This is a Public Works Local Agreement (Agreement No. C250017) between the Orange County Transportation Authority (OCTA) and a contractor for facility modifications at the Santa Ana Bus Base Operations Building. The work includes all labor, equipment, materials, and facilities necessary to complete the specified modifications in compliance with the contract documents, including General Provisions (Exhibit A), Specifications (Exhibit B), Drawings (Exhibit C), and Safety Specifications (Exhibit H). The contractor must fully complete the work within 180 calendar days from the issuance of a written Notice to Proceed and must provide a minimum of 72 hours advance notice before commencing any work. The contract is subject to performance bonds (Exhibit E), payment bonds (Exhibit F), and a guaranty (Exhibit G), all at 100 percent of the agreement price. The contractor must also maintain required insurance coverages, including Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), Workers' Compensation as required by California, Builders All Risk coverage, and Employers' Liability ($1,000,000 minimum).
Payment will be made in progress installments and a final payment according to terms specified in Exhibit A, with the total contract price and maximum cumulative payment obligation to be determined. All laborers and mechanics must be paid in accordance with prevailing wage rates established by the California Department of Industrial Relations, with wages paid no less than weekly. The contractor is classified as an independent contractor and bears full responsibility for all employees, subcontractors, and compliance with applicable federal, state, and local laws. The contract includes standard provisions for changes and extra work (subject to written change orders), warranty obligations covering one year from acceptance, liquidated damages for schedule delays, termination for convenience or default, and indemnification of OCTA. The contractor must comply with all requirements set forth in the contract documents and is responsible for investigating site conditions and understanding the scope of work prior to bid submission.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Last Rev: 9/11/2025
AGREEMENT NO. C250017
BETWEEN
ORANGE COUNTY TRANSPORTATION AUTHORITY
AND
THIS AGREEMENT is effective this _____ day of ________________________, 20__ (“Effective
Date”), by and between the Orange County Transportation Authority, 550 South Main Street, P.O. Box
14184, Orange, CA 92863-1584, a public corporation of the State of California (hereinafter referred to as
"AUTHORITY"), and , , , (hereinafter referred to as "CONTRACTOR").
WITNESSETH:
WHEREAS, AUTHORITY has determined that it requires Facility Modifications at Santa Ana Bus
Base Operations Building; and
WHEREAS, said work cannot be performed by the regular employees of AUTHORITY; and
WHEREAS, CONTRACTOR has represented that it has the requisite personnel, experience, material, and equipment and is otherwise qualified to perform such services; and
WHEREAS, CONTRACTOR wishes to perform these services; and
WHEREAS, the AUTHORITY’s Board of Directors authorized this Agreement on .
NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and CONTRACTOR as follows:
ARTICLE 1. COMPLETE AGREEMENT
A. This Agreement, including all exhibits and other documents incorporated herein and made applicable by reference, constitutes the complete and exclusive statement of the terms and conditions of the agreement between AUTHORITY and CONTRACTOR and it supersedes all prior representations, understandings and communications. The invalidity in whole or in part of any term or condition of this
Agreement shall not affect the validity of other terms or conditions.
B. AUTHORITY's failure to insist in any one or more instances upon the performance of any
AGREEMENT NO. C250017
terms or conditions of this Agreement shall not be construed as a waiver or relinquishment of
AUTHORITY's right to such performance by CONTRACTOR or to future performance of such terms or conditions and CONTRACTOR's obligation in respect thereto shall continue in full force and effect.
CONTRACTOR shall be responsible for having taken steps reasonably necessary to ascertain the nature and location of the work, and the general and local conditions, which can affect the work or the cost thereof. Any failure by CONTRACTOR to do so will not relieve it from responsibility for successfully performing the work without additional expense to AUTHORITY.
C. AUTHORITY assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, employees or agents prior to the execution of this Agreement, unless such understanding or representations by AUTHORITY are expressly stated in this Agreement.
D. Time shall be of the essence hereunder; but CONTRACTOR shall perform work hereunder only to the minimum extent consistent with requirements herein.
E. Changes to any portion of this Agreement shall not be binding upon AUTHORITY except when specifically confirmed in writing by an authorized representative of AUTHORITY and issued in accordance with the provisions of this Agreement.
ARTICLE 2. AUTHORITY DESIGNEE
The Chief Executive Officer of AUTHORITY, or designee, shall have the authority to act for and exercise any of the rights of AUTHORITY as set forth in this Agreement.
ARTICLE 3. SCOPE OF WORK
CONTRACTOR shall provide all labor, equipment, materials and facilities necessary for all work related to Facility Modification at Santa Ana Bus Base Operations Building at the AUTHORITY's
Santa Ana Bus Base in strict compliance with all the requirements specified herein and in:
Exhibit A, entitled "General Provisions";
Addendum No’s ;
Exhibit B, entitled "Specifications";
Exhibit C, entitled "List of Drawings";
Exhibit D, entitled "List of Subcontractors";
Exhibit E, entitled "Performance Bond";
Exhibit F, entitled "Payment Bond";
Exhibit G, entitled "Guaranty";
Exhibit H, entitled “Safety Specifications” and
Exhibit I, entitled “Contract Change Order”;
all of which documents are attached to and, by this reference, incorporated in and made a part of this
Agreement. By this reference, also incorporated in and made a part of this Agreement are all applicable provisions of IFB and all representations made by CONTRACTOR in its original bid to AUTHORITY, including, but not limited to, CONTRACTOR's certifications relative to Workers' Compensation Insurance, and compliance with Section 7028.15 of the State of California Business and Professions Code.
