This document is an Addendum No. 2 for the PVCC Replace Underground Waterline project, Project No. 22100 (PC#260-B2260-072 M22PV116), issued on February 2, 2024. The addendum clarifies that bidders may bid the project using either directional bore or open-cut trench methods, or a combination thereof. If directional boring is chosen, utility trench warning tape shall be omitted, and location wire shall be affixed to the bored utility pipe segments. No other specification or drawing changes are noted.
The related state and local contract opportunity is for the replacement of approximately 1,600 sq. ft. of water line at Piedmont Virginia Community College in Charlottesville, Virginia. Sealed bids will be received electronically through eVA and at the Virginia Community College System office until 2:00 P.M. on Tuesday, February 13, 2024, and will be publicly opened and read aloud on the following day, Wednesday, February 14, 2024. A pre-bid conference will be held on January 18, 2024, at the project site, and attendance is optional but highly recommended.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PVCC REPLACE UNDERGROUND WATERLINE PAGE 1 OF 1
PROJECT NO. 22100 (PC#260-B2260-072 M22PV116) ADDENDUM NO. 2
PVCC REPLACE UNDERGROUND WATERLINE
PC# 260-B2260-073 (M22PV116)
Project No. 22100
ADDENDUM NO. 2
February 2, 2024
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated January 8, 2024.
Acknowledge receipt of this Addendum (1 page) in the space provided on the BID FORM.
Failure to do so may subject the Bidder to disqualification.
The following items clarify, modify, change, delete from or add to the Contract Documents.
When any paragraph, subparagraph, or sub-subparagraph thereof is modified or deleted by this Addendum, the unaltered provisions of that paragraph, subparagraph or sub-subparagraph shall remain in effect.
CLARIFICATIONS / GENERAL:
1. Bidders, at their option, shall be allowed to bid the project as directional bore instead of open cut trench or any combination thereof should that method of installation be desired.
Should directional boring be chosen, utility trench warning tape shall be omitted where no trenching occurs, and location wire shall be affixed to the bored utility pipe segments with connection points to the location wire provided at all access points along the new route.
SPECIFICATIONS: NONE
DRAWINGS: NONE
END OF ADDENDUM