IFB 250017 Facility Modifications at Santa Ana Bus Base Operations Building
Solicitation number
250017
Issued by
Orange County, California

About this file

This is an Independent Cost Estimate (ICE) document prepared by the Orange County Transportation Authority (OCTA) for facility modifications at the Santa Ana Bus Base Operations Building in California. The project encompasses three primary work areas: sitework (965 square feet), floor finishes replacement (3,994 square feet), and lobby millwork replacement (55 linear feet). The scope of work includes site demolition and protection, earthwork, exterior improvements, selective demolition of existing finishes, installation of LVT tile flooring with stainless steel base trim, furniture reinstallation, and comprehensive millwork replacement including base cabinets, wall-mounted counters, and island cabinetry with solid surface tops. The cost estimate was prepared by Eric Torres, Senior Project Manager, and dated July 8, 2025, with the estimate revised on June 23, 2025. Construction is anticipated to begin in December 2025 with a six-month duration, with the midpoint of construction estimated at March 2026.

The total estimated project cost is $330,000.00, comprised of $288,172 in base construction costs plus $5,749 in escalation allowance and $36,000 for on-site health, safety, and environment representative costs. The escalation allowance is calculated at 2 percent based on a 3 percent annual escalation rate from the June 2025 base month to the March 2026 construction midpoint. Cost breakdowns include sitework at $51,727 (including $6,000 for on-site representation), floor finishes replacement at $196,607 (including $18,000 for on-site representation), and lobby millwork replacement at $81,587 (including $12,000 for on-site representation). The estimate accounts for general requirements, contractor bonds at 2.75 percent, and contractor fees at 10 percent across all work categories. Direct labor costs total $330,000.00 with no overhead, materials, IT support, travel, or subcontractor costs separately itemized, indicating all costs are incorporated into the construction cost summaries.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEPENDENT COST ESTIMATE (ICE)

FA-CAMM-006.docm (07/07/10) Page 1 of 3

INSTRUCTIONS

Complete and submit all three pages to Contracts Administration & Materials Management (CAMM), along with your requisition and scope of work. CAMM will not start the procurement until all three documents have been received.

PART I – GENERAL INFORMATION

Project Description: Facility Modifications at Santa Ana Bus Base Operations Building

SHADED AREA FOR PROCUREMENT USE ONLY

Assigned Buyer No.:

D/M/WBE%:

Purchase Requisition No.: 035570

New Contract / Procurement

Contract Amendment Contract / PO No.:

Contract Task Order Contract / PO No.:

Option Term Contract / PO No.:

Date: 7/8/2025

Requestor: Eric Torres Senior Project Manager Phone Ext.: 5345

Name Title

Signature:

Cost

Estimate: $ 330,000.00 (include shipping, handling and taxes, if applicable)

PART II – ESTIMATE GUIDE

Please substantiate the estimate using the following information.

Estimate Type Items to Include Where to Find Supporting Information

Services (Other than A&E)

1. Tasks you want done

2. Types of people needed (i.e., supervisor, administrative assistant, other)

3. Positions required (i.e., Project Manager, Deputy PM, Senior Engineer / Planner, other)

4. Estimated hours by position

5. Salary / billing rates applied

6. Prevailing wage rate category applied

7. Profit / applied fee

8. Direct expenses

9. Completion schedule

1. Current or past contracts for similar services

2. Other properties / departments doing similar work

3. Historical price and cost data

Estimate Guide Continued

FA-CAMM-006.docm (07/07/10) Page 2 of 3

Estimate Type Items to Include Where to Find Supporting Information

Architects, Engineers, Designers

1. Tasks you want done

2. Types of people needed (i.e., engineers, administrative assistant, other)

3. Positions (Project Manager, Deputy PM, Senior Engineer / Planner, other)

4. Estimated hours by position

5. Salary / billing rates applied

6. Profit / applied fee

7. Overhead rate (%)

8. Direct expenses

9. Completion schedule

1. Current or past contracts for similar services

2. Other properties / departments doing similar work

3. Historical price and cost data

Goods/Equipment 1. Product needed

2. Quantity

3. Unit price

4. Markups, overhead, profit

5. Delivery schedule desired

6. Warranty

1. Vendor survey / market survey

2. Current or past contracts for the same or similar product

3. Historical price and cost data

4. Various published indices

Construction 1. Product needed

2. Labor (at a minimum use Davis Bacon)

3. Materials

4. Bonds

5. Insurance

6. Mobilization

7. Equipment

8. Markups, fringes, overheads, profit

9. Completion schedule

1. “Means Book”

2. “Blue Book”

3. Davis Bacon wage rates / prevailing wages

4. Current or past contracts for the same project

5. Historical price and cost data

Additional Information:

FA-CAMM-006.docm (07/07/10) Page 3 of 3

PART III – INDEPENDENT COST ESTIMATE

Using the information provided in Part II, prepare the ICE for your procurement.

