Proposal Price Response Form -RFP-PRC-FY26-0542.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Fantasy of Lights Event Services
Solicitation number
RFP-PRC-FY26-0542
Issued by
Santa Clara County, California

About this file

This is a Proposal Price Response Form for RFP-PRC-FY26-0542 submitted to the County of Santa Clara, California for Fantasy of Lights Event Coordination Services. The solicitation requests pricing for comprehensive event support services organized into seven primary categories: generators (75 KW and 45 KW units), miscellaneous power distribution equipment including cables, adapters, and distribution boxes, man lifts ranging from 45 feet to 125 feet, walk-thru event items such as patio heaters and light towers, diesel fuel, contractor personnel and labor across multiple roles including supervisors and technicians, and miscellaneous items including site storage, tools, and transportation equipment. The pricing structure reflects an 11-week estimated rental term for most equipment, with specific variations for man lifts (3-8 weeks) and walk-thru event items (1-2 days or shows). Quantities vary significantly across line items, from single units to hundreds of items, such as 300 three-outlet power adapters and 100 outdoor 12/3 Edison U-Ground 100-foot cables. Labor costs are itemized by position type with estimated hours ranging from 16 hours for boom operators to 3,210 hours for install technicians.

The proposal form requires bidders to provide weekly rental prices for equipment and hourly rates for labor, with all prices submitted exclusive of sales tax and government-imposed fees calculated by the County upon award. The form includes two supplemental questions addressing cost-saving opportunities, requesting bidders to confirm whether rental rates represent the lowest available from their company and to propose additional efficiency measures or pricing reductions. All line items in the pricing schedule currently display placeholder values of zero dollars, indicating the form template awaiting completed pricing information from responding vendors. The Grand Total field similarly shows zero dollars pending submission of actual bid prices across all seven sections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Response Form

PROPOSAL PRICE RESPONSE FORM

RFP-PRC-FY26-0542 for Fantasy of Lights Event Coordination Services

PROPOSER INFORMATION:

Print Name:
Email:
Telephone No.:
Date:

I. PROPOSAL PRICE RESPONSE FORM

Bidder: Do not change the format of this form.

1. Prices should NOT include sales tax and other government imposed and established fees as the County will calculate applicable taxes and fees upon award.

2. Reference Attachement 2 to Appendix A for additional information.

3. "*" indicates that the line is taxable.

Section 1: Generators
Line #Item DescriptionQuantityUnit of MeasureEstimated Rental TermWeekly Rental PriceExtended Price
175 KW Generator4Per Week11$ - 0
245 KW Generator6Per Week11$ - 0
345k Generator - Office1Per Week20$ - 0
Section 1 Total$ - 0
Section 2: Miscellaneous Power Distribution
Line #Item DescriptionQuantityUnit of MeasureEstimated Rental TermWeekly Rental PriceExtended Price
1Outdoor Distro, 12/5 Cam-Thru*5Per Week11$ - 0
2Outdoor 50AMP Sub-Panel Cam-Lok*1Per Week11$ - 0
3Distro, Socopex 120V 4-output*1Per Week11$ - 0
44/0 400 Amp. Cable 100’*5Per Week11$ - 0
54/0 400 Amp. Cable 50’*6Per Week11$ - 0
64/0 400 Amp. Cable 25’*3Per Week11$ - 0
72/0 298 Amp. Cable 100’*12Per Week11$ - 0
82/0 298 Amp. Cable 50’*6Per Week11$ - 0
92/0 298 Amp. Cable 25’*4Per Week11$ - 0
10#2 195 Amp. Cable 100’*4Per Week11$ - 0
11#2 195 Amp. Cable 50’*2Per Week11$ - 0
12#2 195 Amp. Cable 25’*3Per Week11$ - 0
13Cam-Lok Device “T”s*6Per Week11$ - 0
14Cam-Lok Device “W”s*3Per Week11$ - 0
15#2 195 Amp. Bare End Tails*1Per Week11$ - 0
16Cam-Lok Female Adapters*4Per Week11$ - 0
17Cam-Lok Male Adapters*10Per Week11$ - 0
18Lg. 6cir. 2K Multi Package*1Per Week11$ - 0
19Distro, 12/5 INDU End Box*5Per Week11$ - 0
20Distro, 12/5 Outdoor Dog House*20Per Week11$ - 0
2150’ 3-Box Stringer (12/5, L21-20)*e25Per Week11$ - 0
22Outdoor 12/5 Twistlock 200*24Per Week11$ - 0
23Outdoor 12/5 Twistlock ( L21-20) 150*8Per Week11$ - 0
24Outdoor 12/5 Twistlock ( L21-20) 100*21Per Week11$ - 0
25Outdoor 12/5 Twistlock ( L21-20) 075*15Per Week11$ - 0
26Outdoor 12/5 Twistlock ( L21-20) 50*20Per Week11$ - 0
27Outdoor 12/5 Twistlock ( L21-20) 25*8Per Week11$ - 0
28Bare End Tails To (M) 50 Amp*2Per Week11$ - 0
2950 Amp. OUTDOOR Spider Box*13Per Week11$ - 0
3050 Amp. Spider Box*10Per Week11$ - 0
3150 Amp SO Cable 10024Per Week11$ - 0
3250 Amp SO Cable 5018Per Week11$ - 0
3350 Amp SO Cable 2520Per Week11$ - 0
34Distro, Edison Nutech (12x20A) Cam Thru3Per Week11$ - 0
35Lg. 12/3 AC Package / Edison U-Ground6Per Week11$ - 0
36Lg. 16/3 AC Package / Edison U- Ground*10Per Week11$ - 0
37Outdoor 12/3 Edison U-Ground 100’*100Per Week11$ - 0
38Outdoor 12/3 Edison U-Ground 50’*70Per Week11$ - 0
39Outdoor 12/3 Edison U-Ground 25’*60Per Week11$ - 0
403 Outlet Power Adapter – 3- Fer*300Per Week11$ - 0
41Edison Adapters*40Per Week11$ - 0
42Cable Ramps*60Per Week11$ - 0
43ADA Cable Ramps 3’*8Per Week11$ - 0
44ADA Cable Ramps 18"*20Per Week11$ - 0
45Mobile Office Power Transformer*1Per Week20$ - 0
Section 2 Total$ - 0
Section 3: Man Lifts
Line #Item DescriptionQuantityUnit of MeasureEstimated Rental TermWeekly Rental PriceExtended Price
145’ Boom Lift* (8 weeks install only)1Per Week8$ - 0
260’ Boom Lift* (4 weeks install, 2 weeks teardown)2Per Week6$ - 0
3125’ Boom Lift*1Per Week3$ - 0
Section 3 Total$ - 0
Section 4: Walk-Thru Event Items
Line #Item DescriptionQuantityUnit of MeasureEstimated Rental TermWeekly Rental PriceExtended Price
145KW Generator*1Per Week1$ - 0
275KW Generator*1Per Week1$ - 0
3Fire Extinguishers*1Per Week1$ - 0
4Bike Barricades*10Per Week1$ - 0
5Patio Heaters*42Per Day2$ - 0
6Light Tower*8Per Day2$ - 0
7Extra Propane Tanks*6Per Day2$ - 0
8Area Lighting*1Per Show2$ - 0
Section 4 Total$ - 0
Section 5: Diesel Fuel
Line #Item DescriptionQuantityUnit of MeasureEstimated Rental TermPriceExtended Price
1Diesel fuel for generators1000Per GallonN/A$ - 0
Section 5 Total$ - 0
Section 6: Contractor Personnel/Labor
Line #Item DescriptionEstimated Number of StaffUnit of MeasureEstimated Number of HoursHourly RateExtended Price
1Install – Supervisor5Per Hour1,200$ - 0
2Install Technicians10Per Hour3,210$ - 0
3120’ Boom Operator (Install)1Per Hour16$ - 0
4Walk-Thru Supervisor1Per Hour67$ - 0
5Walk-Thru Technicians7Per Hour135$ - 0
6Show Call (aka during event) – 2 Supervisors2Per Hour426$ - 0
7Strike (aka Post Event) – Supervisors5Per Hour395$ - 0
8Strike (aka Post Event) – Supervisors10Per Hour246$ - 0
9Strike (aka Post Event) – Supervisors15Per Hour715$ - 0
10120’ Boom Operator (Strike)1Per Hour16$ - 0
11Shop Prep4Per Hour120$ - 0
12Project Manager – Pre Event2Per Hour80$ - 0
13Project Manager – Post Event2Per Hour80$ - 0
Section 6 Total$ - 0
Section 7: Micellaneous
Line #Item DescriptionQuantitiyUnit of MeasureEstimatede Rental TermPrice / Weekly Renatl PriceExtended Price
1Expendables (tape, plastic, etc.)*1EachN/A$ - 0
2Site Storage – Container/Office*1EachN/A$ - 0
3Administrative Supplies*1EachN/A$ - 0
4Tools, Cable Accessories, etc.*1EachN/A$ - 0
585ft. Tree Star Rigging*1EachN/A$ - 0
6Trucking1EachN/A$ - 0
7Utility Cart*1Per Week20$ - 0
86-Person Transport Cart*3Per Week16$ - 0
9¼ Pickup Truck*1Per Week20$ - 0
10Forklift*1Per Week2$ - 0
11Generator Moving Vehicle*1Per Week4$ - 0
12Fire Extinguishers*9Per Week11$ - 0
13Bike Barricades*27Per Week12$ - 0
Section 7 Total$ - 0
Grand Total$ - 0
II. ADDITIONAL QUESTIONS

The County is interested in cost-saving initiatives and inviting ideas from the Proposers on how to operate the event more efficiently. Please respond to the questions below and be thorough in your explanation, if any. Use additional space, if necessary.

YESNO
1Are the rental rates the lowest available from your company?
If "No" to questions, please explain:
YESNO
2Are there other additianl cost saving initiatives that the County should consider to receive better pricing (e.g. better rates, lower costs, etc.)?
If "Yes" to questions, please explain:
3Other cost-saving initiatives, if any:

image1.jpg

File details come from the government source that posted it. Updated .