Purchasing Specs - BEAR CBs.pdf

PDF 127 KB Posted

Attached to
Bear Engine Circuit Breakers BPA
Solicitation number
FA822825Q0010
Issued by

About this file

This Purchasing Specification Sheet, dated 19 January 2025, details requirements for two Cummins components: a High Voltage Circuit Breaker (Part #: A061C374) and a Control Box (Part #: A034H205). Both items have identical procurement specifications, including a manufacturer warranty, 12-week delivery timeline from the order date, verification as "A" condition parts, and installation to be performed by the government. The document emphasizes that the government will base its award decision primarily on technical evaluation, and proposals must comprehensively address all specification elements to be considered.

The specification sheet provides clear, structured requirements for potential vendors, highlighting that any proposal missing elements from the purchase specification will be automatically disqualified. The technical focus suggests a rigorous selection process for these electrical components, with precise delivery expectations and quality standards. Vendors must ensure full compliance with the listed specifications to be eligible for the contract award.

View the file

Other files

File Type Posted
Solicitation - FA822825Q0010.pdf PDF
Blank Price List.xlsx XLSX spreadsheet
Brand Name Letter BEAR CBs and Ctrl Box_Redacted.pdf PDF
Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchasing Specification Sheet

Date: 19 January 2025

1) Cummins High Voltage Circuit Breaker (Part #: A061C374)

• Manufacturer Warranty on Circuit Breaker

• 12-week delivery from date of order.

• Verified “A” condition part.

• Installation will be performed by government.

2) Cummins Control Box (Part #: A034H205)

• Manufacturer Warranty on Control Box

• 12-week delivery from date of order.

• Verified “A” condition part.

• Installation will be performed by government.

PLEASE NOTE: The government is basing its decision primarily on the technical evaluation. In Order to be considered for the award, your proposal must be in accordance with all the elements listed in the purchase specification sheet. If your proposal is missing any part of the purchase specification, your proposal will not be considered.

File details come from the government source that posted it. Updated .