Use any or all of the categories listed below.

Prepared By: Eric Torres Date: 7/8/2025

Signature:

DESCRIPTION OF COST ELEMENTS

1. DIRECT LABOR

(List of Labor Categories)

Estimated Hours

Rate Per Hour ($)

Estimated Cost ($)

Total Est.

Cost ($)

(See Attachment to ICE form) 1 $ 330,000.00 $ 330,000.00

$ $ 0.00

$ $ 0.00

$ $ 0.00

$ $ 0.00

$ $ 0.00

Total Direct Labor: $ 330,000.00

2. OVERHEAD

Rate (%)

(use decimal input)

Total Labor ($)

Estimated Cost ($)

Total Est.

Cost ($)

$ 330,000.00 $ 0.00 $ 0.00

3. MATERIALS/SERVICES (Excluding Information Technology [IT]) Estimated Cost ($)

Total Est.

Cost ($)

Materials $ 0.00 $ 0.00

4. INFORMATION TECHNOLOGY SUPPORT

Estimated Cost ($)

Total Est.

Cost ($)

Total IT Support: $ 0.00

5. TRAVEL

Estimated

Cost ($) Total Est.

Cost ($)

$ $ 0.00

6. SUBCONTRACTOR(S) / CONSULTANT(S)

Estimated

Cost ($) Total Est.

Cost ($)

Total Subcontractor(s) / Consultant(s): $ 0.00

7. OTHER DIRECT COSTS

Estimated

Cost ($) Total Est.

Cost ($)

$ $ 0.00

8. TOTAL ESTIMATED COST: $ 330,000.00

LOCATION: SANTA ANA, CA DATE: 13-Jun-25

CLIENT: OCTA REVISED DATE: 23-Jun-25

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - SUMMARY

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCT.

COST

TOTAL

ESCALATION

COST

ON SITE HSE

REP COST

TOTAL

CONSTRUCT.

COST

SUMMARY OF ESTIMATE $ $

0.17 SITEWORK 965 SF 46.46 44,833 894 6,000 51,727

0.61 FLOOR FINISHES REPLACEMENT 3,994 SF 43.84 175,113 3,494 18,000 196,607

0.22 LOBBY MILLWORK REPLACEMENT 55 LF 1,236.65 68,226 1,361 12,000 81,587

TOTAL OF ESTIMATED CONSTRUCTION COST 288,172 5,749 36,000 329,921

ESCALATION INCLUDED IN THE ABOVE, IS BASED ON THE

FOLLOWING:

BASE MONTH Jun-25

CONSTRUCTION START MONTH Dec-25

CONSTRUCTION DURATION (MONTHS) 6.0

MID POINT OF CONSTRUCTION Mar-26

% ANNUAL ESCALATION 3%

ALLOWANCE FOR ESCALATION (TO MIDPOINT OF

CONSTRUCTION)

2%

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - SITEWORK NET SITE AREA: 965

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

SUMMARY OF ESTIMATE $ $

1.0 GENERAL REQUIREMENTS

2.0 EXISTING CONDITIONS 24.83% 9.30 8,975

31.0 EARTHWORK 36.08% 13.52 13,042

32.0 EXTERIOR IMPROVEMENTS 39.09% 14.64 14,131

33.0 UTILITIES

SUBTOTAL 100.00% 37.46 36,148

PRORATES:

GENERAL CONDITIONS / GENERAL REQUIREMENTS 10.00% 3.75 3,615

SUBTOTAL 41.21 39,763

CONTRACTOR'S MARK-UP:

BONDS 2.75% 1.13 1,093

CONTRACTOR'S FEE 10.00% 4.12 3,976

TOTAL OF CONSTRUCTION COST W/OUT ESCALATION 46.46 44,833

ADDITIONAL GENERAL REQUIREMENT

ON SITE HSE REP COST 60 HRS 100.00 6,000

TOTAL OF CONSTRUCTION COST WITHOUT ESCALATION + ON

SITE HSE REP COST

50,833

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

Page 2 SITEWORK

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - SITEWORK NET SITE AREA: 965

