Automatic Transfer Switch PM Checklist for City of Phoenix Public Works Department
This is a preventive maintenance (PM) checklist document for the City of Phoenix Public Works Department outlining comprehensive inspection, testing, and maintenance procedures for automatic transfer switches (ATS) and paralleling gear equipment. The checklist specifies 15 primary maintenance operations that contractors must perform on ATS units across multiple municipal facilities, including thermal imaging scans, conductor termination inspections, contact erosion assessment, moisture and contamination checks, dust removal, and contact replacement as needed. The detailed procedures require de-energization of equipment (unless equipped with isolation bypass), removal of arc chutes and pole covers for visual inspection, testing and recalibration of AC sensing and time-delay functions, manual operation testing of main contactors, cable and control wire connection verification with appropriate torque application, and cabinet cleaning with approved non-conductive solvents. The final maintenance step mandates post-repair functional testing to verify full system compliance with transfer time requirements, simulating power failures to confirm proper operation.
The PM checklist is directly associated with the City of Phoenix's sealed solicitation for automatic transfer switch testing, maintenance, and repair services covering over 130 ATS units deployed across multiple municipal departments including Fire, Aviation, Information Technology, Library, Parks and Recreation, Police, Public Works, and Street and Transportation facilities. Equipment ranges from 7 kW to 1,250 kW capacity. The three-year contract with two optional one-year extensions commences June 1, 2026, with sealed offers due March 12, 2026. Minimum contractor qualifications include three years of operational experience in ATS services and a current C-11 Electrical license from the Arizona Registrar of Contractors. The contract requires 24-hour emergency response capability with 30-minute initial response and one-hour onsite response for emergencies. Contractors must comply with robust Disadvantaged Business Enterprise (DBE) and Small Business Participation Plan requirements, tracking and reporting all DBE and small business engagement through the City's Certification and Compliance System with monthly documentation. The City reserves the right to award multiple contracts and allows offerors to bid on either the Aviation Department (Group 1) or Public Works Department (Group 2) segments separately.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
Public Works Department
Automatic Transfer Switch PM Checklist
Automatic Transfer Switches (ATS): shall be subjected to a maintenance and testing program that includes all of the following operations:
• Infrared/thermal image scan
• Inspection of conductor terminations, ATS’s control components, and electrical conductors.
• Inspection or testing for evidence of overheating and excessive contact erosion
• Removal of dust and dirt.
• Inspect for water, moisture, and critters.
• Replacement of contacts when required.
ATS and Paralleling Gear: shall be subject to inspection, testing, and maintenance program that includes all of the following operations:
1. Perform an infrared/ thermal image scan of ATS before any work is performed
2. Identify and note any issues that were identified during the infrared/ thermal scan to be addressed during the PM.
3. De-energize the ATS (if ATS is equipped with an isolation bypass feature, do not need to be de-energized)
4. Inspect ATS Conductor Connections and ATS’s Mechanical Switch, and it’s contact points. Repair any connections that show evidence of failure, erosion, pitting, corrosion, and overheating.
a. Inspect all conductor terminations for evidence of hot spots at termination points, and look for evidence of termination corrosion, and loose connections. If conductors have crimped ring terminals- inspect for fit and/ or lose crimped points, corrosion, and evidence of failure at the crimped connection.
b. Inspect all conductors for evidence of hot spots on conductors for overheating and/ or failing conductor insulation
c. Inspect for evidence of hot spots at mechanical connections of the ATS check/verify contact points for evidence of pitting and/or erosion
5. Remove the arc chutes and pole covers. Consult the manufacturer’s information for proper procedure. This step will allow visual inspection of the main and arcing contacts…. Inspect all main arcing contacts for excessive erosion and/or pitting.
Arcing contacts are intended to be sacrificial by nature. They take the brunt of the energy when making or breaking the load. Careful attention should be paid to these contacts.
6. Inspect ATS and Cabinet for moisture or signs of Water, moisture, critters, and previous wetness or dripping.
7. Test and recalibrate all AC sensing and time-delay functions in the switchgear.
Depending on the manufacturer, the steps required will vary.
8. Vacuum the accumulated dust from the switchgear and accessory panels. Never use air to blow out dirt. Subjecting the transfer switch mechanism to compressed air may have a detrimental effect by forcing dirt and debris into the switch mechanism.
9. Inspect all control relay contacts and wiring for excessive erosion and discoloration due to excessive heat. Inspect all control wiring, connection points, and relays for discoloration, and evidence of rodent and insect damage (chewed wires, excessive spider webs, reptiles, and nests)
10. Manually operate the main contactor for transfer movement to check proper contact alignment, deflection, and sliding/ wiping action. (The sliding action is performed after two opposing contacts make contact. This wiping action helps to reduce the influence of film or dust that collects on the surface of contacts).
11. Check all cable and control wire connections to the transfer switch controller, sensing panels, and other system components. Tighten if necessary.
12. Inspect all electrical conductors and wiring connections and re-torque connections if needed. Inspect conductors for cuts or damage to the insulation. If conductors have splice points-inspect splices for snugness, inspect insulating material that is protecting splices from cuts, missing tape, discoloration, moisture and evidence of failure, and repair if necessary.
13. Clean ATS Cabinet and its components from grime with an approved non-conductive solvent. Consult the original equipment manufacturer (OEM) for a recommendation
14. Repair and/or replace defective equipment.
15. Post-Repair/Installation Functional Testing: A full system retest (e.g., simulate power failure post-repair) to verify compliance with transfer times (e.g., <10 seconds for Level 1).
16. Scheduled Maintenance Program label, to be installed one per facility at the electrical service. Include the date completed and a legible name and signature from the electrician completing the maintenance.
17. Comment on overall condition of service and enclosures.