Proposed_Renovation_Layout.pdf

PDF 408 KB Posted

Attached to
Airport Annex Gym Renovation
Solicitation number
2025-RFP-007
Issued by
Greenwood County, South Carolina

About this file

This is a proposed floor plan attachment for Greenwood County's Airport Annex Gym renovation project, RFP Number 2025-RFP-007. The document illustrates the architectural modifications required for the partial renovation of the approximately 10,000 square-foot facility. The layout diagram identifies three key construction elements: the addition of a 2-hour fire-rated wall, the removal of existing structures, and the installation of non-fire-rated additions. The project objectives include dividing the building into two distinct fire areas, with the front section designated for general office space and the rear section for storage purposes. The non-mandatory pre-proposal meeting was scheduled for April 16, 2025, at 1:00 pm, with proposal submissions due by April 24, 2025, at 10:00 am. The proposed layout indicates complex reconfiguration of various rooms including an activity room, restrooms, kitchen, and bedroom spaces, reflecting the comprehensive nature of the renovation scope.

The renovation project emphasizes the time-sensitive nature of construction, requiring vendors to submit detailed timelines for project completion. Evaluation of proposals will utilize a point-based system with cost weighted at 55%, firm expertise at 15%, timeliness at 15%, materials and approach at 10%, and local preference at 5%. Proposers must demonstrate possession of a valid South Carolina Contractor's license and submit comprehensive proposal packages including a cover sheet, firm experience documentation, references, and certificates of insurance. Compliance requirements mandate drug-free workplace maintenance, adherence to non-discrimination policies, and equal opportunity provision compliance. No specific budget range was disclosed by the county, and no incumbent vendors were identified. The county reserves the right to reject any or all proposals and will not reimburse vendors for proposal preparation costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

Proposed Floor Plan Changes

2-hour Fire Rated Wall Addition

Remove Existing Structure

Non-Fire Rated Additions

File details come from the government source that posted it. Updated .