ProposalAddendumOne.pdf

PDF 364 KB Posted

Attached to
File No. 751/17282. BDW - Lexington State Harbor
Solicitation number
RFP-171-180000002091-3
Issued by
Huron County, East Grand Rapids City, Michigan

About this file

This is Addendum #1 issued by the State of Michigan Department of Technology, Management and Budget for the Lexington Harbor Study project for the Department of Natural Resources, with proposals due April 19, 2018. The addendum provides clarification that the proposal should be for the Phase 100 Study only, which must include review of operations and staffing recommendations. The study involves property where upland areas are owned by the Village of Lexington while improvements are owned by DNR, with an existing lease agreement between the two entities that must be incorporated into the study discussion.

Submission requirements specify that bidders must provide 4 hard copies of the proposal and 3 flash drives containing electronic versions, plus submission through the Sigma system. The addendum includes a pre-proposal meeting sign-up sheet and requires bidders to acknowledge the addendum by returning two signed copies with their proposal. Additional pricing details, funding information, and specific contract terms are not included in this addendum document.

View the file

Other files

File Type Posted
17282 RFP.pdf PDF
17282 EXAMPLE Study Report_Part2.pdf PDF
17282 Project Statement.pdf PDF
17282 EXAMPLE Study Report_Part1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DMB-406 (R 4/09)

STATE OF MICHIGAN Date Issued: April 17, 2018 Department of Technology, Management and Budget Index No(s):

Facilities and Business Services Administration File No: 751/17282.BDW General Office Building, 3B Department: Natural Resources P.O. Box 30026 Project Name: Lexington Harbor Lansing, Michigan 48909 Study Subject: Addendum #1

Proposal Due Date: April 19, 2018 (Unchanged)

ADDENDUM NO. 1

TO: All Bidders

SUBJECT: Revision to Request for Proposal

INTENT: This Addendum is issued to make the following changes, clarifications and/or corrections

ITEM 1 - Information – Pre-Proposal Meeting Sign-up Sheet Provided (Attached) ITEM 2 - Information – The upland areas are owned by the Village of Lexington. The improvements are owned by DNR. There is a Lease Agreement between DNR and the Village and must be part of the Study Discussion.

ITEM 3 - Change - The proposal is to be for the Phase 100 Study ONLY.

ITEM 4 - Information - The Study should also review Operations such as staffing recommendations.

ITEM 5 - Information - Please submit 4 Hard Copies of the proposal and 3 Flash Drives with the proposal in electronic format. The proposal is to be submitted through Sigma as well.

ITEM 6 - Change - The proposal is to be for the Phase 100 Study ONLY.

ACKNOWLEDGEMENT: Two copies of this Addendum, properly signed in the space provided below, must be acknowledged and returned with the bidder's proposal for submission of a valid proposal.

The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)

Firm Name

Bidder's Signature Date

Sincerely, Bruce Watkins, P.E. , Project Director Design and Construction Division State Facilities Administration

Lansing, Michigan 48909 Study

File details come from the government source that posted it. Updated .