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

1.0 GENERAL REQUIREMENTS $

ADDITIONAL GENERAL REQUIREMENT

ON SITE HSE REP COST SEE SUMMARY OF

THIS SECTION

ABOVE

SUBTOTAL

2.0 EXISTING CONDITIONS $

SITE DEMOLITION (HAULING INCLUDED) - LOCATION 1

SAWCUT (E) PCC SIDEWALK 6 LF 16.50 99

REMOVE (E) PCC PAVING & BASE 165 SF 5.50 908

REMOVE 12"W PORTION OF (E) LANDSCAPE 55 LF 4.40 242

PRUNE (E) TREE ROOT 2 EA 275.00 550

PROTECT (E) BUILDING ACCESS DOOR 1 EA 115.00 115

PROTECT (E) TREE 2 EA 285.00 570

PROTECT PORTION OF (E) SIDEWALK & C&G 50 SF 0.83 42

PROTECT +/-10'L OF (E) UTILITY LINES 3 EA 188.10 564

MISC. LOCATION 1 DEMO & PROTECTION WORK 1 LS 500.00 500

SITE DEMOLITION (HAULING INCLUDED) - LOCATION 2

SAWCUT (E) PCC SIDEWALK 20 LF 16.50 330

REMOVE (E) PCC PAVING & BASE 482 SF 5.50 2,651

REMOVE (E) PLANTING & IRRIGATION 255 SF 3.85 982

REMOVE 12"W PORTION OF (E) LANDSCAPE/IRRIGATION @

WESTERN PORTION

8 LF 4.40 33

PROTECT (E) BUILDING ACCESS DOOR 1 EA 115.00 115

PROTECT (E) WALL 37 LF 6.60 244

PROTECT (E) WALL DRAIN 1 EA 132.50 133

PROTECT (E) POLE SIGNAGE 1 EA 115.00 115

PROTECT PORTION OF (E) SIDEWALK & C&G 340 SF 0.83 282

MISC. LOCATION 2 DEMO & PROTECTION WORK 1 LS 500.00 500

SUBTOTAL 8,975

31.0 EARTHWORK $

SITE PREPARATION - LOCATION 1

SITE CLEARING 220 SF 1.11 244

ROUGH GRADING 220 SF 1.65 363

CUT/REMOVE 18"D OF SUBGRADE 12 CY 60.50 739

IMPORT GRANULAR SOIL + 15% SHRINKAGE 14 CY 82.50 1,160

FILL & COMPACT 14 CY 38.50 541

FINE GRADING 220 SF 1.93 425

DIRT EXPORT + 15% SWELL VOLUME 14 CY 137.50 1,933

EROSION CONTROL 220 SF 1.10 242

Page 3 SITEWORK

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - SITEWORK NET SITE AREA: 965

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

SITE PREPARATION - LOCATION 2

SITE CLEARING 575 SF 1.10 633

ROUGH GRADING 575 SF 1.65 949

CUT/REMOVE 6"D OF SUBGRADE 9 CY 60.50 540

CUT/REMOVE 18"D OF SUBGRADE N/A PER C.E.

DIRT CUT @ DITCH 0.3 CY 165.00 50

IMPORT GRANULAR SOIL + 15% SHRINKAGE 11 CY 82.50 908

FILL & COMPACT 11 CY 38.50 424

FINE GRADING 575 SF 1.93 1,110

12"D SCARIFY & COMPACT SUBGRADE 482 SF 1.43 689

DIRT EXPORT + 15% SWELL VOLUME 11 CY 137.50 1,459

EROSION CONTROL 575 SF 1.10 633

SUBTOTAL 13,042

32.0 EXTERIOR IMPROVEMENTS $

HARDSCAPE/LANDSCAPE - LOCATION 1

CONCRETE SIDEWALK, 4" 165 SF 9.84 1,624

THICKENED CONCRETE 1 CY 715.00 728

VAPOR BARRIER (VISQUEEN) 165 SF 0.83 137

JOIN CONCRETE/EXPANSION JOINT W/ DOWEL 6 LF 66.00 396

EXPANSION JOINT, NO DOWEL 6 LF 11.00 66

RESTORE PLANTING, MATCH EXISTING 55 SF 13.20 726

REPLACE ANY IRRIGATION THAT WAS DAMAGED DUE TO TREE

ROOT REMOVAL OR ROOT BARRIER INSTALLATION

55 SF 7.15 393

ROOT BARRIER 55 LF 17.66 971

HARDSCAPE/LANDSCAPE - LOCATION 2

CONCRETE SIDEWALK, 4" thk 557 SF 9.84 5,481

AGGREGATE BASE, 6" thk N/A

THICKENED CONCRETE 0.4 CY 715.00 285

VAPOR BARRIER (VISQUEEN) 557 SF 0.83 462

12"W x 3" thk CONCRETE CHANNEL, 1:1 SLOPE 10 LF 44.23 442

JOIN CONCRETE/EXPANSION JOINT W/ DOWEL 25 LF 66.00 1,650

EXPANSION JOINT, NO DOWEL 70 LF 11.00 770

RESTORE PLANTING, MATCH EXISTING N/A

IRRIGATION N/A

SUBTOTAL 14,131

33.0 UTILITIES $

SITE UTILITIES

ASSUME NOT INCLUDED

SUBTOTAL

Page 4 SITEWORK

WORK AREA: 3,994

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

SUMMARY OF ESTIMATE $ $

1.0 GENERAL REQUIREMENTS 7.90% 2.79 11,157

2.0 EXISTING CONDITIONS 20.82% 7.36 29,398

3.0 CONCRETE

4.0 MASONRY

5.0 METALS

6.0 WOOD, PLASTICS & COMPOSITES

7.0 THERMAL & MOISTURE PROTECTION 0.55% 0.20 779

8.0 OPENINGS 0.79% 0.28 1,112

9.0 FINISHES 60.08% 21.24 84,834

10.0 SPECIALTIES

11.0 EQUIPMENT

12.0 FURNISHINGS 9.85% 3.48 13,912

13.0 SPECIAL CONSTRUCTION

14.0 CONVEYING

21.0 FIRE SUPPRESSION

22.0 PLUMBING

23.0 HVAC

26.0 ELECTRICAL

27.0 COMMUNICATIONS

28.0 ELECTRONIC SAFETY & SECURITY

SUBTOTAL 100.00% 35.35 141,192

PRORATES:

GENERAL CONDITIONS / GENERAL REQUIREMENTS 10.00% 3.54 14,119

SUBTOTAL 38.89 155,311

CONTRACTOR'S MARK-UP:

BONDS 2.75% 1.07 4,271

CONTRACTOR'S FEE 10.00% 3.89 15,531

TOTAL OF CONSTRUCTION COST W/OUT ESCALATION 43.84 175,113

ADDITIONAL GENERAL REQUIREMENT

ON SITE HSE REP COST 180 HRS 100.00 18,000

TOTAL OF CONSTRUCTION COST WITHOUT ESCALATION + ON

SITE HSE REP COST

193,113

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - FLOOR FINISHES

REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

Page 5 FLOOR FINISHES

WORK AREA: 3,994

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - FLOOR FINISHES

REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

1.0 GENERAL REQUIREMENTS $

ADDITIONAL GENERAL REQUIREMENT

ON SITE HSE REP COST SEE SUMMARY OF

THIS SECTION

ABOVE

DUST BARRIER + REMOVAL (RE-USABLE)

PHASE 1 5 LF 115.93 580

PHASE 2 15 LF 115.93 1,739

PHASE 3 10 LF 115.93 1,159

PHASE 4 11 LF 115.93 1,275

PHASE 5 4 LF 115.93 464

PHASE 6 13 LF 115.93 1,507

AREA CLEAN-UP 3,994 GSF 1.11 4,433

SUBTOTAL 11,157

2.0 EXISTING CONDITIONS $

SELECTIVE DEMOLITION - PHASE 1

REMOVE (E) OFFICE ROOM/CORRIDOR FURNISHINGS & SAVE/STORE

FOR RE-INSTALLATION - ALLOWANCE

910 SF 2.78 2,533

REMOVE (E) FLOOR FINISH 910 SF 2.79 2,539

REMOVE (E) WALL BASE 268 LF 1.67 448

REMOVE (E) INT. DOOR STOP 4 EA 33.44 134

PROTECT (E) DOOR/FRAME 5 EA 97.54 488

PROTECT (E) STORAGE SHELVING 23 LF 8.92 205

MISC. PHASE 1 DEMO & PROTECTION WORK 1 LS 365.00 365

SELECTIVE DEMOLITION - PHASE 2

REMOVE (E) OFFICE ROOM/CORRIDOR FURNISHINGS & SAVE/STORE

FOR RE-INSTALLATION - ALLOWANCE

658 SF 2.78 1,831

REMOVE (E) FLOOR FINISH 658 SF 2.79 1,836

REMOVE (E) WALL BASE 184 LF 1.67 307

REMOVE (E) INT. DOOR STOP 2 EA 33.44 67

PROTECT (E) DOOR/FRAME 5 EA 97.54 488

PROTECT (E) CASEWORK 6 LF 22.29 134

PROTECT (E) HI-LO DRINKING FOUNTAIN 1 EA 167.20 167

MISC. PHASE 2 DEMO & PROTECTION WORK 1 LS 285.00 285

SELECTIVE DEMOLITION - PHASE 3

REMOVE (E) OFFICE ROOM/CORRIDOR FURNISHINGS & SAVE/STORE

FOR RE-INSTALLATION - ALLOWANCE

824 SF 2.78 2,293

REMOVE (E) FLOOR FINISH 824 SF 2.79 2,299

REMOVE (E) WALL BASE 222 LF 1.67 371

REMOVE (E) INT. DOOR STOP 3 EA 33.44 100

PROTECT (E) DOOR/FRAME 5 EA 97.54 488

MISC. PHASE 3 DEMO & PROTECTION WORK 1 LS 325.00 325

SELECTIVE DEMOLITION - PHASE 4

REMOVE (E) OFFICE ROOM/CORRIDOR FURNISHINGS & SAVE/STORE

FOR RE-INSTALLATION - ALLOWANCE

394 SF 2.78 1,097

REMOVE (E) FLOOR FINISH 394 SF 2.79 1,099

REMOVE (E) WALL BASE 120 LF 1.67 200

Page 6 FLOOR FINISHES

WORK AREA: 3,994

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - FLOOR FINISHES

REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

REMOVE (E) INT. DOOR STOP 2 EA 33.44 67

PROTECT (E) DOOR/FRAME 2 EA 97.54 195

MISC. PHASE 4 DEMO & PROTECTION WORK 1 LS 155.00 155

SELECTIVE DEMOLITION - PHASE 5

REMOVE (E) DISPATCH ROOM FURNISHINGS & SAVE/STORE FOR RE-

INSTALLATION - ALLOWANCE

394 SF 2.78 1,097

REMOVE (E) FLOOR FINISH 438 SF 2.79 1,222

REMOVE (E) WALL BASE 76 LF 1.67 127

PROTECT (E) DOOR/FRAME 1 EA 97.54 98

PROTECT (E) DISPATCH WALL COUNTER 46 LF 8.92 410

MISC. PHASE 5 DEMO & PROTECTION WORK 1 LS 165.00 165

SELECTIVE DEMOLITION - PHASE 6

REMOVE (E) CONFERENCE ROOM FURNISHINGS & SAVE/STORE FOR

RE-INSTALLATION - ALLOWANCE

770 SF 2.78 2,143

REMOVE (E) FLOOR FINISH 770 SF 2.79 2,148

REMOVE (E) WALL BASE 110 LF 1.67 184

REMOVE (E) INT. DOOR STOP 2 EA 33.44 67

PROTECT (E) DOOR/FRAME 2 EA 97.54 195

PROTECT (E) WALL SCREEN 1 EA 139.34 139

PROTECT (E) OPERABLE PARTITION 1 EA 581.87 582

MISC. PHASE 6 DEMO & PROTECTION WORK 1 LS 305.00 305

SUBTOTAL 29,398

3.0 CONCRETE $

THIS SECTION NOT APPLICABLE

SUBTOTAL

4.0 MASONRY $

THIS SECTION NOT APPLICABLE

SUBTOTAL

5.0 METALS $

THIS SECTION NOT APPLICABLE

SUBTOTAL

6.0 WOOD, PLASTICS & COMPOSITES $

THIS SECTION NOT APPLICABLE

SUBTOTAL

7.0 THERMAL & MOISTURE PROTECTION $

CAULK & SEALANTS

MISC. CAULKING/SEALANTS ALLOWANCE 3,994 GSF 0.20 779

SUBTOTAL 779

Page 7 FLOOR FINISHES

WORK AREA: 3,994

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - FLOOR FINISHES

REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

8.0 OPENINGS $