ARTICLE 4. DELIVERY / RECOVERY SCHEDULE
A. CONTRACTOR shall fully complete the herein above described work within 180 calendar days from the effective date of written Notice to Proceed (NTP) issued by AUTHORITY. CONTRACTOR shall give AUTHORITY not less than seventy-two (72) hours advance notice of the start of any work.
Within five (5) calendar days after said notice, CONTRACTOR shall provide any construction schedules as may be requested by AUTHORITY.
B. If at any time, the critical path schedule reflects -30 or a greater negative number of days of total float, then CONTRACTOR, within ten days after CONTRACTOR first becomes aware of such schedule delay, shall prepare and submit to AUTHORITY for review and approval a Recovery Schedule demonstrating CONTRACTOR’s proposed plan to regain lost schedule progress and to achieve the original contractual milestones in accordance with the Contract. AUTHORITY shall notify
CONTRACTOR within ten days after receipt of each such Recovery Schedule whether the schedule is deemed accepted or rejected. Within five days after AUTHORITY’s rejection of the schedule, CONTRACTOR will resubmit a revised Recovery Schedule incorporating AUTHORITY’s comments.
When AUTHORITY accepts CONTRACTOR’s Recovery Schedule, CONTRACTOR shall, within five days after AUTHORITY’s acceptance, incorporate and fully include such schedule into the Project
Schedule and deliver it to AUTHORITY.
C. All costs incurred by CONTRACTOR in preparing, implementing and achieving the Recovery
Schedule shall be borne by CONTRACTOR and shall not result in a change to the contract price.
D. In the event that CONTRACTOR fails to provide an acceptable Recovery Schedule within 30 days of CONTRACTOR’s receipt of a notice to do so, CONTRACTOR shall have no right to receive progress payments until CONTRACTOR has prepared and AUTHORITY has approved such Recovery
Schedule.
ARTICLE 5. START OF WORK
CONTRACTOR shall incur no costs, and shall not perform or furnish any work, services, materials or equipment under this Agreement, unless and until a written Notice to Proceed has been given to
CONTRACTOR by AUTHORITY. Conditions precedent to AUTHORITY issuing said Notice to Proceed are CONTRACTOR furnishing the Exhibit E "Performance Bond," Exhibit F "Payment Bond," Exhibit G
"Guaranty," and certificates of insurance as set forth in Article 10 hereunder. CONTRACTOR shall furnish said documents within ten (10) calendar days after notification of contract award from AUTHORITY.
Upon receipt of acceptable bonds, guaranty, and insurance certificates, AUTHORITY will within ten (10) working days thereafter issue the written Notice to Proceed.
ARTICLE 6. PAYMENT
A. For CONTRACTOR's full and complete performance of its obligations under this Agreement, and subject to the maximum cumulative payment obligation provision set forth in Article 7, AUTHORITY shall pay CONTRACTOR the total sum of Dollars ($ .00).
B. Progress payments and the final payment will be made by AUTHORITY to CONTRACTOR in accordance with the terms as set forth in Exhibit A, "General Provisions," under the "Progress
Payments" and "Final Payment and Claims" sections therein. The acceptance by CONTRACTOR of
AUTHORITY's final payment hereunder shall constitute a waiver of all claims against AUTHORITY under or arising out of this herein Agreement, as such may from time to time be amended.
C. Failure by AUTHORITY to pay amount in dispute shall not alleviate, diminish or modify in any respect the CONTRACTOR's obligation to achieve final acceptance of and all work in accordance with the contract documents, and CONTRACTOR shall not cease or slow down its performance under this
Agreement on account of any such amount in dispute. CONTRACTOR shall proceed as directed by
AUTHORITY pending resolution of dispute. Upon resolution of dispute, each party shall promptly pay any amount owing.
D. Allowances are to be paid based on Force Account. No work under allowance categories shall commence unless authorized in writing by the Engineer. Any costs which exceed, or are less than the bid allowance amount, shall require an adjustment to the maximum cumulative payment obligation amount by change order.
ARTICLE 7. MAXIMUM OBLIGATION
Notwithstanding any provisions of this Agreement to the contrary, AUTHORITY and
CONTRACTOR mutually agree that AUTHORITY's maximum cumulative payment obligation hereunder
(including obligation for CONTRACTOR 's profit), shall be Dollars ($ .00), which shall include all amounts payable to CONTRACTOR for its subcontracts, leases, materials and costs arising from, or due to termination of, this Agreement.
ARTICLE 8. NOTICES
All notices hereunder and communications regarding the interpretation of the terms of this
Agreement, or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in the U.S. mail, registered or certified mail, returned receipt requested, postage prepaid and addressed as follows:
To CONTRACTOR: To AUTHORITY:
Orange County Transportation Authority
550 South Main Street
P.O. Box 14184
, Orange, CA 92863-1584
ATTENTION:
Title:
ATTENTION:
Title:
JOSIE MELLEN
SR. CONTRACT
ADMINISTRATOR
Phone:
Email:
Phone: (714) 560 - 5860
Email: jmellen@octa.net
ARTICLE 9. INDEPENDENT CONTRACTOR
A. CONTRACTOR's relationship to AUTHORITY in the performance of this Agreement is that of an independent contractor. CONTRACTOR's personnel performing work under this Agreement shall at all times be under CONTRACTOR's exclusive direction and control and shall be employees of
CONTRACTOR and not employees of AUTHORITY. CONTRACTOR shall pay all wages, salaries and other amounts due its employees in connection with this Agreement and shall be responsible for all reports and obligations respecting them, such as social security, income tax withholding, unemployment compensation, workers' compensation and similar matters.
B. Should CONTRACTOR’s personnel or a state or federal agency allege claims against
AUTHORITY involving the status of AUTHORITY as employer, joint or otherwise, of said personnel, or allegations involving any other independent contractor misclassification issues, CONTRACTOR shall defend and indemnify AUTHORITY in relation to any allegations made.
