
1PROJECT #: 0
1.00 22000.000 22000.00 16500.000 16500.0035000.000 35000.0029136.920 29136.9219800.000 19800.00MOBILIZATION210.100
1.00 7500.000 7500.00 6800.000 6800.006500.000 6500.007281.150 7281.1510000.000 10000.00TEMPORARY WORK ZONE
TRAFFIC CONTROL, COMPLETE
225.025
2.00 2000.000 4000.00 3800.000 7600.002500.000 5000.002635.400 5270.803000.000 6000.00PORTABLE CHANGEABLE
MESSAGE SIGNS
225.450
120.00 88.000 10560.00 98.000 11760.0095.000 11400.0081.630 9795.6080.000 9600.00FLAGGERS225.490
1.00 1000.000 1000.00 2400.000 2400.002500.000 2500.001187.820 1187.82500.000 500.00EROSION CONTROL280.100
3.00 150.000 450.00 475.000 1425.00120.000 360.00448.040 1344.12125.000 375.00INLET PROTECTION, TYPE 3280.193
1.00 1200.000 1200.00 2200.000 2200.00480.000 480.001157.870 1157.871500.000 1500.00CONCRETE WASHOUT FACILITY280.255
1.00 2000.000 2000.00 900.000 900.00450.000 450.00127.530 127.5350.000 50.00POLLUTION CONTROL PLAN290.100
1.00 7500.000 7500.00 16500.000 16500.003200.000 3200.005214.800 5214.8015000.000 15000.00REMOVAL OF STRUCTURES AND
OBSTRUCTIONS
310.100
360.00 10.000 3600.00 8.500 3060.005.000 1800.003.470 1249.203.500 1260.00ASPHALT PAVEMENT SAW
CUTTING
310.560
1.00 2000.000 2000.00 12500.000 12500.002500.000 2500.00979.080 979.082000.000 2000.00CLEARING AND GRUBBING 320.100
2.00 600.000 1200.00 800.000 1600.00500.000 1000.001557.340 3114.682000.000 4000.00ADJUSTING CATCH BASINS490.205
3.00 600.000 1800.00 400.000 1200.00350.000 1050.001774.660 5323.98500.000 1500.00ADJUST BOXES490.300
145.00 113.000 16385.00 42.000 6090.00120.000 17400.0097.140 14085.30159.000 23055.006 INCH ASPHALT CONCRETE
PAVEMENT REPAIR
542.115
100.00 150.000 15000.00 176.000 17600.00200.000 20000.0021.540 2154.0075.000 7500.001''-0 AGGREGATE BASE641.100
60.00 335.000 20100.00 235.000 14100.00250.000 15000.00220.910 13254.6079.000 4740.00COMMERCIAL ASPHALT
CONCRETE PAVEMENT
740.100
160.00 56.000 8960.00 128.000 20480.0058.000 9280.0066.450 10632.0054.000 8640.00CONCRETE CURBS, CURB AND
GUTTER
759.100
245.00 55.000 13475.00 65.000 15925.0056.000 13720.0036.080 8839.6038.000 9310.00CONCRETE CURBS, STANDARD759.120
11.00 1200.000 13200.00 1150.000 12650.001500.000 16500.001913.060 21043.661800.000 19800.00EXTRA FOR CURB RAMPS759.133
1900.00 12.250 23275.00 8.850 16815.0012.000 22800.0018.320 34808.0012.250 23275.00CONCRETE WALKS759.250
110.00 40.200 4422.00 58.000 6380.0065.000 7150.0055.990 6158.9055.000 6050.00TRUNCATED DOMES ON NEW
SURFACE
759.431
30.00 50.000 1500.00 84.950 2548.5030.000 900.00138.940 4168.2075.000 2250.00PAVEMENT BAR, TYPE B-HS867.302
1.00 2000.000 2000.00 1000.000 1000.00500.000 500.001346.350 1346.351000.000 1000.00REMOVE AND REINSTALL
EXISTING SIGNS
905.150
24.00 40.000 960.00 30.500 732.0030.000 720.0010.420 250.0814.000 336.00WOOD SIGN POSTS910.100
20.00 50.000 1000.00 62.000 1240.0030.000 600.0016.210 324.2032.000 640.00SIGNS, STANDARD SHEETING, SHEET ALUMINUM
940.620
1.00 1645.000 1645.00 10750.000 10750.002800.000 2800.004573.600 4573.6013000.000 13000.00RESTORE EXISTING
LANDSCAPING
1030.700
NORTH SANTIAM
PAVING CO
KNIFE RIVER Slateco LLC Van Nevel Concrete & Curb Inc.
