PUMP PERFORMANCE TEST WORKSHEET.pdf

PDF 114 KB Posted

Attached to
Annual Mobile Fire Emergency Inspection IAW NFPA 1910
Solicitation number
W911S725QA002
Issued by

About this file

The document is a Pump Performance Test Worksheet from the National Fire Protection Association (NFPA) Standard 1910, designed to record comprehensive testing data for emergency vehicle fire pumps. The form captures detailed technical specifications and performance metrics, including vehicle identification details, pump rated capacity, test site conditions, and results across multiple test scenarios such as 20-minute capacity test, 5-minute overload test, and 10-minute 200 psi tests. The worksheet allows for recording critical measurements like engine and pump RPMs, pressures, temperatures, oil pressure, voltage, and provides space for documenting test conditions, test personnel, and authorized representative signatures.

The form is specifically associated with the US Army Fort Leonard Wood Fire Department's solicitation (W911S725QA002) for annual mobile fire emergency vehicle inspections, which requires detailed testing of their fleet consisting of 8 fire trucks from manufacturers including Pierce, Ferrara, Oshkosh, KME International, Ford, and E-One. The inspection must adhere to NFPA 1910 standards, with tests to be conducted on-site at the military installation, requiring valid identification for all personnel involved. The worksheet serves as a standardized template for documenting the comprehensive technical assessment of each emergency vehicle's pump performance and operational capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUMP PERFORMANCE TEST

IAW NFPA1910

© 2024 National Fire Protection Association

Emergency vehicle number or designation ___________

Manufacturer __________________________________

Serial no. _____________________________________

Engine make __________________________________

Pump make ___________________________________

Year manufactured _____________________________

Model _______________________________________

Vehicle identification no. _________________________

Model _______________________________________

Model _______________________________________

Pump rated capacity __________________ (gpm) (L/min) at _______________(psi) (kPa)

Speed check taken from _________________________ Ratio to engine ________________________________

Test site location ___________________________________________________________________________________

Tests performed from __ Draft __ Hydrant

Suction hose size _____________________ (in.) (mm) Length _________________________(ft) (m)

At start of tests At end of tests

Atmospheric pressure

Air Temperature

Water temperature

Elevation of test site

Lift

Governed engine speed ___________________________ Actual maximum engine speed ____________________

Verify operation of pump shift indicator __________________________________________________________________

Verify operation of pump engine control interlock at pump operator’s panel _____________________________________

Maximum vacuum attained _________________________ Vacuum drop in 5 minutes ________________________

Time to prime pump ________________________________________________________________________________

Pressure control device test:

Rise while pumping capacity at 150psi ________________________________________________________________

Rise while pumping capacity at 90 psi ________________________________________________________________

Rise while pumping at 50 percent capacity at 250 psi ____________________________________________________

Intake relief valve test results _________________________________________________________________________

Tank to pump water flow test ___________________ (gpm) (L/min)

Gauge accuracy _____________________________ Flowmeter accuracy ___________________________________

Pump Test Results Capacity test Overload test 200 psi test 250 psi test Duration Average nozzle pressure Corrected pressure Gallons per minute Average pump pressure rpm-engine Rpm-pump

Comments

PUMP PERFORMANCE TEST

IAW NFPA1910

© 2024 National Fire Protection Association

20-Minute Capacity Test Layout _____________________________ Nozzle size _______ Position of transfer valve _______________

Pump Intake Pump Discharge

Time

Counter (if used) rpm

Tach

Engine temperature

Oil pressure

Voltage

Automatic Transmission

Temp (if equipped)

Apparatus gauge

Test

Apparatus

Test

Pilot/ flow

5-Minute Overload Test

10-Minute 200 psi Test

10-Minute 200 psi Test

Person conducting the test ___________________________________________________________________________

Representing _____________________________________________________________________________________

Signature _____________________________________________________ Date ___________________________

AHJ representative _____________________________________________ Date ___________________________