INTERIOR DOOR HARDWARE

DOOR STOP - PHASE 1 4 EA 79.43 318

DOOR STOP - PHASE 2 2 EA 79.43 159

DOOR STOP - PHASE 3 3 EA 79.43 238

DOOR STOP - PHASE 4 2 EA 79.43 159

DOOR STOP - PHASE 5 1 EA 79.43 79

DOOR STOP - PHASE 6 2 EA 79.43 159

SUBTOTAL 1,112

9.0 FINISHES $

FLOOR FINISHES - PHASE 1

PREP (E) SUBFLOOR 910 SF 1.67 1,520

LVT TILE FLOORING - 5.8" x 37" PLANK 910 SF 13.40 12,194

6"H BRUSHED S/S W/ TOE 268 LF 24.34 6,522

FLOOR FINISHES - PHASE 2

PREP (E) SUBFLOOR 658 SF 1.67 1,099

LVT TILE FLOORING - 5.8" x 37" PLANK 658 SF 13.40 8,817

TS1 - RUBBER TRANSITION STRIP 6 LF 18.95 114

6"H BRUSHED S/S W/ TOE 184 LF 24.34 4,478

FLOOR FINISHES - PHASE 3

PREP (E) SUBFLOOR 824 SF 1.67 1,376

LVT TILE FLOORING 824 SF 13.40 11,042

6"H BRUSHED S/S W/ TOE 222 LF 24.34 5,403

FLOOR FINISHES - PHASE 4

PREP (E) SUBFLOOR 394 SF 1.67 658

LVT TILE FLOORING 394 SF 13.40 5,280

6"H BRUSHED S/S W/ TOE 120 LF 24.34 2,921

FLOOR FINISHES - PHASE 5

PREP (E) SUBFLOOR 438 SF 1.67 731

LVT TILE FLOORING 438 SF 13.40 5,869

6"H BRUSHED S/S W/ TOE 76 LF 24.34 1,850

FLOOR FINISHES - PHASE 6

PREP (E) SUBFLOOR 770 SF 1.67 1,286

LVT TILE FLOORING 770 SF 13.40 10,318

6"H BRUSHED S/S W/ TOE 110 LF 24.34 2,677

MISC. FINISHES

MISC. PAINTING/TOUCH-UP ALLOWANCE 3,994 GSF 0.17 679

SUBTOTAL 84,834

10.0 SPECIALTIES $

THIS SECTION NOT APPLICABLE

Page 8 FLOOR FINISHES

WORK AREA: 3,994

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - FLOOR FINISHES

REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

11.0 EQUIPMENT $

THIS SECTION NOT APPLICABLE

SUBTOTAL

12.0 FURNISHINGS $

EXISTING FURNISHINGS

RE-INSTALL (E) OFFICE ROOMS FURNISHINGS - PHASE 1 910 SF 3.48 3,170

RE-INSTALL (E) OFFICE ROOMS FURNISHINGS - PHASE 2 658 SF 3.48 2,292

RE-INSTALL (E) OFFICE ROOMS FURNISHINGS - PHASE 3 824 SF 3.48 2,870

RE-INSTALL (E) OFFICE ROOMS FURNISHINGS - PHASE 4 394 SF 3.48 1,372

RE-INSTALL (E) DISPATCH ROOM FURNISHINGS - PHASE 5 438 SF 3.48 1,526

RE-INSTALL (E) CONFERENCE ROOM FURNISHINGS - PHASE 6 770 SF 3.48 2,682

SUBTOTAL 13,912

13.0 SPECIAL CONSTRUCTION $

THIS SECTION NOT APPLICABLE

SUBTOTAL

14.0 CONVEYING $

THIS SECTION NOT APPLICABLE

SUBTOTAL

21.0 FIRE SUPPRESSION $

THIS SECTION NOT APPLICABLE

SUBTOTAL

22.0 PLUMBING $

THIS SECTION NOT APPLICABLE

SUBTOTAL

23.0 HVAC $

THIS SECTION NOT APPLICABLE

Page 9 FLOOR FINISHES

WORK AREA: 3,994

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - FLOOR FINISHES

REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

26.0 ELECTRICAL $

THIS SECTION NOT APPLICABLE

SUBTOTAL

27.0 COMMUNICATIONS $

THIS SECTION NOT APPLICABLE

SUBTOTAL

28.0 ELECTRONIC SAFETY & SECURITY $

THIS SECTION NOT APPLICABLE

Page 10 FLOOR FINISHES

MILLWORK LF: 55

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

SUMMARY OF ESTIMATE $ $

1.0 GENERAL REQUIREMENTS

2.0 EXISTING CONDITIONS 13.09% 130.56 7,203

3.0 CONCRETE

4.0 MASONRY

5.0 METALS 1.75% 17.42 961

6.0 WOOD, PLASTICS & COMPOSITES 80.54% 803.03 44,303

7.0 THERMAL & MOISTURE PROTECTION 0.65% 6.53 360

8.0 OPENINGS

9.0 FINISHES 3.97% 39.57 2,183

10.0 SPECIALTIES

11.0 EQUIPMENT

12.0 FURNISHINGS

13.0 SPECIAL CONSTRUCTION

14.0 CONVEYING

21.0 FIRE SUPPRESSION

22.0 PLUMBING

23.0 HVAC

26.0 ELECTRICAL

27.0 COMMUNICATIONS

28.0 ELECTRONIC SAFETY & SECURITY

SUBTOTAL 100.00% 997.10 55,010

PRORATES:

