Proposal Cost Form Final.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 24-06
- Issued by
- Clayton County, Georgia
About this file
The file is a Proposal Cost Form (Attachment B) for RFP #24-06 for the Winter Weather Supply and Storage Building project for Clayton County, Georgia. The document is a detailed cost breakdown spreadsheet that provides a comprehensive template for pricing various project phases including Schematic Design, Design Development, Construction Documents, Bid/Negotiation, and Construction Administration. The form allows contractors to itemize costs across multiple categories such as insurance, general conditions, general administrative expenses, and specific construction elements like foundation, concrete, structural, electrical, plumbing, HVAC, doors, carpentry, and equipment.
The cost form includes a note specifying that the total project cost encompasses all labor, materials, equipment, tools, supervision, scheduling, safety program, coordination, engineering, testing, surveys, layout, cleanup, and other services required to complete the project. Additionally, the form indicates that all permit fees will be the contractor's responsibility. The document is structured to capture both the detailed line-item costs and provide a total project cost, with a section for optional add-alternate services including fencing, area paving, and gas connection for heat. The form requires a signature, company name, title, and date, suggesting it is part of a competitive bidding process for the winter weather supply and storage building project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 24-06.pdf | ||
| 24-06 ADD 1.pdf | ||
| 24-06 ADD 2 EXH 1.pdf | ||
| 24-06 ADD 1 EXH 1.pdf | ||
| 24-06 ADD 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Schematic Design (Site Development) | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Schematic Design (Site Development) | $ - 0 | |
| Design Development | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Design Development | $ - 0 | |
| Construction Documents | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Construction Documents | $ - 0 | |
| Bid/Negotiation | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Bid/Negotiation | $ - 0 | |
| Construction Administration | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Bid/Negotiation | $ - 0 | |
| Total Cost of the Project | $ - 0 | |
| Add Alternates - Provide cost for optional services | ||
| Fencing | ||
| Area Paving | ||
| Gas connection for Heat |
Note: The Total Cost includes and encompasses the cost of all labor, materials, equipment, tools, supervision, scheduling, safety program, coordination, engineering, testing, surveys, layout, cleanup, and other things and services required to complete the entire Project in strict conformity with the Specifications, the Contract, all addenda, and authorized written clarifications issued prior to the Proposal date. All Permit Fees will be the responsibility of the contractor.
| _______________________________________________________________ _______________________________________ |
| Name Title |
| _______________________________________________________________ ______________________________________________ |
| Signature Date |
| ________________________________________________________ |
| Company Name |
RFP #24-06 Winter Weatehr Supply and Storage Building
ATTACHMENT B - PROPOSAL COST FORM