ARTICLE 10. INSURANCE
A. CONTRACTOR shall procure and continuously maintain in full force and effect through contract completion, insurance coverages specified herein. Coverages shall not be subject to self-insurance provisions. CONTRACTOR shall provide the following insurance coverage:
1. Commercial General Liability, to include Products/Completed Operations, Independent Contractors’, Contractual Liability, and Personal Injury, and Property Damage with a minimum limit of $1,000,000 per occurrence and $2,000,000 general aggregate.
2. Automobile Liability to include owned, hired and non-owned autos with a combined single limit of $1,000,000 each accident;
3. Workers’ Compensation with limits as required by the State of California, including waiver of subrogation, in favor of AUTHORITY, its officers, directors, employees and agents.
4. Builders All Risk policy or course of construction including earthquake and flood coverage with minimum limits of $(project amount).
5. Employers’ Liability with minimum limits of $1,000,000.
B. Prior to commencement of any work hereof, CONTRACTOR shall furnish to AUTHORITY’s
Contract Administrator broker-issued insurance certificate showing the required insurance coverages and further providing that:
1. AUTHORITY, its officers, directors, employees and agents must be named as additional insured on Commercial General Liability and Automobile Liability policy with respect to performance hereunder; and
2. The coverage shall be primary and noncontributory as to any other insurance with respect to performance hereunder; and
3. Thirty (30) days prior written notice of cancellation or material change be given to
AUTHORITY.
In addition, CONTRACTOR shall provide insurance policy blanket endorsement.
C. "Occurrence," as used herein, means any event or related exposure to conditions, which result in bodily injury or property damage.
D. Upon AUTHORITY’s request, certified, true and exact copies of each of the insurance policies shall be provided to AUTHORITY.
E. AUTHORITY shall notify CONTRACTOR in writing of any changes in the requirements to insurance required to be provided by CONTRACTOR. Except as set forth in this Article, any additional cost from such change shall be paid by AUTHORITY and any reduction in cost shall reduce the contract price pursuant to a change order.
F. CONTRACTOR shall also include in each subcontract the stipulation that subcontractors shall maintain coverage in the amounts required as provided in this Agreement.
G. CONTRACTOR shall be required to immediately notify AUTHORITY of any modifications or cancellation of any required insurance policies.
H. CONTRACTOR shall submit required insurance certificates to AUTHORITY’s insurance tracking contractor, InsureTrack. CONTRACTOR shall respond directly to InsureTrack’s request for updated insurance certificates and other insurance-related matters by email to octa@instracking.com.
I. CONTRACTOR shall include on the face of the certificate of insurance, the following information:
1. The Agreement Number 250017 and, the Contract Administrator’s Name, JOSIE
MELLEN
2. For Certificate Holder: The Orange County Transportation Authority, its officers, directors, employers and agents, c/o InsureTrack, P.O. Box 60840 Las Vegas, NV 89160.
ARTICLE 11. BONDS
A. By submitting Exhibit E, entitled “Performance Bond," and Exhibit F, entitled "Payment Bond,"
CONTRACTOR shall satisfy AUTHORITY's requirements that CONTRACTOR deposit with AUTHORITY bonds with values in the sum of 100 percent of this Agreement's price to cover CONTRACTOR's failure to fully perform hereunder and CONTRACTOR's failure to pay its labor, material or failure to comply with
Article 32 of this Agreement, in performing hereunder. If the contract price is increased in connection with a Change Order, the AUTHORITY may, in its sole discretion, require a corresponding increase in the amount of the Performance and Payment bonds or new bonds covering the Change Order work.
B. Notwithstanding any other provision set forth in this Agreement, performance by a Surety or
Guarantor of any obligations of CONTRACTOR shall not relieve CONTRACTOR of any of its obligations thereunder.
ARTICLE 12. ORDER OF PRECEDENCE
Conflicting provisions hereof, if any, shall prevail in the following descending order of precedence:
(1) the provisions of this Agreement, including its exhibits; (2) the provisions of IFB including all mailto:octa@instracking.com
Addendums; (3) the bid submitted to AUTHORITY by CONTRACTOR in response to said IFB; and (4) any other documents, cited herein or incorporated by reference. In the event of conflicting provisions of
Exhibit B (“Specifications”), and Exhibit C ("List of Drawings"), Project Specifications shall take precedence.
ARTICLE 13. CHANGES
A. By written notice or order, AUTHORITY may, from time to time, order work suspension and/or make any change in the general scope of this Agreement, including, but not limited to, changes in the drawings, specifications, schedules (either deceleratory or acceleratory) or any other particular of the specifications or provisions of this Agreement. If any such work suspension or change causes an increase or decrease in the price or time required for performance, CONTRACTOR shall promptly notify
AUTHORITY thereof and assert its claim for adjustment within ten (10) calendar days after the change or work suspension is ordered, and an equitable adjustment shall be negotiated. However, nothing in this clause shall excuse CONTRACTOR from proceeding immediately with the Agreement as changed.
Changes will be made in accordance with the terms as set forth in Exhibit A, "General Provisions," paragraph F, Extra Work and Changes, by written Change Order.
B. No claims by CONTRACTOR for equitable adjustment hereunder shall be allowed if asserted after final payment under this Agreement.
C. Any work done beyond the technical provisions specified in this Agreement, or any extra work done without AUTHORITY's written authority, will be considered unauthorized work and will not be paid for. Upon order of AUTHORITY's Engineer or its designee, unauthorized work shall be remedied, removed or replaced at CONTRACTOR's expense.
