PSB 26-4 Pre-Proposal Meeting Recording_10152026.mp4
MP4 file 244 MB Posted
- Attached to
- PSB 26-4 Professional Services Bulletin
- Solicitation number
- 27-557THA-ENGCO-B-54477
- Issued by
- Morgan County, Illinois
About this file
This file is a pre-proposal meeting recording from the Illinois State Toll Highway Authority (Illinois Tollway) for PSB 26-4, a solicitation for professional services contracts supporting Phase II engineering and design work. The solicitation encompasses fourteen contracts (I-26-20000 through I-26-60000 and RR-26-30000 through RR-26-40000) involving roadway reconstruction and bridge rehabilitation across multiple tollway corridors, including the Reagan Memorial Tollway (I-88), Tri-State Tollway (I-294 and I-94), Jane Addams Memorial Tollway (I-90), Veterans Memorial Tollway (I-355), and Illinois Route 390 Tollway, spanning Ogle, DeKalb, Kane, Cook, DuPage, Lake, and Winnebago counties. Statements of Interest were due by 4:30 p.m. Central Time on October 30, 2026. An optional in-person pre-proposal networking meeting was held on October 15, 2026, at the Marriott Chicago Naperville with required registration. Questions were due by October 21, 2026, at 4:30 p.m. Central Time via the Trimble Unity Construct SOI Mailbox. Phase II design services are anticipated to be completed 12 to 24 months after authorization to proceed, with substantial completion dates ranging from 24 to 48 months depending on project scope. Electronic submission was mandatory; paper responses were not accepted.
Prime consultants must be prequalified by IDOT in specified categories including Highways (Freeways), Structures (Highway: Typical or Complex), Environmental Reports, and special services. Key personnel must include Illinois-licensed professional engineers and structural engineers. Direct labor multipliers of 2.8 apply to Phase I and II services. All projects include Disadvantaged Business Enterprise (DBE) participation goals ranging from 17 to 28 percent and Veteran-Owned Small Business (VOSB) participation goals of 3 percent; consultants must demonstrate good faith efforts to meet these goals and may request waivers if sufficient commitments cannot be secured. Project construction estimates range from Category A ($0-$25 million) to Category F ($150-$200 million). All respondents must complete the applicable vendor disclosure form and certify compliance with Illinois procurement regulations, including prohibitions on forced labor in apparel procurement.
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .