17282 Project Statement.pdf
PDF 85 KB Posted
- Attached to
- File No. 751/17282. BDW - Lexington State Harbor
- Solicitation number
- RFP-171-180000002091-3
- Issued by
- Huron County, East Grand Rapids City, Michigan
About this file
This is a Project Statement from the Michigan Department of Technology, Management and Budget's Design and Construction Division for professional design services at Lexington State Harbor in Lexington, MI. The project seeks design improvements including pier structure upgrades, toilet/shower building replacement, pylon replacement, parking improvements, and ADA compliance measures. Proposals are due April 19, 2018 at 2:00 PM EST, with a mandatory walk-through inspection scheduled for April 12, 2018 at 10:00 AM at 7411 Huron Ave. The project consists of two phases: a study phase to be completed by August 2018 and a design phase to be completed by December 2018. The scope includes site investigation, topographic survey, physical evaluation of existing facilities, underwater evaluation, market study, community engagement, and final design services.
The professional service provider must demonstrate at least 5 years of experience in conducting market evaluations and studies, working with Great Lakes Harbor facilities, and previous work/familiarity with the USACE. The project requires multiple meetings including pre-proposal, status meetings, community presentation, and final study review. The work must comply with all federal (EPA, OSHA, DOT), state (DCH, DEQ, DNR, MIOSHA), and local regulations. Questions regarding the RFP will be accepted until April 13, 2018. The project references a previous study completed for East Tawas State Harbor as a guide, though not prescriptive, and includes coordination with the Village of Lexington for blending upland design elements with adjacent lands.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17282 RFP.pdf | ||
| 17282 EXAMPLE Study Report_Part2.pdf | ||
| 17282 EXAMPLE Study Report_Part1.pdf | ||
| ProposalAddendumOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-427 (R 6/16)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
P.O. Box 30026 Lansing, Michigan 48909
FILE NUMBER
751/17282.BDW
INDEX NUMBER(S)
PROPOSAL DUE DATE
4/19/2018, 2:00 pm EST
CLIENT AGENCY
Natural Resources - Parks & Recreation Division
PROJECT NAME AND LOCATION
Lexington State Habor, Lexington, MI PROJECT ADDRESS (if applicable) 7411 Huron Ave, Lexington, MI 48450
CLIENT AGENCY CONTACT
Jordan Byelich & John Terpstra
TELEPHONE NUMBER
517-284-6087/248-672-7584
DTMB - DCD PROJECT DIRECTOR
Bruce Watkins
TELEPHONE NUMBER
517-242-7882
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
April 12, 2018 at 10:00am Local Time, at the Site, 7411 Huron Ave, Lexington, MI 48450.
MANDATORY (Check box if Mandatory)
LEIN CHECK (Dept. of Corrections ONLY) Submit request to: name of contact at name of facility, phone number no later than 12:00 p.m. on the 3rd day prior to the scheduled Walk-Through. Please include in your request, the project name and date, time and place of the Pre-Proposal Walk-Through.
PROJECT DESCRIPTION/SERVICES REQUESTED
General: For the Lexington State Harbor - DNR is seeking design improvements to include improvements to the pier structure, toilet/shower building replacement, pylon replacement, parking improvements and addressing ADA compliance. Provide Professional Design Services for evaluation, use analysis, future market, local input, customer (user) input and preparation of a Final Study presenting the results and recommendations. The Study is to include options for future development/redevelopment/repairs to the Harbor. Following the Study and owner selected option, provide Preliminary and Final Design for the chosen improvements. Cost Estimates for construction will be required along the way and will be used to guide the owner in shifts in priorities as the study and design proceeds.
Study: Provide site investigation to include, but not be limited to, topographic survey, physical evaluation of the existing building and dock facilities. Underwater evaluation must be included as part of the investigation. Using the investigation, provide and assessment of the current facilities. The Study shall also include a market study to identify trends, survey(s) (online or other), public meeting with the community and communication with the Village of Lexington. There will not be sediment transport studies for this work, BUT, incorporation of the most current information from the ongoing USACE Study of the Harbor. Attached is a copy of the Study completed for the East Tawas State Harbor for reference. This is not to be taken as a prescriptive of the desired Study, BUT it does indicate the tasks for the Study in greater detail. Additionally, the Village of Lexington wishes to blend upland design elements with their adjacent lands, this should be included in the Study.
Design: Meet with the owner to select the desired recommended option from the Study. Provide Phase 400 Preliminary Design, including required permitting and all tasks associated with Phase 400. Provide Phase 500 Final Design Services to incorporate the permits and other tasks to provide final bid documents.
Experience Requirements: The professional must be able to demonstrate at least 5 years of experience in conducting market evaluations and associated studies and similar experience in working in Great Lakes Harbor facilities and demonstrate previous work/familiarity with the USACE.
Minimum Expectations of meetings: There will be minimum expectations of meeting with the owner to discuss the project and present status. If, in the opinion of the Professional, additional meetings are necessary, please note as such. This list is not to include inspections or other site work required to provide the deliverables required.
Study: 1 Preproposal meeting, 2 Status meetings, 1 Community presentation, 2 Final Study Review.
Design: 1 Option Selection meeting, 3 Status meetings.
Please note, online (Go to meeting) may be added to this list of meetings, or may replace a few of them if the subject matter does not require face to face meetings.
NIGP CODES
90607, 90610, 90638, 90642, 90646, 90656, 90657, 90672, 90692, 92507, 92517, 92533, 92542, 92548, 92588, DESIRED SCHEDULE OF WORK
Study to be completed at the end of the boating season (8/2018), Design to be completed by 12/2018.
ACCEPTING RFP QUESTIONS UNTIL: 4/13/2018
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)
Attachment(s)
Study Report - East Tawas State Harbor
File details come from the government source that posted it. Updated .