SLE Inc.
QUANTITY TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE
12-04-2024 Page 4
2025-202CONTRACT #:
Marion County Public Works Contract Bid Detail Report - E
1PROJECT #:
SHAFF ROAD ADA SIDEWALK RAMPS
1PROJECT #: 0
85.00 25.000 2125.00 19.000 1615.0011.000 935.006.810 578.8550.000 4250.00ROOT BARRIER1040.090
1.00 1500.000 1500.00 650.000 650.00500.000 500.001014.440 1014.441300.000 1300.00MULTIPLE MAILBOX SUPPORTS 1070.200
1.00 2500.000 2500.00 150.000 150.00450.000 450.00334.920 334.92250.000 250.00MAILBOX CONCRETE COLLARS1070.300
10.00 200.000 2000.00 44.000 440.00280.000 2800.00404.330 4043.30125.000 1250.00GROUTED DURABLE ROCK9999.566
194,857.00 198,231.00 198,793.55 203,295.00 213,610.50PROJECT SUBTOTAL:
194,857.00 198,231.00 198,793.55 203,295.00 213,610.50CUMULATIVE TOTAL:
194,857.00 198,231.00 198,793.55 203,295.00 213,610.50CONTRACT TOTAL:
BROWN
CONTRACTING INC
DallumBuildCo KNL INDUSTRIES, INC.
ROY HOUCK
CONSTRUCTION
LLC
QUANTITY TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE
12-04-2024 Page 5
2025-202CONTRACT #:
Marion County Public Works Contract Bid Detail Report - E
1PROJECT #:
SHAFF ROAD ADA SIDEWALK RAMPS
1PROJECT #: 0
1.00 23000.000 23000.00 .0020000.000 20000.0030000.000 30000.0023300.000 23300.00MOBILIZATION210.100
1.00 8000.000 8000.00 .0025000.000 25000.0015000.000 15000.0016000.000 16000.00TEMPORARY WORK ZONE
TRAFFIC CONTROL, COMPLETE
225.025
2.00 1500.000 3000.00 .003000.000 6000.002000.000 4000.002500.000 5000.00PORTABLE CHANGEABLE
MESSAGE SIGNS
225.450
120.00 82.000 9840.00 .0080.000 9600.0040.000 4800.0065.000 7800.00FLAGGERS225.490
1.00 750.000 750.00 .002000.000 2000.005000.000 5000.004000.000 4000.00EROSION CONTROL280.100
3.00 120.000 360.00 .00200.000 600.001000.000 3000.00400.000 1200.00INLET PROTECTION, TYPE 3280.193
1.00 750.000 750.00 .005000.000 5000.003000.000 3000.00750.000 750.00CONCRETE WASHOUT FACILITY280.255
1.00 1000.000 1000.00 .001500.000 1500.002000.000 2000.001000.000 1000.00POLLUTION CONTROL PLAN290.100
1.00 28000.000 28000.00 .0020000.000 20000.005000.000 5000.005000.000 5000.00REMOVAL OF STRUCTURES AND
OBSTRUCTIONS
310.100
360.00 4.750 1710.00 .005.000 1800.009.000 3240.009.000 3240.00ASPHALT PAVEMENT SAW
CUTTING
310.560
1.00 5000.000 5000.00 .0010000.000 10000.007000.000 7000.004000.000 4000.00CLEARING AND GRUBBING 320.100
2.00 1200.000 2400.00 .003500.000 7000.002000.000 4000.002000.000 4000.00ADJUSTING CATCH BASINS490.205