GENERAL CONDITIONS / GENERAL REQUIREMENTS 10.00% 99.71 5,501

SUBTOTAL 1,096.81 60,511

CONTRACTOR'S MARK-UP:

BONDS 2.75% 30.16 1,664

CONTRACTOR'S FEE 10.00% 109.68 6,051

TOTAL OF CONSTRUCTION COST W/OUT ESCALATION 1,236.65 68,226

ADDITIONAL GENERAL REQUIREMENT

ON SITE HSE REP COST 120 HRS 100.00 12,000

TOTAL OF CONSTRUCTION COST WITHOUT ESCALATION + ON

SITE HSE REP COST

80,226

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - LOBBY

MILLWORK REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

Page 11 LOBBY MILLWORK

MILLWORK LF: 55

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - LOBBY

MILLWORK REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

1.0 GENERAL REQUIREMENTS $

ADDITIONAL GENERAL REQUIREMENT

ON SITE HSE REP COST SEE SUMMARY OF

THIS SECTION

ABOVE

SUBTOTAL

2.0 EXISTING CONDITIONS $

SELECTIVE DEMOLITION

REMOVE (E) 22"W BASE CABINET & TOP W/ (4) FILE WELLS 5.8 LF 102.13 595

REMOVE (E) 30"W BASE CABINET & TOP W/ (8) FILE WELLS 6.3 LF 109.74 695

REMOVE (E) 28"W WALL-MOUNTED COUNTER 5.5 LF 59.70 328

REMOVE (E) 30"W WALL-MOUNTED COUNTER 13.2 LF 59.70 786

REMOVE (E) 30"W HI-LO WALL-MOUNTED COUNTER 6.0 LF 79.60 478

REMOVE (E) 7"W HI-LO WINDOW COUNTER 13.3 LF 33.17 440

REMOVE (E) 4'W x 14'L ISLAND COUNTER/CABINET 1 EA 1,300.15 1,300

PROTECT (E) 12"H S/S WALL BASE 36 LF 13.27 476

COVER & PROTECT (E) FLOOR FINISHES 1,092 SF 1.33 1,452

MISC. LOBBY MILLWORK DEMO & PROTECTION WORK 1 LS 653.33 653

SUBTOTAL 7,203

3.0 CONCRETE $

THIS SECTION NOT APPLICABLE

SUBTOTAL

4.0 MASONRY $

THIS SECTION NOT APPLICABLE

SUBTOTAL

5.0 METALS $

MISC. METALS

MISC. METALS ALLOWANCE (Wall backings for wall-mounted counters & metal support frames for island cabinetry)

1,092 SF 0.88 961

SUBTOTAL 961

6.0 WOOD, PLASTICS & COMPOSITES $

BASE COUNTER - FILE STORAGE MILLWORK

21.5"W PLAM BASE CABINET W/ SOLID SURFACE CORIAN TOP W/ (4)

- 13.5" x 15" FILE WELLS

5.83 LF 723.89 4,220

4"H S/S CABINET BASE 10 LF 31.43 314

WALL-MOUNTED BASE COUNTER - COMPUTER COUNTERS

30"W SOLID SURFACE CORIAN TOP + 1-LAYER OF 3/4" PLYWOOD

OVER (E) CONCEALED METAL BRACKETS

13.17 LF 281.92 3,713

Page 12 LOBBY MILLWORK

MILLWORK LF: 55

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - LOBBY

MILLWORK REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

30"W SOLID SURFACE CORIAN TOP + 1-LAYER OF 3/4" PLYWOOD

OVER (2) - 1/4" STEEL ANGLE BRACES

6.33 LF 323.84 2,050

SOLID SURFACE VERTICAL RETURN 6 SF 99.50 622

EXTRA FOR 4"H SOLID SURFACE EDGE 20 LF 32.84 640

EXTRA FOR 10"H SOLID SURFACE BACKSPLASH 20 LF 82.59 1,611

EXTRA FOR METAL GROMMET 4 EA 53.40 214

CABLE TRAY UNDERNEATH COUNTER 20 LF 84.24 1,643

STANDING HEIGHT COMPUTER COUNTER

28"W SOLID SURFACE CORIAN TOP + 1-LAYER OF 3/4" PLYWOOD

OVER (2) - 1/4" STEEL ANGLE BRACKETS

5.50 LF 310.99 1,710

SOLID SURFACE VERTICAL RETURN 16 SF 99.50 1,623

EXTRA FOR 3"H SOLID SURFACE EDGE 5.50 LF 24.88 137

EXTRA FOR 4"H SOLID SURFACE BACKSPLASH 5.50 LF 32.84 181

EXTRA FOR METAL GROMMET 2 EA 49.75 100

CABLE TRAY UNDERNEATH COUNTER 5.50 LF 84.24 463

WINDOW TRANSACTION COUNTERS

8.5"W SOLID SURFACE CORIAN TOP + 1-LAYER OF 3/4" PLYWOOD -

LOW COUNTER

13.17 LF 139.79 1,841

EXTRA FOR 3"H SOLID SURFACE EDGE 5.17 LF 44.78 232

EXTRA FOR 15"H SOLID SURFACE EDGE + SUBSTRATE OVER (E)

METAL STUD

8 LF 136.81 1,094

ISLAND CABINETRY - 4.17' x 11.17' PER DWG. A-400

3/4" x 4.17'W x 11.17'L SOLID SURFACE COUNTERTOP + 2-LAYER OF

3/4" PLYWOOD

1 EA 6,952.01 6,952

EXTRA FOR BULLNOSE EDGE 31 LF 59.70 1,832

11.5"D PLAM CABINET/DRAWERS BELOW 22 LF 431.17 9,486

(2) ADJUSTABLE MELAMINE SHELVES W/ RECESSED METAL

STANDARDS TO BOTH ENDS OF ISLAND

2 PR 265.34 531

WB-1 6"H S/S CABINET BASE 31 LF 32.18 987

MISCELLANEOUS

MISC. FINISH CARPENTRY ALLOWANCE 1 LS 2,106.65 2,107

SUBTOTAL 44,303

7.0 THERMAL & MOISTURE PROTECTION $

CAULK & SEALANTS

CAULKING/SEALANTS 1,092 SF 0.33 360

SUBTOTAL 360

8.0 OPENINGS $

THIS SECTION NOT APPLICABLE

SUBTOTAL

9.0 FINISHES $

FLOOR FINISHES

PATCH FLOOR FINISH, MATCH EXISTING 16 SF 16.58 262

12"H S/S WALL BASE 6 LF 37.71 239

Page 13 LOBBY MILLWORK

MILLWORK LF: 55

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - LOBBY

MILLWORK REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

INTERIOR WALLS

PATCH & PAINT (E) GWB WALL 30 SF 15.79 470

MISC. FINISHES

MISC. PAINTING/TOUCH-UP ALLOWANCE 1,092 SF 1.11 1,212

SUBTOTAL 2,183

10.0 SPECIALTIES $

THIS SECTION NOT APPLICABLE

SUBTOTAL

11.0 EQUIPMENT $

THIS SECTION NOT APPLICABLE

SUBTOTAL

12.0 FURNISHINGS $

THIS SECTION NOT APPLICABLE

SUBTOTAL

13.0 SPECIAL CONSTRUCTION $

THIS SECTION NOT APPLICABLE

SUBTOTAL

14.0 CONVEYING $

THIS SECTION NOT APPLICABLE

SUBTOTAL

21.0 FIRE SUPPRESSION $

THIS SECTION NOT APPLICABLE

SUBTOTAL

22.0 PLUMBING $

THIS SECTION NOT APPLICABLE

SUBTOTAL

23.0 HVAC $

THIS SECTION NOT APPLICABLE

Page 14 LOBBY MILLWORK

MILLWORK LF: 55

ITEM

NO

DESCRIPTION EST UNIT UNIT COST TOTAL

CONSTRUCTION

COST

DESCRIPTION: 100% CONSTRUCTION DOCUMENTS COST ESTIMATE - LOBBY

MILLWORK REPLACEMENT

PROJECT: OCTA CTO4 - FACILITY MODIFICATIONS AT SANTA ANA BUS BASE

OPERATIONS BUILDING

26.0 ELECTRICAL $

THIS SECTION NOT APPLICABLE

SUBTOTAL

27.0 COMMUNICATIONS $

THIS SECTION NOT APPLICABLE

SUBTOTAL

28.0 ELECTRONIC SAFETY & SECURITY $

THIS SECTION NOT APPLICABLE

Page 15 LOBBY MILLWORK