ARTICLE 14. MODIFICATION PROPOSALS-PRICE BREAKDOWN
CONTRACTOR, in connection with any proposal it makes for an agreement modification, shall furnish a price breakdown, itemized as required by AUTHORITY. Unless otherwise directed, the breakdown shall be in sufficient detail to permit an analysis of all material, labor, equipment, subcontract and overhead costs, as well as profit, and shall cover all work involved in the modification, whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a similar price breakdown. In addition, if the proposal includes a time extension, a justification therefore shall also be furnished. The proposal, together with the price breakdown and time extension justification, shall be furnished by the date specified by AUTHORITY.
ARTICLE 15. DISPUTES
A. Except as otherwise provided in this Agreement, when a dispute arises between
CONTRACTOR and AUTHORITY, the project managers shall meet to resolve the issue. If project managers do not reach a resolution, the dispute will be decided by AUTHORITY’s Director of Contracts
Administration and Materials Management (CAMM), who shall reduce the decision to writing and mail or otherwise furnish a copy thereof to CONTRACTOR. The decision of the Director, CAMM, shall be the final and conclusive administrative decision.
B. Pending final decision of a dispute hereunder, CONTRACTOR shall proceed diligently with the performance of this Agreement and in accordance with the decision of AUTHORITY's Director, CAMM. Nothing in this Agreement, however, shall be construed as making final the decision of any
AUTHORITY official or representative on a question of law, which questions shall be settled in accordance with the laws of the State of California.
ARTICLE 16. TERMINATION FOR CONVENIENCE
A. AUTHORITY may terminate this Agreement for its convenience at any time in whole or in part, by giving CONTRACTOR written notice thereof. AUTHORITY shall terminate by delivering to
CONTRACTOR a written Notice of Termination for Convenience specifying the extent of termination and its effective date. Upon termination, AUTHORITY shall pay CONTRACTOR its allowable costs incurred to date of that portion terminated. The rights, duties and obligations of the parties shall be construed in accordance with the applicable provisions of CFR Title 48, Chapter 1, Part 49, of the Federal Acquisition
Regulation (FAR) and specific subparts and other provisions thereof applicable to termination for convenience. If AUTHORITY sees fit to terminate this Agreement for convenience, said notice shall be given to CONTRACTOR in accordance with the provisions of the FAR referenced above and Article 8, herein. Upon receipt of said notification, CONTRACTOR shall immediately proceed with all obligations, regardless of any delay in determining or adjusting any amounts due under this Article, and agrees to comply with all applicable provisions of the FAR pertaining to termination for convenience.
ARTICLE 17. TERMINATION FOR DEFAULT-DAMAGES FOR DELAY-TIME EXTENSIONS
A. If CONTRACTOR refuses or fails to prosecute the work, or any separable part thereof, with such diligence as will ensure its completion within the time specified in this Agreement, or any extension thereof, or fails to complete said work within such time, AUTHORITY may, by written notice to
CONTRACTOR, terminate CONTRACTOR's right to proceed with the work or such part of the work as to which there has been delay. In such event, AUTHORITY may take over the work and prosecute the same to completion, by Agreement or otherwise, and may take possession of and utilize in completing the work such materials, appliances and plant as may be on the site of the work and necessary therefore.
Whether or not CONTRACTOR's right to proceed with the work is terminated, it and its sureties shall be liable for any damage to AUTHORITY resulting from its refusal or failure to complete the work within the specified time.
B. If AUTHORITY so terminates CONTRACTOR's right to proceed, the resulting damage will consist of such liquidated damages as set forth in the Article 31 in this Agreement entitled "Liquidated
Damages," until such reasonable time as may be required for final completion of the work together with any increased costs occasioned AUTHORITY in completing the work. If AUTHORITY does not so terminate CONTRACTOR's right to proceed, the resulting damage will consist of such liquidated damages until the work is completed or accepted.
C. CONTRACTOR's right to proceed shall not be so terminated nor the CONTRACTOR charged with resulting damage if:
1. The delay in completing the work arises from unforeseeable causes beyond the control and without the fault or negligence of CONTRACTOR, including but not restricted to, acts of God, acts of the public enemy, acts or omissions of AUTHORITY, acts of another CONTRACTOR in the performance of an Agreement with AUTHORITY, fires, floods, epidemics, quarantine restrictions, freight embargoes, unusually severe weather, or delays of subcontractors or suppliers arising from unforeseeable causes beyond the control and without the fault or negligence of both CONTRACTOR and such subcontractors or suppliers; and
2. CONTRACTOR, within ten (10) calendar days from the beginning of any such delay, notifies AUTHORITY in writing of the causes of delay. AUTHORITY shall ascertain the facts and the extent of the delay and extend the time for completing the work when, in its judgment, the findings of fact justify such an extension, and its findings of fact shall be final and conclusive on the parties, subject only to appeal as provided in the "Disputes" clause of this Agreement. Any such time extensions will not become effective until approved by AUTHORITY's Engineer in writing. AUTHORITY's Engineer will furnish CONTRACTOR a weekly statement showing the number of calendar days charged to the
Agreement for the preceding week, the number of calendar days of time extensions being considered or approved, the number of calendar days originally specified for the completion of this Agreement and the number of calendar days remaining to complete this Agreement, and the extended date for completion thereof.
3. Should at any time extensions be included by AUTHORITY's Engineer on the Weekly
Statement of Contract Calendar Days, a change order covering the sum total of the time extensions will be issued to CONTRACTOR at periodic intervals during the project.
D. If, after notice of termination of CONTRACTOR's right to proceed under the provisions of this clause, it is determined for any reason that CONTRACTOR was not in default under the provisions of this clause, or that the delay was excusable under the provisions of this clause, the rights and obligations of the parties shall be the same as if the notice of termination had been issued pursuant to Article 16, entitled
"Termination for Convenience."
E. The rights and remedies of AUTHORITY provided in this clause are in addition to any other rights and remedies provided by law or under this Agreement.
F. As used in paragraph C.1 of this Article, the term "subcontractors or suppliers," means subcontractors or suppliers at any tier.
ARTICLE 18. INDEMNIFICATION
CONTRACTOR shall indemnify, defend, and hold harmless AUTHORITY, its officers, directors, employees and agents from and against any and all claims (including attorneys' fees and reasonable expenses for litigation or settlement) for any loss, costs, penalties, fines, damages, bodily injuries, including death, damage to or loss of use of property, arising out of, resulting from, or in connection with the performance of CONTRACTOR, its officers, directors, employees, agents, subcontractors or suppliers under the Agreement. Notwithstanding the foregoing, such obligation to defend, hold harmless, and indemnify AUTHORITY, its officers, directors, employees and agents shall not apply to such claims or liabilities arising from the sole or active negligence or willful misconduct of AUTHORITY.
ARTICLE 19. ASSIGNMENTS AND SUBCONTRACTS
A. Neither this Agreement nor any interest herein nor claim hereunder may be assigned by
CONTRACTOR either voluntarily or by operation of law. CONTRACTOR shall not have the right to make any substitutions of any subcontractor listed in Exhibit D, entitled "List of Subcontractors," except in accordance with the provisions of the Subletting and Subcontractors Fair Practices Act, Public Contract
Code section 4100 et. seq. AUTHORITY's consent shall not be deemed to relieve CONTRACTOR of its obligation to fully comply with the requirements of this Agreement.
B. CONTRACTOR shall be fully responsible to AUTHORITY for all acts and omissions of its own employees, and of subcontractors and their employees. CONTRACTOR shall coordinate the work performed by subcontractor.
C. AUTHORITY shall have the right, but not the obligation, to review the form of subcontract used by CONTRACTOR for the project and to require modifications thereto to conform to the requirements set forth herein.
ARTICLE 20. AUDIT AND INSPECTION OF RECORDS
CONTRACTOR shall provide AUTHORITY, or other agents of the AUTHORITY, such access to
CONTRACTOR's accounting books, records, payroll documents and facilities of the CONTRACTOR which are directly pertinent to this Agreement for the purposes of examining, auditing and inspecting all accounting books, records, work data, documents and activities related hereto. CONTRACTOR shall maintain such books, records, data and documents in accordance with generally accepted accounting principles and shall clearly identify and make such items readily accessible to such parties during
CONTRACTOR's performance hereunder and for a period of four (4) years from the date of final payment by AUTHORITY, except in the event of litigation or settlement of claims arising from the performance of this Agreement, in which case CONTRACTOR agrees to maintain same until AUTHORITY, or any of their duly authorized representatives, have disposed of all such litigation, appeals, claims or exceptions related thereto. AUTHORITY’s right to audit books and records directly related to this Agreement shall also extend to all first-tier subcontractors. CONTRACTOR shall permit any of the foregoing parties to reproduce documents by any means whatsoever or to copy excerpts and transcriptions as reasonably necessary.
ARTICLE 21. CONFLICT OF INTEREST
CONTRACTOR agrees to avoid organizational conflicts of interest. An organizational conflict of interest means that due to other activities, relationships or contracts, the CONTRACTOR is unable, or potentially unable to render impartial assistance or advice to the AUTHORITY; CONTRACTOR’s objectivity in performing the work identified in the Scope of Work is or might be otherwise impaired; or the
CONTRACTOR has an unfair competitive advantage. CONTRACTOR is obligated to fully disclose to the AUTHORITY in writing Conflict of Interest issues as soon as they are known to the CONTRACTOR.
All disclosures must be submitted in writing to AUTHORITY pursuant to the Notice provision herein. This disclosure requirement is for the entire term of this Agreement.
ARTICLE 22. CODE OF CONDUCT
CONTRACTOR agrees to comply with the AUTHORITY’s Code of Conduct as it relates to Third-
Party contracts which is hereby referenced and by this reference is incorporated herein. CONTRACTOR agrees to include these requirements in all of its subcontracts.
ARTICLE 23. PROHIBITION ON PROVIDING ADVOCACY SERVICES
CONTRACTOR and all subcontractors performing work under this Agreement, shall be prohibited from concurrently representing or lobbying for any other party competing for a contract with AUTHORITY, either as a prime contractor or subcontractor. Failure to refrain from such representation may result in termination of this Agreement.
ARTICLE 24. FEDERAL, STATE AND LOCAL LAWS
CONTRACTOR warrants that in the performance of this Agreement it shall comply with all applicable federal, state and local laws, statutes and ordinances and all lawful orders, rules and regulations promulgated thereunder.
ARTICLE 25. EQUAL EMPLOYMENT OPPORTUNITY
In connection with its performance under this Agreement, CONTRACTOR agrees that it shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, age or national origin. CONTRACTOR shall take affirmative action to ensure that applicants are employed, and that employees are treated during their employment, without regard to their race, religion, color, sex, age or national origin. Such actions shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
ARTICLE 26. FINISHED AND PRELIMINARY DATA
A. All of CONTRACTOR’s finished technical data, including but not limited to illustrations, photographs, tapes, software, software design documents, including without limitation source code, binary code, all media, technical documentation and user documentation, photoprints and other graphic information required to be furnished under this Agreement, shall be AUTHORITY’s property upon payment and shall be furnished with unlimited rights and, as such, shall be free from proprietary restriction except as elsewhere authorized in this Agreement. CONTRACTOR further agrees that it shall have no interest or claim to such finished, AUTHORITY-owned, technical data; furthermore, said data is subject to the provisions of the Public Records Act.
B. It is expressly understood that any title to preliminary technical data is not passed to
AUTHORITY but is retained by CONTRACTOR. Preliminary data includes roughs, visualizations, software design documents, layouts and comprehensives prepared by CONTRACTOR solely for the purpose of demonstrating an idea or message for AUTHORITY’s acceptance before approval is given for preparation of finished artwork. Preliminary data title and right thereto shall be made available to
AUTHORITY if CONTRACTOR causes AUTHORITY to exercise Article 17, and a price shall be negotiated for all preliminary data.
ARTICLE 27. PRIVACY ACT
CONTRACTOR shall comply with, and assures the compliance of its employees with, the information restrictions and other applicable requirements of the Privacy Act of 1974, 5 U.S.C. §552a.
Among other things, CONTRACTOR agrees to obtain the express consent of the Federal Government before CONTRACTOR or its employees operate a system of records on behalf of the Federal
Government. CONTRACTOR understands the requirements of the Privacy Act, including the civil and criminal penalties for violation of that Act, apply to those individuals involved, and that failure to comply with the terms of the Privacy Act may result in termination of the underlying Agreement.
ARTICLE 28. OWNERSHIP OF REPORTS AND DOCUMENTS
A. The originals of all letters, documents, reports and other products and data produced under this Agreement shall be delivered to, and become the property of AUTHORITY. Copies may be made for CONTRACTOR’S records but shall not be furnished to others without written authorization from
AUTHORITY. Such deliverables shall be deemed works made for hire and all rights in copyright therein shall be retained by AUTHORITY.
B. All ideas, memoranda, specifications, plans, manufacturing, procedures, drawings, descriptions, and all other written information submitted to CONTRACTOR in connection with the performance of this Agreement shall not, without prior written approval of AUTHORITY, be used for any purposes other than the performance under this Agreement, nor be disclosed to an entity not connected with the performance of the project. CONTRACTOR shall comply with AUTHORITY’s policies regarding such material. Nothing furnished to CONTRACTOR, which is otherwise known to CONTRACTOR or is or becomes generally known to the related industry shall be deemed confidential. CONTRACTOR shall not use AUTHORITY’s name, photographs of the project, or any other publicity pertaining to the project in any professional publication, magazine, trade paper, newspaper, seminar or other medium without the express written consent of AUTHORITY.
C. No copies, sketches, computer graphics or graphs, including graphic artwork, are to be released by CONTRACTOR to any other person or agency except after prior written approval by
AUTHORITY, except as necessary for the performance of services under this Agreement. All press releases, including graphic display information to be published in newspapers, magazines, etc., are to be handled only by AUTHORITY unless otherwise agreed to by CONTRACTOR and AUTHORITY.
ARTICLE 29. CONVICT LABOR
In connection with the performance of work under this Agreement, CONTRACTOR agrees not to employ any person undergoing sentence of imprisonment at hard labor. This does not include convicts who are on parole or probation.
ARTICLE 30. NOTICE OF LABOR DISPUTE
Whenever CONTRACTOR has knowledge that any actual or potential labor dispute may delay its performance under this Agreement, CONTRACTOR shall immediately notify and submit all relevant information to AUTHORITY. CONTRACTOR shall insert the substance of this entire clause in any subcontract hereunder as to which a labor dispute may delay performance under this Agreement.
However, any subcontractor need give notice and information only to its next higher-tier subcontractor.
ARTICLE 31. LIQUIDATED DAMAGES
If CONTRACTOR fails to complete the work within the time specified in Article 4 of this
Agreement, or any AUTHORITY authorized extension thereof, the actual damage to AUTHORITY for the delay will be difficult or impossible to determine. Therefore, in lieu of actual damages, CONTRACTOR shall pay to AUTHORITY as fixed, agreed-to liquidated damages for each calendar day of delay the sum of ___ Dollars ($ .00). Alternatively, AUTHORITY may terminate this Agreement in whole or in part as provided in Article 16 of this Agreement, and in that event, CONTRACTOR shall be liable, in addition to the excess costs provided in Article 16 of this Agreement, for such liquidated damages accruing until such time as AUTHORITY may reasonably obtain delivery or performance of similar supplies or services from a different source. CONTRACTOR shall not be charged with liquidated damages when the delay is determined to be excusable in accordance with Article 45 hereunder. AUTHORITY shall ascertain the facts and extent of the delay and shall extend the time for performance of the Agreement when in its judgment, the findings of fact justify an extension.
ARTICLE 32. WARRANTY
A. In addition to any other warranties set forth in this Agreement, whether expressed or implied, CONTRACTOR warrants that (1) all work performed and all equipment and material provided under this
Agreement by CONTRACTOR or any of its subcontractors or suppliers at any tier, conforms to the requirements herein and is free of any defects; (2) equipment furnished by CONTRACTOR or any of its subcontractors or suppliers at any tier, shall be of modern design, in good working condition and fit for use of its intended purpose; and (3) all work shall meet all of the requirements of this Agreement. Such warranty shall continue for a period of one (1) year from AUTHORITY's acceptance as shown in Article
34 hereunder. Under this warranty, CONTRACTOR shall remedy at its own expense any such failure to conform or correct any such defect. In addition, CONTRACTOR shall remedy at its own expense any damage to AUTHORITY owned or controlled real or personal property, when that damage is the result of CONTRACTOR's failure to conform to Agreement requirements or any such defect of equipment, material, workmanship or design. CONTRACTOR shall also restore any work damaged in fulfilling the terms of this clause. CONTRACTOR's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
B. AUTHORITY shall notify CONTRACTOR in writing within a reasonable time after the discovery of any failure, defect or damage. CONTRACTOR has seven days from receipt of notice from
AUTHORITY to respond to AUTHORITY’s notification and indicate how CONTRACTOR will remedy the failure, defect, or damage. If AUTHORITY is not satisfied with the remedy proposed by CONTRACTOR, CONTRACTOR and AUTHORITY shall meet and mutually agree when and how CONTRACTOR shall remedy such violation. In the case of an emergency requiring immediate corrective action, CONTRACTOR shall implement such action, as it deems necessary and shall notify AUTHORITY in writing of the urgency of a decision and action taken. CONTRACTOR and AUTHORITY shall, then promptly meet in order to agree on a remedy. If CONTRACTOR and AUTHORITY fail to agree on the remedy within a five-day period, AUTHORITY, after notice to CONTRACTOR, shall have the right to perform or have performed by third parties the necessary remedy, and the costs thereof shall be borne by CONTRACTOR.
C. Should CONTRACTOR fail to remedy any failure, defect or damage described in paragraph
A above within a reasonable time after receipt of notice thereof, AUTHORITY shall have the right to replace, repair or otherwise remedy such failure, defect or damage at CONTRACTOR's expense and
CONTRACTOR shall be liable for all damages, including, but not limited to, actual or consequential damages and cost of any suit to enforce AUTHORITY's rights hereunder, including reasonable attorney's fees.
D. In addition to the other rights and remedies provided by this clause, all subcontractors, manufacturers, and suppliers' warranties, expressed or implied, respecting any work and materials furnished hereunder, shall, at the direction of AUTHORITY, be enforced by CONTRACTOR for the benefit of AUTHORITY. In such case if CONTRACTOR's warranty under paragraph A above has expired, any suit directed by AUTHORITY shall be at the expense of AUTHORITY. CONTRACTOR shall obtain any warranties, which the subcontractors, manufacturers or suppliers would give in normal commercial practice and shall cause all subcontractor or supplier warranties to be extend to AUTHORITY.
E. If directed by AUTHORITY, CONTRACTOR shall require any such warranties to be executed in writing to AUTHORITY.
F. Notwithstanding any other provision of this clause, unless such a defect is caused by the negligence of CONTRACTOR or its subcontractors or suppliers at any tier, CONTRACTOR shall not be liable for the repair of any defects of material or design furnished by AUTHORITY nor for the repair of any damage which results from any such defect in AUTHORITY furnished material or design.
G. The warranty specified herein shall not limit AUTHORITY's rights under the Inspection and
Acceptance clause of this Agreement with respect to latent defects, gross mistakes or fraud.
H. Defects in design or manufacture of equipment specified by AUTHORITY on a "brand name and model" basis shall not be included in this warranty. CONTRACTOR shall require any subcontractors, manufacturers or suppliers thereof to execute their warranties in writing directly to AUTHORITY.
I. Any disagreement between AUTHORITY and CONTRACTOR relating to this section shall be subject to dispute resolution in accordance with Article 15.
ARTICLE 33. GENERAL WAGE RATES
A. All laborers and mechanics employed by CONTRACTOR or subcontractor at any tier working on the construction site, will be paid unconditionally and not less often than once a week and without any subsequent deduction or rebate on any account (except such payroll deductions as are permitted or required by federal, state or local law, regulation or ordinance), the full amounts due at the time of payment computed at wage rates and per diem rate not less than the aggregate of the highest of the two basic hourly rates and rates of payments, contributions or costs for any fringe benefits contained in the current general prevailing wage rate(s) and per diem rate(s), established by the Director of the Department of
Industrial Relations of the State of California, (as set forth in the Labor Code of the State of California, commencing at Section 1770 et. seq.), regardless of any contractual relationship which may be alleged to exist between CONTRACTOR or subcontractor and their respective mechanics, laborers, journeypersons, workpersons, craftspersons or apprentices. Copies of the current General Prevailing
Wage Determinations and Per Diem Rates are on file at AUTHORITY's offices and will be made available to CONTRACTOR upon request. CONTRACTOR shall post a copy thereof at each job site at which work hereunder is performed.
B. In addition to the foregoing, CONTRACTOR agrees to comply with all other provisions of the
Labor Code of the State of California, which are incorporated herein by reference, pertaining to workers performing work hereunder including, but not limited to, those provisions for work hours, payroll records and apprenticeship employment and regulation program. CONTRACTOR agrees to insert or cause to be inserted the preceding clause in all subcontracts, which provide for workers to perform work hereunder regardless of the subcontractor tier.
ARTICLE 34. INSPECTION AND ACCEPTANCE
A. All work (which term includes but is not restricted to materials, equipment, workmanship, and manufacture and fabrication of components) shall be subject to inspection and test by AUTHORITY at all reasonable times and at all places prior to acceptance. Any such inspection and test is for the sole benefit of AUTHORITY and shall not relieve CONTRACTOR of the responsibility of providing quality control measures to assure that the work strictly complies with requirements of this Agreement. No inspection or test by AUTHORITY or its representative shall be construed as constituting or implying acceptance.
Inspection or test shall not relieve CONTRACTOR of responsibility for damage to or loss of the material prior to acceptance, nor in any way affect the continuing rights of AUTHORITY after acceptance of the completed work under the terms of paragraph F of this Article, except as herein above provided.
B. CONTRACTOR shall, without charge, replace any material or correct any workmanship found by AUTHORITY not to conform to the requirements of this Agreement, unless in the public interest
AUTHORITY consents to accept such material or workmanship with an appropriate adjustment in the price of this Agreement. CONTRACTOR shall promptly segregate and remove rejected material from the premises.