3.00 900.000 2700.00 .00500.000 1500.001800.000 5400.00750.000 2250.00ADJUST BOXES490.300
145.00 130.000 18850.00 .00100.000 14500.0070.000 10150.00100.000 14500.006 INCH ASPHALT CONCRETE
PAVEMENT REPAIR
542.115
100.00 120.000 12000.00 .0050.000 5000.0030.000 3000.00115.000 11500.001''-0 AGGREGATE BASE641.100
60.00 280.000 16800.00 .00350.000 21000.00120.000 7200.00280.000 16800.00COMMERCIAL ASPHALT
CONCRETE PAVEMENT
740.100
160.00 70.000 11200.00 .0080.000 12800.0055.000 8800.0085.000 13600.00CONCRETE CURBS, CURB AND
GUTTER
759.100
245.00 40.000 9800.00 .0060.000 14700.0045.000 11025.0065.000 15925.00CONCRETE CURBS, STANDARD759.120
11.00 1000.000 11000.00 .002500.000 27500.003000.000 33000.002500.000 27500.00EXTRA FOR CURB RAMPS759.133
1900.00 16.000 30400.00 .0020.000 38000.0012.000 22800.0012.000 22800.00CONCRETE WALKS759.250
110.00 58.000 6380.00 .0050.000 5500.0050.000 5500.0045.000 4950.00TRUNCATED DOMES ON NEW
SURFACE
759.431
30.00 65.000 1950.00 .0075.000 2250.00150.000 4500.0090.000 2700.00PAVEMENT BAR, TYPE B-HS867.302
1.00 2350.000 2350.00 .003500.000 3500.004000.000 4000.003000.000 3000.00REMOVE AND REINSTALL
EXISTING SIGNS
905.150
24.00 68.000 1632.00 .00100.000 2400.00150.000 3600.0020.000 480.00WOOD SIGN POSTS910.100
20.00 140.000 2800.00 .0075.000 1500.00400.000 8000.0028.000 560.00SIGNS, STANDARD SHEETING, SHEET ALUMINUM
940.620
1.00 5000.000 5000.00 .007500.000 7500.008000.000 8000.004500.000 4500.00RESTORE EXISTING
LANDSCAPING
1030.700
BROWN
CONTRACTING INC
DallumBuildCo KNL INDUSTRIES, INC.
ROY HOUCK
CONSTRUCTION
LLC
QUANTITY TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE
12-04-2024 Page 6
2025-202CONTRACT #:
Marion County Public Works Contract Bid Detail Report - E
1PROJECT #:
SHAFF ROAD ADA SIDEWALK RAMPS
1PROJECT #: 0
85.00 37.000 3145.00 .00100.000 8500.0090.000 7650.00100.000 8500.00ROOT BARRIER1040.090
1.00 950.000 950.00 .003500.000 3500.003000.000 3000.002000.000 2000.00MULTIPLE MAILBOX SUPPORTS 1070.200
1.00 760.000 760.00 .001000.000 1000.002000.000 2000.00150.000 150.00MAILBOX CONCRETE COLLARS1070.300
10.00 800.000 8000.00 .00750.000 7500.00500.000 5000.00650.000 6500.00GROUTED DURABLE ROCK9999.566
229,527.00 233,505.00 238,665.00 286,650.00 0.00PROJECT SUBTOTAL:
229,527.00 233,505.00 238,665.00 286,650.00 0.00CUMULATIVE TOTAL:
229,527.00 233,505.00 238,665.00 286,650.00 .00CONTRACT TOTAL: