24-06 ADD 2 EXH 1.pdf

PDF 39 KB Posted

Attached to
Winter Weather Supply and Storage Building for Clayton County, GA
Solicitation number
24-06
Issued by
Clayton County, Georgia

About this file

These architectural drawings prepared by the Clayton County Department of Transportation and Development depict the floor plan and front elevation for a Public Works Salt/Sand Storage Building. The floor plan reveals a 58' x 56' structure with specific electrical requirements, including one switch per bay, lights wired accordingly, a 220V GFI outlet, a 110V external GFI outlet, and a small breaker panel. The front elevation shows a curved, arched roof structure with multiple 14' sections and specific door and wall configurations.

The building design includes detailed specifications such as a finished floor elevation, a yellow line marker positioned 8'-0" above the floor, and doorways and end walls to be fabricated with a canopy. The structure appears designed for winter weather supply storage, with a brine machine located within the facility. The drawings are dated February 2023 and drawn at a 1/8" = 1' scale, indicating a precise architectural plan for a specialized storage facility for Clayton County's Public Works department.

View the file

Other files

File Type Posted
RFP 24-06.pdf PDF
24-06 ADD 1.pdf PDF
24-06 ADD 1 EXH 1.pdf PDF
24-06 ADD 2.pdf PDF
Proposal Cost Form Final.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18’-6

58’

56’

80’

30’

MACHINE

BRINE

18’-6

18’-6

THERE IS ONE SWITCH PER BAY

LIGHTS TO BE WIRED SUCH THAT

AND ONE GFI OUTLET 220V

ONE EXTERNAL GFI OUTLET 110V

SMALL BREAKER PANNEL WITH

DATE:

SHEET:

CHK: FILE NAME:

DRAWN BY:SCALE:

PUBLIC WORKS

SALT/SAND STORAGE BUILDING

1/8" = 1’

DRAWING PREPARED BY:

THE CLAYTON COUNTY DEPARTMENT

OF TRANSPORTATION AND DEVELOPMENT

KBR

FLOOR PLAN

A

A

NOTE: SEE SHEET 7 FOR SECTION A-A

02-13-2023

3-7

28’

SEE ATTACHED SAMPLES FOR

ROOF STRUCTURE DETAILS

FINISHED FLOOR

’FILL TO LINE’

Bottom of 8" solid yellow line to be located at 8’-0" above the finish floor elevation.

DOORWAYS AND END WALL

TO BE FABRICATED w. CANOPY

14’

14’ 14’

7’

30’

4’-5

"4’-5

DATE:

SHEET:

CHK: FILE NAME:

DRAWN BY:SCALE:

FRONT ELEVATION (DOOR LAYOUT)

PUBLIC WORKS

SALT/SAND STORAGE BUILDING

1/8" = 1’

DRAWING PREPARED BY:

THE CLAYTON COUNTY DEPARTMENT

OF TRANSPORTATION AND DEVELOPMENT

02-14-2023

KBR4-7

File details come from the government source that posted it. Updated .