C. CONTRACTOR shall furnish promptly, without additional charge, all facilities, labor, equipment and material reasonably needed for performing such safe and convenient inspection and test as may be required by AUTHORITY. All inspections and tests by AUTHORITY shall be performed in such manner as to not unnecessarily delay the work. AUTHORITY reserves the right to charge to
CONTRACTOR any additional cost of inspection or test when material or workmanship is not ready at the time specified by CONTRACTOR for inspection or test or when reinspection or retest is necessitated by prior rejection.
D. If CONTRACTOR does not promptly replace rejected material or correct rejected workmanship, AUTHORITY (1) may, by Agreement or otherwise, replace such material or correct such workmanship and charge the cost thereof to CONTRACTOR, or (2) may terminate CONTRACTOR's right to proceed in accordance with the clause of this Agreement entitled "Termination for Default."
E. Should it be considered necessary or advisable by AUTHORITY at any time before acceptance of the entire work to make an examination of work already completed, by removing or tearing out same, CONTRACTOR shall, on request, promptly furnish all necessary facilities, labor and material.
If such work is found to be defective or nonconforming in any material respect, due to the fault of
CONTRACTOR or its subcontractors, CONTRACTOR shall pay all costs of such examination and of satisfactory reconstruction. If, however, such work is found to meet the requirements of this Agreement, an equitable adjustment shall be made in the Agreement price to compensate CONTRACTOR for the additional services involved in such examination and reconstruction and, if completion of the work has been delayed thereby, it shall in addition, be granted a suitable extension of time.
F. Unless otherwise provided in this Agreement, acceptance by AUTHORITY shall be made as promptly as practicable after completion and inspection of all work required by this Agreement, or that portion of the work that AUTHORITY determines can be accepted separately. Acceptance shall be final and conclusive except as regards latent defects, fraud, or such gross mistakes as may amount to fraud or as regards AUTHORITY's rights under the warranty provisions set forth herein.
ARTICLE 35. MATERIAL AND WORKMANSHIP
A. Unless otherwise specifically provided in this Agreement, all equipment, material, and articles incorporated in the work covered by this Agreement are to be new and of the most suitable grade for the purpose intended. Unless otherwise specifically provided in this Agreement, reference to any equipment, material, article or patented process, by trade name, make or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition, and CONTRACTOR may, at its option, use any equipment, material, article or process which, in the judgment of AUTHORITY, is equal to that named. CONTRACTOR shall furnish to AUTHORITY for its approval the name of the manufacturer, the model number and other identifying data and information respecting the performance, capacity, nature and rating of the machinery and mechanical and other equipment, which CONTRACTOR contemplates incorporating in the work. When required by this Agreement or when called for by
AUTHORITY, CONTRACTOR shall furnish AUTHORITY, for approval, full information concerning the material or articles, which it contemplates incorporating in the work. When so directed, samples shall be submitted for approval at CONTRACTOR's expense, with all shipping charges prepaid. Machinery, equipment, material and articles installed or used without required approval shall be at the risk of subsequent rejection.
B. All work under this Agreement shall be performed in a skillful and workmanlike manner.
Notwithstanding the provisions of Article 3 hereof, AUTHORITY may, in writing, require CONTRACTOR to remove from the work any employee AUTHORITY deems incompetent, careless or otherwise objectionable.
ARTICLE 36. NON-CONFORMING WORK
A. Nonconforming work rejected by AUTHORITY shall be removed and replaced so as to conform to the requirements of this Agreement, at CONTRACTOR’s cost and without a time extension;
and CONTRACTOR shall promptly take all action necessary to prevent similar deficiencies from occurring in the future. The fact that AUTHORITY may not have discovered the nonconforming Work shall not constitute an acceptance of such nonconforming Work. If CONTRACTOR fails to correct any nonconforming work within ten days of receipt of notice from AUTHORITY requesting correction, or if such nonconforming work cannot be corrected within ten days, and CONTRACTOR fails to (1) provide to AUTHORITY a schedule for correcting any such nonconforming work acceptable to AUTHORITY within such ten-day period, (2) commence such corrective work within such ten-day period and (3) thereafter diligently prosecute such correction in accordance with such approved schedule to completion, then AUTHORITY may cause the nonconforming work to be remedied or removed and replaced and may deduct the cost of doing so from any moneys due or to become due CONTRACTOR and/or obtain reimbursement from CONTRACTOR for such cost.
B. If AUTHORITY agrees to accept any Nonconforming Work without requiring it to be fully corrected, AUTHORITY shall be entitled to reimbursement of a portion of the Contract Price in an amount equal to the greater of the amount deemed appropriate by AUTHORITY to provide compensation for future maintenance and/or other costs relating to the Nonconforming Work, or 100% of CONTRACTOR’s cost savings associated with its failure to perform the Work in accordance with Contract requirements.
Such reimbursement shall be payable to AUTHORITY within ten days after CONTRACTOR’s receipt of an invoice thereof. CONTRACTOR acknowledges and agrees that AUTHORITY shall have sole discretion regarding acceptance or rejection of Nonconforming Work and that AUTHORITY shall have sole discretion with regard to the amount payable in connection therewith.
ARTICLE 37. CONTRACTOR INSPECTION SYSTEM
CONTRACTOR shall maintain an adequate inspection system and perform such inspections as will assure that the work performed under this Agreement conforms to the specified requirements, and shall maintain and make available to AUTHORITY adequate records of such inspections.
ARTICLE 38. SUPERINTENDENCE BY CONTRACTOR
CONTRACTOR, at all times during performance and until the work is completed and accepted, shall give its personal superintendence to the work or have on the work a competent superintendent, satisfactory to AUTHORITY and with authority to act for and on behalf of CONTRACTOR.
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .